Loading…
Tender Value
₹9.8 L
EMD Value
₹19,600
Closing Date
18 Jun 2026, 6:00 pm
EE WR Division Bharatpur
EE WR Division Bharatpur
Renovation of Bhatawali Bundh Block Kumher, District Deeg.
2026_WRDAS_565410_4
NIT 02/2026-27
Open Tender
Civil Works
182 days
under jurisdiction of EE Bharatpur Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹19,600
Yes
6 Jun 2026
6 Jun 2026
19 Jun 2026
6 Jun 2026
18 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and fixing of sluice/regulator gates for canal using MS plates, channels, tees, angles, girders etc. of given size and design having suitable brass/gunmetal lining, rubber seals etc. and desired rod length, capstan head, clamps keys, hoisting plateform, ladders, supports, etc. complete (excluding civil works) including painting with zinc rich primer& epoxy paint & delivery at site.
Add extra, if the opening size is greater than 3 sqm upto 5 sqm requiring heavy channel/girders. | 2,400 | kg | 153 | ₹3,67,200 |
| 2 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 64,750 | Sqm | 1.45 | ₹93,887.5 |
| 3 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm | 85.82 | Sqm | 480 | ₹41,193.6 |
| 4 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m
Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 90% | 1,551.47 | Cum | 109 | ₹1,69,110.23 |
| 5 | Compaction of earth or highly weathered strataBy manually or plain roller. (density 90% of Proctor) | 1,551.47 | Cum | 25 | ₹38,786.75 |
| 6 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 1,551.47 | Cum | 12.6 | ₹19,548.52 |
| 7 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5
Masonry work in superstructure | 28.71 | Cum | 4,589 | ₹1,31,750.19 |
| 8 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20 mm | 171.64 | Sqm | 314 | ₹53,894.96 |
| 9 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20 mm | 10.5 | Cum | 6,091 | ₹63,955.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1006228.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid