Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC 4005 4TH FLOOR SKYLINE NEAR KADRU OVERBRIDGE KADRU DISTT RANCHI 834002 JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834002 | L1 | Accepted-AOC The L1 bidder is techno-commercially eligible and the rate quoted is reasonable and justified, which has been accepted by the Competent Authority, NK Area. | |
| 2 | L2₹1.9 L+₹14,430 (8.09%)Rejected-Finance LAXMI NAGAR PISKA MORE P O HEHAL RATU ROAD RANCHI 834 005 JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834005 | L2 | Rejected-Finance L2 |
Tender Value
₹2.0 L
EMD Value
₹2,500
Closing Date
18 Oct 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO EnM NK Area
GM Office, NK Area
Filtration of Transformer Oil alongwith Dielectric Strength (Breakdown voltage) testing and Dissolved Gas Analysis of Transformer oil of various transformers installed at Sub-station Quarry No. 01 and 02 and in mines under Purnadih OCP, NK Area
2023_CCL_290542_1
GM (NK)/EnM/e-NIT/2023-24/ 151
Open Tender
Electrical and Maintenance Works
Item Rate
21 days
Purnadih OCP
As per NIT
2 documents required · 2 mandatory
₹2,500
2 Nov 2023
7 Oct 2023
20 Oct 2023
7 Oct 2023
18 Oct 2023
7 Oct 2023
7 Oct 2023 - 11 Oct 2023
Amount
Filteration and heating of Transformer Oil (Total quantity of oil to be filtered from 10 nos. transformer is 4630 Litres).
Dielectric Strength (Breakdown Voltage) Test of Transformer Oil (For Testing minimum quantity taken as sample from each transformer is 800 ml, Total 10 nos. of sample of Transformer Oil is to be taken from 10 nos. of Transformer installed in mines for testing).
Dissolved Gas Analysis (C2H2, CO2, CO, C2H6, C2H4, H2, CH4, N2, O2, C3H81, C3H61) Testing of Transformer Oil (For testing minimum quantity taken as sample from each transformer is 50ml, Total 10 nos. of sample Oil Transformer Oil is to be taken from 10 nos. of Transformer installed in mines for testing)
Total impact of GST for the purpose of CTC
R AND S ELECTRICALS
stage.html
html • 0.04 MB
techsummary_300926.pdf
PDF • 0.23 MB
finsummary_300926.pdf
PDF • 1.21 MB
AOC_151.pdf
PDF • 1.87 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .