Loading…
Loading…
Tender Value
₹4.6 L
EMD Value
₹9,500
Closing Date
1 Sept 2026, 6:00 pm
SHRI DARSHAN KUMAR, EE
OFFICE OF GARRISON ENGINEER AIR FORCE VAYUSENA NAGAR NAGPUR- 440007
PROVN OF ARBORICULTURE FOR OTM ACCN FOR 11 LU, AF AT VSN, NAGPUR
2026_MES_774331_2
8829/E8
Open Tender
Civil Works
Item Rate
120 days
GE AF NAGPUR
As per tender docs
7 documents required · 7 mandatory
₹500
GE AF NAGPUR
₹9,500
18 Aug 2026
18 Aug 2026
3 Sept 2026
18 Aug 2026
1 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified & directed. | 550 | SQUARE METRE | - | - |
| 2 | Material and labour for digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth agter reduction by 20%; 1 part of stacked bolume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth if any with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately). Holes of size 0.6x0.6x0.6m (Exc of one posthole not exceeding 0.5cum) complete all as specified & directed. | 60 | EACH | - | - |
| 3 | All as per item No 2 above but holes of size 0.3x0.3x0.3m | 153.75 | EACH | - | - |
| 4 | Material and labour for removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified & directed. | 82.5 | CUBIC METRE | - | - |
| 5 | Material and labour for rough dressing the trenched ground including breaking clogs complete all as specified & directed. | 50 | 10 SQUARE METRE | - | - |
| 6 | Material and labour for uprooting weeds from the trenches area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation complete all as specified & directed. | 50 | 10 SQUARE METRE | - | - |
| 7 | Material and labour for fine dressing of the ground complete all as specified & directed. | 50 | 10 SQUARE METRE | - | - |
| 8 | Supplying and stacking good earth at site including royalty and carrige from outside defence area (earth measured in stacks will be reduced by 20% for payment) complete all as specified & directed. | 72 | CUBIC METRE | - | - |
| 9 | Supplying and stacking sludge at site including royalty and carriage from outside defence area (earth measured in stacks will be reduced by 8% for payment) complete all as specified & directed. | 35 | CUBIC METRE | - | - |
| 10 | Material and labour for mixing the sludge dump manure and good earth and spreading the mixture in required thickness (cost of sludge dump manure or good earth to be paid separately ) complete all as specified & directed. | 107 | CUBIC METRE | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
BOQ_879474.xls
BOQ • 0.41 MB
TENDERDOCS8829RETENDER.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].