Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.6 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
₹11.9 L
EMD Value
₹24,000
Closing Date
21 Dec 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EEMGCCD 12 ALIGARH
EEMGCCD 12 ALIGARH
Construction of D.R.B. at Km 1.024 of Naroli Minor in Dist. Moradabad
2021_UPIDC_657216_23
06/EE/2021-22
Open Tender
Civil Works
Item Rate
90 days
SAMBHAL
Construction of D.R.B. at Km 1.024 of Naroli Minor in Dist. Moradabad
2 documents required · 2 mandatory
₹854
₹24,000
31 Aug 2022
16 Dec 2021
21 Dec 2021
16 Dec 2021
21 Dec 2021
16 Dec 2021
16 Dec 2021 - 21 Dec 2021
90 days
Amount
Dismantling of flexible pavement and disposal of dismantled material upto a lead of 1000mtrs, stacking serviceable and disposal of unserviceble materials separately within a lead of 50mtrsas per direction of Engineer-in-charge
E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the size of foundation
Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc.
Class - 150 ( Non modular ) brick work in 1:4 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work.
Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions.
Centering and Shuttering in of R.C.C. work including all labour , T&P, etc.
Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work.
Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work.
S/f tar paper bearing over bed block.
Providing & Fixing wheel guard of size 150 x 150 x 900 including cost of all labour and T&P etc. Complete/Nos.
S/F Fixing Marble Name Plate of Size 300 x 200 x 25 mm including cost of all labour and T&P etc. Complete./Nos.
S/Fixing Marble B.M.Plate of Size 150 x 150 x 25 mm including cost of all labour and T&P etc. Complete./Nos.
Earth work in making Ramp and with compaction in 20.00 cm layers and dressing and also including labour T&Petc required for completion of work
Earth work in making of Diversion with compaction in 20.00 cm layers, dressing and also including labour T&P etc required for proper completion of work. /CUM
Earth work in Disposal of Earth from the road of Diversion including cost of all labour and T&P etc complete. /CUM
Providing Brick on edge Soling on Diversion Road including cost of all labour and T&P etc. Complete. /Sqm
Dismantling of Brick on edge Soling form Diversion road including cost of all labour and T&P etc. Complete. /Sqm
Supplying & fixing 75mm.dia streel pipe for rain spout.
Supply and Fixing of M.S. Angle Sign Board 60x90 including cost of material,Taxes, labour T&P etc Complete,But excluding of G.S.T.per Nos.:
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .