Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-Finance AT BRAHMANABASTA KAKHADI CUTTACK 75437 | 75437 | ₹1.5 Cr | L1 | Accepted-Finance SELECTED BY LOTTERY |
| 2 | L2₹1.5 CrSame as L1Accepted-Finance | ₹1.5 CrSame as L1 | L2 | Accepted-Finance SELECTED BY LOTTERY |
| 3 | Rejected-Technical AT MUKHURA PO GOBINDAPUR PS REMUNA DIST BALASORE 756019 | BALESHWAR | ODISHA | 756019 | - | - | Rejected-Technical EPF ESI NOT SUBMITTED |
| 4 | Rejected-Technical | - | - | Rejected-Technical EXPERIENCVE EPF NOT SUBMITTED |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
24 Jun 2026, 5:00 pmClosed
Chairman, RMC NILGIRI
RMC NILGIRI
Construction of Agricultural Marketing Infrastructure of Oupada Market Yard Talakia G.P. Hat Under RMC, Nilgiri. Dist-Balasore
2026_OSAMB_131680_1
03/RMC -NILGIRI/2025-26
Open Tender
Civil Works - Others
Percentage
RMC NILGIRI
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.5 L
Yes
17 Aug 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
24 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site within initial leads and lifts, including shoring, shuttering & dewatering (if required) with cost of labour,cess, hire & running charges of water pumps sundries , T & P & all other machinaries required for the work etc.complete in all respect as per latest specification & direction of the Engineer in charge. | 404.69 | Each Cum | 276.89 | ₹1,12,054.61 |
| 2 | SAND FILLING :-Filling in foundation, trenches and plinth with river sand, well watered and compacted in layers of 0.3 mtr, with top surface dressed and leveled to proper gradient including cost of all materials, conveyance, all taxes and royalties, loading and unloading, including cost of all labour, sundries ,T & P etc. All complete as per directions of the Engineer -in-charge. | 556.48 | Each Cum | 1,907.68 | ₹10,61,585.77 |
| 3 | Situ reinforced :-providing cast in situ reinforce cement concrete bored single under reamed pile of M-20 grade 300mm.dia bore with single under reamed of 2.5 times the bore dia design to carry the desing safe load using bentonite & casing & treaming of pile & driving the case up to required depth with supply of all labours tool & plants and all taxes and royalties, loading and unloading, including cost of all labour, sundries ,T & P etc. All complete as per directions of the Engineer -in-charge. | 816 | Each Rmt | 1,362.24 | ₹11,11,587.84 |
| 4 | Providing and laying of Cement Concrete of grade 1: 3 :6 (1cement : 3 sand : 6 graded stone aggregate of size 25mm to 40 mm hard granite crusher broken metal ) , mixing in concrete mixer ,lowering and compacting in proper thickness , watering & curing for the required period .including all cost of labour ,material, conveyance,royalties and taxes ,sundries ,T & P etc.complete as per the directions of Engineer-in-charge. | 113.63 | Each Qtl | 6,878.8 | ₹7,81,638.04 |
| 5 | Filling foundation and plinth with excavated materials well watered and rammed etc.complete as per direction of the Engineer-in-charge. | 100.78 | Each Cum | 120.24 | ₹12,117.79 |
| 6 | Providing RCC M-20 grade concrete using 20mm down graded CBHG chips including all cost of labour ,material, conveyance,royalties and taxes ,sundries ,T & P etc.complete as per the directions of Engineer-in-charge. | 19.2 | Each Cum | 7,279.18 | ₹1,39,760.26 |
| 7 | Providing,supplying and constructing in Foundation and plinth brick masonary in cement martar (1:6) with 1st quality approved fly ash bricks having minimum crushing strength 75 kg/sqcm including socking the bricks in water vat for 24 hours before use in all levels ranking out of the joints, including cost of all materials ,transportation,curing,loading,unloading,labour T & P taxes,duties,levies,royalities etc complete as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.(Foundation & plinth) | 173.27 | Each Cum | 6,013.38 | ₹10,41,938.35 |
| 8 | Providing,supplying and constructing in superstructure (up to 3mt height Ground floor) brick masonary in cement martar (1:6) with 1st quality approved fly ash bricks having minimum crushing strength 75 kg/sqcm including socking the bricks in water vat for 24 hours before use in all levels ranking out of the joints, including cost of all materials ,transportation,curing,loading,unloading,labour T & P taxes,duties,levies,royalities etc complete as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.(up to 3mt height Ground floor) | 236.11 | Each Cum | 6,046.71 | ₹14,27,688.7 |
| 9 | Providing,supplying and constructing in Foundation and plinth brick masonary in cement martar (1:4) with 1st quality approved fly ash bricks having minimum crushing strength 75 kg/sqcm including socking the bricks in water vat for 24 hours before use in all levels ranking out of the joints, including cost of all materials ,transportation,curing,loading,unloading,labour T & P taxes,duties,levies,royalities etc complete as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.(Foundation & plinth) | 1.73 | Each Cum | 6,274.01 | ₹10,854.04 |
| 10 | Providing,supplying and constructing in Above plinth brick masonary in cement martar (1:4) with 1st quality approved fly ash bricks having minimum crushing strength 75 kg/sqcm including socking the bricks in water vat for 24 hours before use in all levels ranking out of the joints, including cost of all materials ,transportation,curing,loading,unloading,labour T & P taxes,duties,levies,royalities etc complete as per the latest specification confirming to relevant IS Specification and direction of the Engineer-in-charge.(Above plinth) | 36.75 | Each Cum | 6,240.68 | ₹2,29,344.99 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
DTCN.pdf
Tender Documents • 1.39 MB
BOQ_595758.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .