Tender Value
₹63.6 L
EMD Value
₹1.3 L
Closing Date
26 Aug 2026, 2:00 pm2d left
Superintending Engineer,PWD, Dibrugarh Road Circle
O/O Superintending Engineer, PWD, Dibrugarh Road Circle, Dibrugarh
Construction of Office Building for the Office of the Executive Engineer, PWRD, Duliajan and Naharkatia Territorial Road Division, Naharkatia
2026_PWD_53421_1
DRC.XIII/16/98/NIT/DIB/Pt-I/
Open Tender
Civil Works - Building
Item Rate
365 days
Naharkatia
Please refer tender document
4 documents required · 4 mandatory
₹1,800
₹1.3 L
Yes
11 Aug 2026
11 Aug 2026
26 Aug 2026
11 Aug 2026
26 Aug 2026
11 Aug 2026
11 Aug 2026 - 26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 48.38 | cum | 364.31 | ₹17,626.78 |
| 2 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 1 | Sqmt. | 931.29 | ₹930.36 |
| 3 | PCC 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.02 | cum | 8,678.37 | ₹26,208.68 |
| 4 | Steel reinforcement Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. | 5,103.6 | Kg | 113.86 | ₹5,81,095.9 |
| 5 | FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for
5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 185.67 | Sqm | 772.6 | ₹1,43,448.64 |
| 6 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 134.4 | sqm | 1,021.4 | ₹1,37,276.16 |
| 7 | RCC WORK Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 32.2 | Cum | 10,622.53 | ₹3,42,045.47 |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.29 | Cum | 12,935.01 | ₹1,33,101.25 |
| 9 | Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in:
6.2.1 Cement mortar 1:4 (1 cement : 4 coarse sand) | 29.21 | Cum | 7,298.44 | ₹2,13,187.43 |
| 10 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
6.13.1Cement mortar 1:3 (1 cement :3 coarse sand) | 549.36 | Sqm | 1,324.74 | ₹7,27,759.17 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
SBD.pdf
Tender Documents • 6.41 MB
BOQ_84104.xls
BOQ • 0.46 MB
FOB.pdf
Additional Documents • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].