Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.8 LAccepted-AOC D 3 53 VASHISHT PARK PANKHA ROAD NEW DELHI 110046 | NEW DELHI | DELHI | 110046 | ₹22.8 L Quoted ₹23.7 L | L1 | Accepted-AOC Being Lowest |
| 2 | L2₹26.3 LRejected-Finance | ₹26.3 L | L2 | Rejected-Finance Being other than lowest |
| 3 | L3₹28.1 LRejected-Finance N A | NA | NA | 121004 | ₹28.1 L | L3 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | Vipul Construction L3 | M/S SIMRAN CONSTRUCTION CO L1 | MS BUILDTECH L2 |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of surface with Washing, rubbing down and stopping of distempered and painted surface with sand paper / Putty in accordance to standard Engineering practices to make the surface free from dust, loose paint etc. Complete all as specified and as directed by Engr- In - Charge. | 23,000 | Sqm | 2 ₹46,000 | 2 ₹46,000 | 2 ₹46,000 |
| 2.00 | M&L for applying of 1 mm thick wall care putty over prepared surfaces of walls / ceiling including sanding of putty surface properly with ragemarg to make the surface free from dust or loose particles. Complete all as specified and as directed by Engr- In - Charge. | 23,000 | Sqm | 5 ₹1,15,000 | 3 ₹69,000 | 5 ₹1,15,000 |
| 3.00 | Providing and applying two coats of smooth acrylic emulsion with rich matt finish having VOC less than 50 grams per ltr complying leed criteria @ 1 ltrs (undiluted)/10 sq mtrs diluted with water in 2:1 ratio applied over and including priming coat with Roller finish and allow 6- 8 hrs to dry the surface for second coats of paint complete all as specified and as directed. | 23,000 | Sqm | 28 ₹6,44,000 | 29 ₹6,67,000 | 28 ₹6,44,000 |
| 4.00 | Preparation of old painted surfaces of wood work of any description over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | 2,000 | Sqm | 18 ₹36,000 | 20 ₹40,000 | 26 ₹52,000 |
| 5.00 | Description all as per item No. 4.00 above but on steel surfaces complete all as specified and directed. | 900 | Sqm | 18 ₹16,200 | 20 ₹18,000 | 24 ₹21,600 |
| 6.00 | Description all as per item No. 4.00 above but two coats complete. (wooden surface) | 55 | Sqm | 28 ₹1,540 | 25 ₹1,375 | 24 ₹1,320 |
| 7.00 | Description all as per item No. 5.00 above but two coats complete. (steel surface) | 90 | Sqm | 28 ₹2,520 | 25 ₹2,250 | 24 ₹2,160 |
| 8.00 | M&L for preparation of plastered or unplastered surfaces of wall and applying one coat of oil bound distember complete all as specified and directed. | 1,200 | Sqm | 9 ₹10,800 | 6 ₹7,200 | 20 ₹24,000 |
| 9.00 | Description all as per item No 8.00 above but two coat complete. | 250 | Sqm | 16 ₹4,000 | 17 ₹4,250 | 25 ₹6,250 |
| 10.00 | M&L for preparation of plastered or unplastered surfaces of Ceiling and applying one coat of oil bound distember complete all as specified and directed. | 250 | Sqm | 9 ₹2,250 | 7 ₹1,750 | 32 ₹8,000 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
2 May 2026, 6:00 pmClosed
GE (EAST) DELHI CANTT-10
GE (EAST) DELHI CANTT-10
REPAIR TO PLUMBING, JOINERY, SANITARY BATH FITTINGS, FLOORING PLASTERING AND OTHER SIMILAR WORK IN ASC MESS, TOI, POLO ROAD MD ACCN AND OTM ACCN UNDER AGE B/R-II UNDER GE (EAST) DELHI CANTT-10
2026_MES_759198_1
GE/DE-200/2025-26
Open Tender
Civil Works
180 days
GE (EAST) DELHI CANTT-10
As per NIT Documents
9 documents required · 9 mandatory
₹500
GE (EAST) DELHI CANTT-10
₹96,000
Yes
1 Jul 2026
4 Apr 2026
4 May 2026
4 Apr 2026
2 May 2026
18 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Preparation of surface with Washing, rubbing down and stopping of distempered and painted surface with sand paper / Putty in accordance to standard Engineering practices to make the surface free from dust, loose paint etc. Complete all as specified and as directed by Engr- In - Charge. | - | Sqm | - | - |
| - | M&L for applying of 1 mm thick wall care putty over prepared surfaces of walls / ceiling including sanding of putty surface properly with ragemarg to make the surface free from dust or loose particles. Complete all as specified and as directed by Engr- In - Charge. | - | Sqm | - | - |
| - | Providing and applying two coats of smooth acrylic emulsion with rich matt finish having VOC less than 50 grams per ltr complying leed criteria @ 1 ltrs (undiluted)/10 sq mtrs diluted with water in 2:1 ratio applied over and including priming coat with Roller finish and allow 6- 8 hrs to dry the surface for second coats of paint complete all as specified and as directed. | - | Sqm | - | - |
| - | Preparation of old painted surfaces of wood work of any description over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed. | - | Sqm | - | - |
| - | Description all as per item No. 4.00 above but on steel surfaces complete all as specified and directed. | - | Sqm | - | - |
| - | Description all as per item No. 4.00 above but two coats complete. (wooden surface) | - | Sqm | - | - |
| - | Description all as per item No. 5.00 above but two coats complete. (steel surface) | - | Sqm | - | - |
| - | M&L for preparation of plastered or unplastered surfaces of wall and applying one coat of oil bound distember complete all as specified and directed. | - | Sqm | - | - |
| - | Description all as per item No 8.00 above but two coat complete. | - | Sqm | - | - |
| - | M&L for preparation of plastered or unplastered surfaces of Ceiling and applying one coat of oil bound distember complete all as specified and directed. | - | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tender200.pdf
Tender Documents • 1.18 MB
BOQ_850366.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid