Tender Value
₹1.4 Cr
EMD Value
₹2.2 L
Closing Date
21 Jan 2026, 2:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
ELEC. TRD
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments'' in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a) The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Defination of Similar Work :- Any Over Head Equipment (OHE) /Power Supply Installation (PSI) /Auxiliary Transformer (AT) work on 25 KV AC Railway Traction for new line electrification or addition and alteration involving Supply, Erection, Testing and Commissioning of any Railway System in India carried out on Zonal Railways/Construction/RE/RVNL Works or Public listed Company subject to conditions in the GCC with regard to public listed companies vide para 10.1 of GCC April 2022.
22 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up to date for the present contract
I/We have read the various conditions to tender attached hereto and agree to abide by the said conditions
I/We also agree to keep this tender open for acceptance for a period of 45 days from the date fixed for opening the same
I/We offer to do the work for Sr.Divisional Electrical Engineer, TRD, Salem Division, Salem, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of commencement of work of the tender. The amount as stipulated in the tender document is herewith forwarded as Earnest Money. Full value of the earnest Money shall stand forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if :(a) I/We do not execute the contract documents as stipulated in performance guarantee clause of GCC 2022 as detailed in general instructions.(b) I/We do not commence the work within seven days after receipt of LOA/orders to that effect.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
All the tenderers/Contractors have to deposit full earnest money and tender document cost as stipulated for the tender, through online modes as permitted in IREPS application through multiple banks net banking, debit and credit cards only. On failing which offer will be summarily rejected.
The Tenderer should submit a copy of GST/PAN and NEFT Form.
Payment of EMD and Tender form cost should be made on line only.
GCC 2022- All GCC clauses (updated including with all correction slips on date) are applicable.
Modification to OHE in connection with Pilamedu - Augmentation of Goods shed lines (Rd.6 & 7) to full length with CC unloading pavement between Rd.6 & 7 for about 300m
SA-TRD-2025-26-154~SR
SA-TRD-2025-26-154
Open
Works - General
6 Months
Salem, Tamil Nadu
₹0
₹2.2 L
21 Jan 2026
23 Dec 2025
7 Jan 2026
99 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,35,44,575 | ||
| — | 3.00 | — | — | ||
| Preparation of designs and drawings | — | — | — | 66,000 | |
| — | 25.00 | — | — | ||
| For Foundation and Plinth - Concrete in hard soil | — | — | — | 3,12,500 | |
| — | 25.00 | — | — | ||
| Concrete in rocky soil | — | — | — | 3,37,500 | |
| — | 160.00 | — | — | ||
| Concrete in other than hard soil and rock | — | — | — | 18,00,000 | |
| — | 10.00 | — | — | ||
| Erection of traction masts - by manual | — | — | — | 97,800 | |
| — | 10.00 | — | — | ||
| Supply only for fabricated mast K,B,S, series etc. | — | — | — | 13,50,000 | |
| — | 25.00 | — | — | ||
| Erection of fabricated steel work other than masts by manual | — | — | — | 6,12,500 | |
| — | 25.00 | — | — | ||
| Supply of fabricated steel work other than masts by manual | — | — | — | 33,75,000 | |
| — | 6.00 | — | — | ||
| Erection of fabricated steel work(SPS). | — | — | — | 74,400 | |
| — | 6.00 | — | — | ||
| Supply of fabricated steel work(SPS). | — | — | — | 8,10,000 | |
| — | 14.00 | — | — | ||
| Erection of a Guy rod assembly | — | — | — | 33,600 | |
| — | 14.00 | — | — | ||
| Supply of a Guy rod assembly | — | — | — | 2,22,600 | |
| — | 40.00 | — | — | ||
| Erection of a single bracket assembly for Tramway type | — | — | — | 1,18,000 | |
| — | 40.00 | — | — | ||
| Supply of a single bracket assembly for Tramway type | — | — | — | 11,20,000 | |
| — | 15.00 | — | — | ||
| Erection of a single Bracket Assembly | — | — | — | 51,750 | |
| — | 15.00 | — | — | ||
| Supply of a single Bracket Assembly | — | — | — | 5,17,500 | |
| — | 3.00 | — | — | ||
| Erection of Contact Wire only (Regulating with catenary wire) by manual for Tramway type | — | — | — | 1,45,500 | |
| — | 7.00 | — | — | ||
| Erection of regulating equipment ( Mod. 3 pulley type ) with counter weight assembly for Tramway Type OHE by manual | — | — | — | 37,100 | |
| — | 7.00 | — | — | ||
| Supply of regulating equipment ( Mod. 3 pulley type ) with counter weight assembly for Tramway Type OHE by manual | — | — | — | 6,30,000 | |
| — | 14.00 | — | — | ||
| Erection of material for termination arrangements for Single conductor | — | — | — | 17,360 | |
| — | 14.00 | — | — | ||
| Supply of material for termination arrangements for Single conductor | — | — | — | 1,21,800 | |
| — | 1.00 | — | — | ||
| Erection of material for termination arrangements for Double Conductor | — | — | — | 1,240 | |
| — | 1.00 | — | — | ||
| Supply of material for termination arrangements for Double conductor | — | — | — | 14,500 | |
| — | 30.00 | — | — | ||
| Erection of 9 tonne cut insulator | — | — | — | 37,200 | |
| — | 30.00 | — | — | ||
| Supply of 9 tonne cut insulator | — | — | — | 1,86,000 | |
| — | 10.00 | — | — | ||
| Erection of 25KV post insulator | — | — | — | 7,300 | |
| — | 10.00 | — | — | ||
| Erection of 25KV post insulator | — | — | — | 62,000 | |
| — | 4.00 | — | — | ||
| Erection of Section Insulator for Tramway Type OHE (Regulated) | — | — | — | 11,800 | |
| — | 4.00 | — | — | ||
| Supply of Section Insulator for Tramway Type OHE (Regulated) | — | — | — | 1,68,000 | |
| — | 2.00 | — | — | ||
| Erection of 25KV, 1250Amps single pole isolator as per RDSO specification no.ETI/OHE/16(1/94) with operating handle assembly | — | — | — | 14,800 | |
| — | 2.00 | — | — | ||
| Supply of 25KV, 1250 Amps single pole isolator as per RDSO specification no. ETI/OHE/16(1/94) with operating handle assembly | — | — | — | 1,25,000 | |
| — | 10.00 | — | — | ||
| Erection of Copper Jumper | — | — | — | 8,500 | |
| — | 10.00 | — | — | ||
| Supply of Copper Jumper | — | — | — | 85,000 | |
| — | 50.00 | — | — | ||
| Erection of a structure bond | — | — | — | 37,000 | |
| — | 50.00 | — | — | ||
| Supply of a structure bond | — | — | — | 60,000 | |
| — | 20.00 | — | — | ||
| Erection of longitudinal bond | — | — | — | 14,800 | |
| — | 20.00 | — | — | ||
| Supply of longitudinal bond | — | — | — | 24,000 | |
| — | 20.00 | — | — | ||
| Erection of transverse and special bond | — | — | — | 14,800 | |
| — | 20.00 | — | — | ||
| Erection of transverse and special bond. | — | — | — | 24,000 | |
| — | 55.00 | — | — | ||
| Transfer of OHE | — | — | — | 1,34,750 | |
| Each | 20.00 | Span | — | ||
| Slewing of Equipment | — | — | — | 70,000 | |
| — | 1.50 | — | — | ||
| Dismantling of over head equipment | — | — | — | 46,500 | |
| — | 8.00 | — | — | ||
| Erection part of Splicing and extension of an anchored over head equipment | — | — | — | 59,600 | |
| — | 8.00 | — | — | ||
| Supply part of Splicing and extension of an anchored over head equipment | — | — | — | 19,600 | |
| — | 2.00 | — | — | ||
| Dismantling of an isolator | — | — | — | 3,700 | |
| — | 20.00 | — | — | ||
| Dismantling of a pedestal /pin insulators | — | — | — | 29,000 | |
| — | 34.00 | — | — | ||
| Dismantling of OHE mast /structure by cutting | — | — | — | 2,53,300 | |
| — | 5.00 | — | — | ||
| Dismantling of Guy Rod | — | — | — | 4,875 | |
| — | 12.00 | — | — | ||
| Releasing of portal boom under power/non power block | — | — | — | 1,76,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .