Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-desired document not received |
Tender Value
₹36.8 L
EMD Value
₹73,520
Closing Date
31 May 2026, 6:00 pmClosed
XEN RMC DIV-II C.A.D. ANTA
XEN RMC DIV-II C.A.D. ANTA
Excavation, Desilting, Construction of VRB, Pipe Culvert and Gravel Roads in Drainage system in Ayana Distributary Section under Sub Division CAD Mangrol
2026_CADKO_561491_7
nit 04 of 2026-27 cad anta
Open Tender
Civil Works
Percentage
365 days
Ayana
Excavation, Desilting, Construction of VRB, Pipe Culvert and Gravel Roads in Drainage system in Ayana Distributary Section under Sub Division CAD Mangrol
2 documents required · 2 mandatory
₹1,000
XEN RMC DIV-II C.A.D. ANTA
₹73,520
Yes
1 Jun 2026
22 May 2026
1 Jun 2026
22 May 2026
31 May 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b)Thick | 20,000 | Sqm | 2.5 | ₹50,000 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect in. (b) Hard/dense soil. | 25,275.4 | Cum | 79 | ₹19,96,756.6 |
| 3 | Centring and shuttering for slabs, beams,lintels,columns,trough with or without caps and base including proping and remove. | 55.12 | sqm | 225 | ₹12,402 |
| 4 | Side shuttering including propping etc. complete (to achieve finish F 2 for :(c)Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 282.07 | sqm | 220 | ₹62,055.4 |
| 5 | Supplying of MS reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars(IS :1786-1985) | 2,718.55 | kg | 78 | ₹2,12,046.9 |
| 6 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 35.41 | Cum | 4,654 | ₹1,64,798.14 |
| 7 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 151.42 | Cum | 5,161 | ₹7,81,478.62 |
| 8 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 420 kg/ cum of concrete) 20 mm | 35.11 | Cum | 5,975 | ₹2,09,782.25 |
| 9 | Extra labour charges for obstruction in laying & placing the reinforced cement concrete due to reinforcement in Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas,
Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc | 35.11 | Cum | 200 | ₹7,022 |
| 10 | Providing laying & fixing in position RCC spun or hume pipe (IS 458-2003) with collars in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar (1:3) perfectly air tight including testing of joints class NP-3( INCLUDING LABOUR CHARGE), (e) 600 mm | 10 | RM | 3,329 | ₹33,290 |
stage.html
html • 0.03 MB
finance_999343.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
Tendernotice_2.pdf
PDF • 0.49 MB
BOQ_999343.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .