Tender Value
₹4.0 L
EMD Value
₹7,905
Closing Date
28 Aug 2026, 5:00 pmClosed
THE EXECUTIVE ENGINEER MALDA DIVISION, P.H. ENGINE
DOULATPUR PHE COMPLEX, MALIHA MALDA-732102
Annual Operation Maintenance and Emergent repair of Iron Elimination Plant of Old Circuit House under Englishbazar Bolck under Malda Division, PHE Dte. in the District of Malda.
2026_PHED_1037312_18
WBPHED/EE/MD/NIeT_05 of 2026-2027
Open Tender
CIVIL WORKS
Percentage
365 days
DOULATPUR PHE COMPLEX, MALIHA MALDA-732102
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,905
Yes
15 Sept 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
28 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and Maintenance of IRP plant (Pressure type including providing an experienced operator including regular back wash by operation of compressor and blower machine etc. complete as per direction of EIC.
Note:- 1) Contractor have to pay Rs. 487.00/head/day to the Labourers engaged as Pump Operator/ Valve Operator/ Guards excluding 8.33% Bonus.
2) Bonus @ 8.33% should be given as per rules. Rate Analysis for ESIC & EPF with Ref Memo No PHE/1095/O-5/16(Pt.) dated 22.05.2025 3) Final Rate will be based on actual EPF & ESIC remmited. | 365 | /Day | 684 | ₹2,49,660 |
| 2 | Reimbersement of operators/Guard payment as per EPF & ESIC rules.
Note:-
1) Pump Operator/ Valve Operator/ Guards are entitled to get a weekly day of with a prior approval of the JE/AE in charge or will be paid as per the existing rules.
2) Payment will be made as per actual basis. Duly approved leave details & vouchers (if required) need to be submitted for payment. (Rate Analysis Attached) | 72 | /Day | 560 | ₹40,320 |
| 3 | Sundry and petty repair including periodical charges of Engine oil, Gear oil, required for Lubrication of all parts & periodical inspection and servicing by bonafide technician as required as per division of EIC. | 12 | /Month | 550 | ₹6,600 |
| 4 | Repairing of unserviceable spares of IRP in sluice valve, gunmetal valve etc. including supply of Nuts & Bolts & Washers, gland packing etc.; blower & Compressor petty repair work in case of immediate remedial measured to keep the maintenance work in order including hire charges of machine, the cost of replacement of any part in any of the unit of the plant spares (Elec. / Mech. / Hardware) : if for any occurrence, for replacing the Elec. / Mech. / Hardware spare the cost of which is more than Rs. 250/- (Rupees Two Hundred Fifty) only to be supported with cash memo from authorized dealer / manufacturer the extra payment would be made as per the actual cost 10% profit +2 % contingency charges towards transportation and handing it, as per direction of E.I.C. & his satisfaction.
In the event of –
N.B.:- Spare parts if any required for above item ,will be procured from local market with supply vouchers and the vouchers should be certified by the AE concerned for authenticity. | 1 | /Month | - | - |
| 5 | (a) Normal Maintenance. | 12 | /Time | 400 | ₹4,800 |
| 6 | b) Purchase of spares above Rs.250/- only if require. | 1 | /L.S. | 3,000 | ₹3,000 |
| 7 | Scraping the outer surface of shells of IEP and all other parts of IRP with brush, charcoals and painting the outer surface with enamel painting of approved quality including inlet, outlet pipe, sluice valve, oxidation chamber etc. (onetime/year) | 1 | /Time | 2,200 | ₹2,200 |
| 8 | Provisional arrear payment, if labour wages gets enhanced by the competent authority for daily operation of valves & pipe line inspection/IRP maintenance (This item will be paid only on production of the paid amount to the labour by the contractor based on order. | 1 | L.S. | 25,000 | ₹25,000 |
| 9 | Add Includng GST @18% | - | Nos | 0.18 | - |
| 10 | Add Includng CESS @1% | - | Nos | 0.01 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
Tendernotice_2.pdf
PDF • 1.08 MB
Tendernotice_3.pdf
PDF • 0.51 MB
Tendernotice_4.pdf
PDF • 0.16 MB
Tendernotice_5.pdf
PDF • 10.61 MB
BOQ_2549045.xls
BOQ • 0.37 MB
Corrigendum_I.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .