Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹7.5 L+₹36,072 (5.08%)Rejected-Finance | L2 | Rejected-Finance High Rates | |
| 3 | L3₹8.3 L+₹1.2 L (16.9%)Rejected-Finance | L3 | Rejected-Finance High Rates |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
24 Feb 2021, 6:00 pmClosed
GE (MCTE) MHOW
GE (MCTE) MHOW MP 453441
MANNING AND OPERATION OF LIFTS UNDER GE (MCTE) MHOW
2021_MES_416736_1
GE(MCTE)/MHOW/34(T) OF 2021
Open Tender
Electrical and Maintenance Works
Works
334 days
GE (MCTE) MHOW
AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹500
Yes
GE (MCTE) MHOW
₹16,000
Yes
8 Mar 2021
28 Jan 2021
26 Feb 2021
28 Jan 2021
24 Feb 2021
11 Feb 2021
Amount
Operation of multiple 8 passenger lifts installed at 110 single officers accn at MCTE Mhow in 03 shifts (each of 08 hrs) (1st Shift 0600 hrs to 1400 hrs, 2nd Shift 1400 hrs to 2200 hrs and 3rd Shift 2200 hrs to 0600 hrs) per day by deputing one lift operator per shift (Total No of Lift operator= 03 Nos) including maintenance and cleaning in lifts as required, taking care of lifts from pilferage, theft, damage and reporting immediately breakdown of lifts to the Engineer-in-Charge complete all as specified and directed.
Note (applicable to Srl item No 1.00 above) (i) The contractor shall pay to his lift operators in their Bank Account and statement of Bank Accounts shall be verified by Engr-in-charge and countersigned by GE while claiming interim payment. (ii) The rates quoted shall be deemed to be inclusive of minimum wages, all taxes (including GST, GST on works contracts, labour welfare cess/tax etc), EPF for personals employed and also any other levies payable under the respective statutes. The contractor shall be required to submit the documentary proof of Employees Provident Fund (EPF) details for the personals employed. (iii) The operator shall be ITI holder with minimum 2 years experience in the trade. (iv) The contractor have to provide proper dress and shoe to the operator without any extra cost to the department. (v) The contractor will hand over lift to the department in good working condition on expiry of contract period. (vi) One Lift operator in each shift will look after maximum 02 Nos of Lift. (vii) If the quoted amount is less than the estimated cost for the above outsourcing work ie 8.31 Lakhs, then the lowest bidder will have to deposited FDR/BGB in favour of Accepting officer within 10 days of opening of Financial bid for the difference in estimated cost ie 8.31 Lakhs & quoted amount. In case the said FDR/BGB is not submitted within stipulated period as mentioned above said amount shall be deducted from 1st RAR and contractor shall be banned for 06 months for issued of tender under office of the GE (MCTE). Above deposited FDR/BGB shall be released only after satisfactory complition of work.
ENVIRO TECH SERVICES
Sameer Auto Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .