Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
20 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RMC
RMC
Construction of RCC Drain and Bituminous Road from Iqra Masjid to Sarfaraj Chowk under Ward No-23
2026_UDD_120761_1
353/eng 2026
Open Tender
Civil Works
Works
180 days
AS PER NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹3.5 L
21 Nov 2026
5 Nov 2026
21 Nov 2026
5 Nov 2026
20 Nov 2026
5 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Earth work in Excavation in foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth as obtained to a distance up to 50 mm including all lifts, leveling, ramming the foundation trenches removing roots of trees, all complete as per approved design , building as per specification & direction of E/I.
Extra for earth work in hard soil as per specification and direction of E/I. | 214.1 | m3 | 852.92 | ₹1,82,610.17 |
| 2 | Dismantling R.C.C work including stacking serviceable materialsin countable stacks within 15m lead and disposal of unserviceable materials with all lead, all complete as per direction of E/I. | 91.76 | m3 | 3,139.24 | ₹2,88,056.66 |
| 3 | Dismantling of P.C.C work including …..do…. | 6.11 | m3 | 1,505.4 | ₹9,197.99 |
| 4 | Earth work in Excavation in foundation trenches in ordinary soil (vide classification of soil item A ) and disposal of excavated earth as obtained to a distance up to 50 mm including all lifts, leveling, ramming the foundation trenches removing roots of trees, all complete as per approved design , building as per specification & direction of E/I.
Extra for earth work in hard soil as per specification and direction of E/I. | 214.06 | m3 | 239.02 | ₹51,164.22 |
| 5 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification & direction of E/I.( Mode of measurement compacted volume). | 39.33 | m3 | 697.24 | ₹27,422.45 |
| 6 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of Boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 66.07 | m3 | 2,529.56 | ₹1,67,128.03 |
| 7 | Reinforced cement concrete work in walls (any Thickness), including attached pilasters, buttresses, abutments, posts and structs etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20mm nominal size) | 401.45 | m3 | 8,140.27 | ₹32,67,911.39 |
| 8 | Reinforced cement concrete work in beams, suspended floors, foors having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staicases and spiral stair cases above plinth level up to floor five lvevel, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (Zone-III) : 3 graded stone aggregate 20mm nominal size). | 84.66 | m3 | 8,546.89 | ₹7,23,579.71 |
| 9 | Providing Tor steel reinforcement of 8mm & 10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending, and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
8mm Dia. | 17.38 | M.T. | 83,896.48 | ₹14,58,120.82 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
Tendernotice_2.pdf
PDF • 1.73 MB
BOQ_163389.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .