| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 CrAccepted-AOC 142 | ₹10.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹12.6 CrRejected-Finance | ₹12.6 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹15.1 CrRejected-Finance NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹15.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹16.6 CrRejected-Finance KRISHNA COMPLEX JAIN COLLEGE ROAD SAHARANPUR UTTAR PRADESH PIN CODE 247001 | SAHARANPUR | SAHARANPUR | UTTAR PRADESH | 247001 | ₹16.6 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹17.2 CrRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹17.2 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L1 | Durga Engineers and Earth Movers L4 | M/s Kaiser Construction Engineers and Contractor L2 | GSB DEVELOPERS PRIVATE LIMITED L3 | ARVIND KUMAR SINGH L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. (from km 36.000 to 160.000 of main canal) | 2,15,932.8 | Sqm | 0.5 ₹1.1 L | 5 ₹10.8 L | 9 ₹19.4 L | 20 ₹43.2 L | 15 ₹32.4 L |
| 2.00 | Earth work in cutting of internal section in canal, including all lift and lead. levelling, dressing with manual compaction i/c labour & machinery The earth from cutting to be used in side embankment or to be deposited as spoil bank as directed by Engineer- in-Charge. (from km 36.000 to km 80.000 of Agra canal in Haryana State) | 12,28,428.42 | Cum | 36 ₹4.4 Cr | 54 ₹6.6 Cr | 34.5 ₹4.2 Cr | 41.5 ₹5.1 Cr | 52 ₹6.4 Cr |
| 3.00 | Earth work in cutting of internal section in canal, including all lift and lead. levelling, dressing with manual compaction i/c labour & machinery The earth from cutting to be used in side embankment or to be deposited as spoil bank as directed by Engineer- in-Charge. (from km 80.000 to km 160.000 of Agra canal in UP state) | 14,76,684.95 | Cum | 36 ₹5.3 Cr | 47 ₹6.9 Cr | 34.5 ₹5.1 Cr | 41 ₹6.1 Cr | 52 ₹7.7 Cr |
| 4.00 | Supplying filling 240 GSM woven fabric HDPE geo bags with local earth hand sewing with sujja & sutli and placing in position within 60m royalty etc. complete | 1,93,507 | Nos | 20 ₹38.7 L | 135 ₹2.6 Cr | 130 ₹2.5 Cr | 140 ₹2.7 Cr | 130 ₹2.5 Cr |
| 5.00 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches | 2,451.45 | cum | 50 ₹1.2 L | 65 ₹1.6 L | 70 ₹1.7 L | 90 ₹2.2 L | 90 ₹2.2 L |
| 6.00 | Providing and laying Cement concrete (1:3:6) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete. | 123.58 | cum | 6,000 ₹7.4 L | 4,800 ₹5.9 L | 4,000 ₹4.9 L | 5,200 ₹6.4 L | 5,200 ₹6.4 L |
| 7.00 | Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete. | 232.98 | cum | 6,200 ₹14.4 L | 5,637 ₹13.1 L | 4,700 ₹11.0 L | 6,000 ₹14.0 L | 5,800 ₹13.5 L |
| 8.00 | Providing and laying CC. (1:1.5:3) including cost of all material, labour and T&P etc.complete. | 22.21 | cum | 9,000 ₹2.0 L | 5,800 ₹1.3 L | 5,700 ₹1.3 L | 5,500 ₹1.2 L | 6,000 ₹1.3 L |
| 9.00 | Struck deep pointing in 1:2 on brick masonry ,cement , coarse sand including cost of all material, labour and T&P etc. complete. | 799.11 | sqm | 200 ₹1.6 L | 135 ₹1.1 L | 140 ₹1.1 L | 120 ₹95,893.20 | 140 ₹1.1 L |
| 10.00 | Supplying & Fixing 150 mm. inner dia NP-4 socket hume Pipe placing in position i/c all material, Labour, T&P etc. Complete. | 669.5 | RM | 1,000 ₹6.7 L | 800 ₹5.4 L | 6,000 ₹40.2 L | 8,500 ₹56.9 L | 900 ₹6.0 L |
Tender Value
₹25.6 Cr
EMD Value
₹51.2 L
Closing Date
29 Oct 2025, 1:00 pmClosed
Superintending Engineer
3rd Circle Irrigation Works 139 Mall Road Pratappura, Agra
Capacity restoration work from Km 36.000 to Km 160.000 of Agra Main Canal
2025_UPIDC_1084300_2
06/SE/2025-26
Open Tender
Civil Works
50 days
Haryana
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹51.2 L
Office of The SE 3rd Circle Irrigation Works, Agra
20 May 2026
21 Oct 2025
29 Oct 2025
21 Oct 2025
29 Oct 2025
21 Oct 2025
25 Oct 2025
Amount
Uprooting jhunds and moonj with disposal away from site. (from km 36.000 to 160.000 of main canal)
Earth work in cutting of internal section in canal, including all lift and lead. levelling, dressing with manual compaction i/c labour & machinery The earth from cutting to be used in side embankment or to be deposited as spoil bank as directed by Engineer- in-Charge. (from km 36.000 to km 80.000 of Agra canal in Haryana State)
Earth work in cutting of internal section in canal, including all lift and lead. levelling, dressing with manual compaction i/c labour & machinery The earth from cutting to be used in side embankment or to be deposited as spoil bank as directed by Engineer- in-Charge. (from km 80.000 to km 160.000 of Agra canal in UP state)
Supplying filling 240 GSM woven fabric HDPE geo bags with local earth hand sewing with sujja & sutli and placing in position within 60m royalty etc. complete
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches
Providing and laying Cement concrete (1:3:6) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete.
Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete.
Providing and laying CC. (1:1.5:3) including cost of all material, labour and T&P etc.complete.
Struck deep pointing in 1:2 on brick masonry ,cement , coarse sand including cost of all material, labour and T&P etc. complete.
Supplying & Fixing 150 mm. inner dia NP-4 socket hume Pipe placing in position i/c all material, Labour, T&P etc. Complete.
M/s Kaiser Construction Engineers and Contractor (BID ID -5636361)
GSB DEVELOPERS PRIVATE LIMITED (BID ID -5635549)
Durga Engineers and Earth Movers (BID ID -5636333)
ARVIND KUMAR SINGH (BID ID -5634776)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.95 MB
TenderDocumentLOT_2.pdf
Tender Documents • 2.44 MB
BOQ_1986878.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid