| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC | ₹26.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹27.3 L+₹1.3 L (5.02%)Rejected-Finance | ₹27.3 L+₹1.3 L (5.02%) | L2 | Rejected-Finance Due to highest amount quoted bidder rejected |
| Sl No | Description | Qty | Unit | K.P. INFRASTRUCTURE AND DEVELOPERS L1 | RAI BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundations of bridges culverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around:- For ordinary gravel soil involving pick work | 395.71 | cum | 205 ₹81,121 Lowest | 250 ₹98,928 |
| 2.00 | Loading Unloading Carriege And Laying of Dry Brick Bats | 32.98 | cum | 504 ₹16,622 | 500 ₹16,490 Lowest |
| 3.00 | Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 32.98 | cum | 3,800 ₹1,25,324 Lowest | 4,000 ₹1,31,920 |
| 4.00 | Cement concrete 1:2:4 mixing by me mechanical means using
concrete
mixer volumetric type | 17.99 | cum | 5,200 ₹93,548 | 5,000 ₹89,950 Lowest |
| 5.00 | Brick Work laid in cement sand mortar 1:6 in foundation and plinth | 269.8 | cum | 3,200 ₹8,63,360 | 2,150 ₹5,80,070 Lowest |
| 6.00 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 159.88 | sq.mtr | 200 ₹31,976 Lowest | 200 ₹31,976 Lowest |
| 7.00 | STEEL AND IRON WORK Cold twisted deformed (Ribbed/ Tor steel) Bars (Fe 415 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding & bending and placing in position complete deformed (Ribbed/ Tor steel) Bars (Fe 415 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding & bending and placing in position complete | 25.1 | qtl | 7,150 ₹1,79,465 Lowest | 7,500 ₹1,88,250 |
| 8.00 | LOADING AND UNLOADING Bricks 22.86 cm. size | 1,64,040 | nos | 2.84 ₹4,65,874 | 0.2 ₹32,808 Lowest |
| 9.00 | Dismentaling of brick work in cement | 824.02 | cum | 210 ₹1,73,044 Lowest | 750 ₹6,18,015 |
| 10.00 | Dismentaling of brick work tile in mud | 1,185.92 | sqm | 42 ₹49,809 Lowest | 250 ₹2,96,480 |
Tender Value
Refer Docs
EMD Value
₹55,619
Closing Date
2 Jan 2026, 11:00 amClosed
Executive Engineer
Executive Engineer Building Maintenance and Plantation Division Shahpurkandi Township
Estimate for foundation of Boundary wall nearTrehti Village and Surrounding areas at RSD Spk Township for proection of proposed Solar System
2025_WR_156279_1
22/2025
Open Tender
Civil Works
Item Rate
120 days
Shahpurkandi
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹55,619
4 May 2026
22 Dec 2025
2 Jan 2026
22 Dec 2025
2 Jan 2026
22 Dec 2025
Earth work in excavation of foundations of bridges culverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around:- For ordinary gravel soil involving pick work
Loading Unloading Carriege And Laying of Dry Brick Bats
Cement concrete 1:3:6 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type
Cement concrete 1:2:4 mixing by me mechanical means using concrete mixer volumetric type
Brick Work laid in cement sand mortar 1:6 in foundation and plinth
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
STEEL AND IRON WORK Cold twisted deformed (Ribbed/ Tor steel) Bars (Fe 415 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding & bending and placing in position complete deformed (Ribbed/ Tor steel) Bars (Fe 415 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including binding & bending and placing in position complete
LOADING AND UNLOADING Bricks 22.86 cm. size
Dismentaling of brick work in cement
Dismentaling of brick work tile in mud
Dismantling of pre-stressed / RCC including T&P scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material. & staking the serviceable material with allifts & lead of 100 mtr (By Mechanical Means)
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.
Brick Work First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth AOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_316947.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .