| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98.7 LAdmitted-Finance THIKSAY | L1 | Admitted-Finance | |
| 2 | L2₹1.0 Cr+₹2.8 L (2.88%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.1 Cr+₹7.4 L (7.48%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.2 Cr+₹17.6 L (17.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹1.2 Cr+₹17.9 L (18.1%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S ISHEY TASHI L5 | Asgar Ali L3 | M/S TASHI PUNCHOK GOVT CONTRACTOR L2 | M/S TSEWANG DORJAY L7 | M/S TASHI DORJAI L4 | M/S TSERING STANZIN GOVT CONTRACTOR L6 | M/S TASHI TUNDUP GOVT CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 297 | Cum | 120 ₹35,640 | 250 ₹74,250 | 120 ₹35,640 | 150 ₹44,550 | 130 ₹38,610 | 100 ₹29,700 Lowest | 190 ₹56,430 |
| 2.00 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 198 | Cum | 5,000 ₹9,90,000 | 5,000 ₹9,90,000 | 5,000 ₹9,90,000 | 4,000 ₹7,92,000 Lowest | 5,000 ₹9,90,000 | 4,600 ₹9,10,800 | 5,000 ₹9,90,000 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 148.5 | Cum | 5,500 ₹8,16,750 Lowest | 6,000 ₹8,91,000 | 6,000 ₹8,91,000 | 5,500 ₹8,16,750 Lowest | 6,500 ₹9,65,250 | 5,800 ₹8,61,300 | 6,300 ₹9,35,550 |
| 4.00 | Dumping stone in horizontal on level including cost of stone | 148.5 | Cum | 600 ₹89,100 | 550 ₹81,675 | 500 ₹74,250 | 200 ₹29,700 Lowest | 600 ₹89,100 | 300 ₹44,550 | 480 ₹71,280 |
| 5.00 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. Welded | 72,624.16 | Kgs | 130 ₹94,41,140.8 | 115 ₹83,51,778.4 | 110 ₹79,88,657.6 | 140 ₹1,01,67,382.4 | 130 ₹94,41,140.8 | 135 ₹98,04,261.6 | 105 ₹76,25,536.8 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form work for: a)Foundations, footings, bases for columns etc for mass concrete. | 21.46 | Sqm | 600 ₹12,876 | 350 ₹7,511 | 300 ₹6,438 | 250 ₹5,365 | 200 ₹4,292 | 100 ₹2,146 Lowest | 390 ₹8,369.4 |
| 7.00 | Carriage of material from source to site of work by MT including loadingm, unloading and stacking etc
a) Cement and steel an avg.lead 20 km | 66.33 | MT | 600 ₹39,798 | 400 ₹26,532 | 350 ₹23,215.5 | 100 ₹6,633 Lowest | 200 ₹13,266 | 200 ₹13,266 | 450 ₹29,848.5 |
| 8.00 | b)Sand an avg lead 10 km | 159.89 | Cum | 500 ₹79,945 | 400 ₹63,956 | 300 ₹47,967 | 100 ₹15,989 Lowest | 200 ₹31,978 | 200 ₹31,978 | 290 ₹46,368.1 |
| 9.00 | c) Stone and Agg an avg lead 12 km | 302.45 | Cum | 500 ₹1,51,225 | 400 ₹1,20,980 | 320 ₹96,784 | 100 ₹30,245 Lowest | 200 ₹60,490 | 200 ₹60,490 | 350 ₹1,05,857.5 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
15 Jun 2022, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Construction of Spectator steel stands including bed platform for construction/ Up gradation of Horse polo stadium at Shagaram Chuchot
2022_PWD_6524_1
22 of CDL leh of 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Executive Engineer Construction Division Leh
₹2.6 L
18 Jun 2022
25 May 2022
17 Jun 2022
25 May 2022
15 Jun 2022
25 May 2022
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dumping stone in horizontal on level including cost of stone
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat ofapproved steel primer all complete. Welded
Centering and shuttering including strutting, propping etc. and removal of form work for: a)Foundations, footings, bases for columns etc for mass concrete.
Carriage of material from source to site of work by MT including loadingm, unloading and stacking etc a) Cement and steel an avg.lead 20 km
b)Sand an avg lead 10 km
c) Stone and Agg an avg lead 12 km
M/S TASHI PUNCHOK GOVT CONTRACTOR
Asgar Ali
M/S TASHI DORJAI
M/S ISHEY TASHI
M/S TSERING STANZIN GOVT CONTRACTOR
M/S TSEWANG DORJAY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_15819.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .