Tender Value
₹89.0 L
EMD Value
₹2.1 L
Closing Date
5 Aug 2026, 5:00 pm7d left
GM-(CIVIL)
Main Administrative Building Sector-6 Noida
D/o Sector-94 and 94A (C/o Cremation Platform, Shed and renovate of wooden storage hall and other maintenance work in Antim Niwas Sector-94A) Noida
2026_NOIDA_1171543_1
60/GM(C)/SM-WC-09/ET/2026-27
Open Tender
Civil Works
Fixed-rate
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹2.1 L
22 Jul 2026
22 Jul 2026
6 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. The contractor has to detect diffrent utilities like sewar line ,Water supply line ,Electric cable,Telephone cable, Gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of engineer in charge All kinds of soil. | 97 | cum | 144.95 | ₹14,060.15 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (Zone-III) drived from natural sources : 8 graded stone aggregate 40 mm nominal size drived from natural sources). | 53 | cum | 5,746.88 | ₹3,04,584.64 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 41 | cum | 779.76 | ₹31,970.16 |
| 4 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 4 | cum | 1,347.16 | ₹5,388.64 |
| 5 | Brick work with Common Brunt clay F.P.S( Non-modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement :4 coarse sand) | 39 | cum | 5,214.8 | ₹2,03,377.2 |
| 6 | Brick work with F.P.S. bricks of class designation 150 in superstructure above plinth level up to floor V level in all shapes and sizes inCement mortar 1:4 (1 cement :4 coarse sand) | 107 | cum | 6,276.98 | ₹6,71,636.86 |
| 7 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works upto plinth level | 13 | cum | 7,912.32 | ₹1,02,860.16 |
| 8 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330kg/cum.Excess/less cement used as per design mix is payable/recoverable separately). All works above plinth level upto floor V level | 12 | cum | 8,654.75 | ₹1,03,857 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,525 | kg | 82.81 | ₹2,09,095.25 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete. | 75 | sqm | 181.64 | ₹13,623 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_2199421.xls
BOQ • 0.29 MB
Capability.xls
Additional Documents • 0.05 MB
TD.pdf
Tender Documents • 5.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].