Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical DUTTA BAGAN SEN RALEIGH ROAD ASANSOL BARDHAMAN BARDHAMAN 713305 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713305 | - | Rejected-Technical As per TCR |
Tender Value
₹4.5 L
EMD Value
₹5,700
Closing Date
29 Jul 2024, 9:00 amClosed
Area Engineer (EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Complete repairing and conversion of 500 kVA 11kV/550V to 11 kV/440V lighting transformer of Sl. No. PND/TL/3364 under Pandaveswar Colliery.
2024_ECL_312810_1
GM-PND/EandM/24-25/21/244 dated 16/07/2024
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Pandaveswar Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,700
2 Nov 2024
19 Jul 2024
30 Jul 2024
19 Jul 2024
29 Jul 2024
19 Jul 2024
19 Jul 2024 - 22 Jul 2024
Amount
Complete repairing and conversion of 500 kVA 11kV/550V to 11 kV/440V lighting transformer of Sl. No. PND/TL/3364 under Pandaveswar Colliery. (Inclusive of EPF/CMPF)
Dismantling of core & winding from Transformer tank drain out of Transformer oil, opening of top cover etc.
Cost of Bare copper conductor for Primary Coil.
Cost of Bare copper conductor for Secondary Coil.
Cost of TPC (Tripple Paper Covering) for Bare copper conductor.
Cost of insulation materials cotton tape, glass tape, pacement paper, synthetic cork sheet, nomex paper etc.
Cost of DA Oxygen, Brazing rod.
Cost of neoprene synthetic gasket at top cover and inspection cover.
Dehydration & Filtration of Transformer oil to raise the di-electric strength of oil up to required value.
Cost of Primary Terminal bushing with current carrying contacts.
Cost of secondary Terminal bushing with current carrying contacts.
Fabrication cost with supply of MS Sheet to housed the secondary terminal Insulator.
Design Charges of above Transformer from 11KV/550V to 3.3KV/440 Volt.
Labour Charges for formation of Coil assy. of coil and interconnection.
Supply & fixing of Tape changer switch including mechanism arrangement & alignment with transformer tank.
Cost of Painting Charges of the above transformer by one coat of primmer paint & two coat of Metallic paint.
Installation of above transformer at Sub Station with pre-commissioning testing.
Supply of New Transformer Oil duly filtered.
Transportation charges both up & down.
Less : Scrap value of Copper of Primary Coil
Overhead & Profit
P.F. @ 12.72% on Total Labour
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
JUBILEE ELECTROMECH WORKS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .