| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 LAccepted-AOC | ₹6.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.7 LSame as L1Rejected-AOC NILGIRI NAC | ₹6.7 LSame as L1 | L2 | Rejected-AOC L2 |
| 3 | L3₹6.7 LSame as L1Rejected-AOC NILGIRI NAC WARD NO 10 | ₹6.7 LSame as L1 | L3 | Rejected-AOC L3 |
| 4 | L4₹6.7 LSame as L1Rejected-AOC | ₹6.7 LSame as L1 | L4 | Rejected-AOC L4 |
| 5 | L5₹6.7 LSame as L1Rejected-AOC AT BISOL PO BISOI PS BISOI DIST MAYURBHANJ | BALESHWAR | ODISHA | 756028 | ₹6.7 LSame as L1 | L5 | Rejected-AOC L5 |
Tender Value
₹6.7 L
EMD Value
₹6,720
Closing Date
22 Jul 2026, 5:00 pmClosed
Executive Officer, Nilgiri NAC
Nilagiri NAC, Nilagiri
Construction of Shed at K.C High School Mid-Day meal place under Nilagiri NAC.
2026_ORULB_135365_9
NLGN _3/2026-27
Open Tender
Civil Works - Roads
Percentage
Nilgiri NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹6,720
Yes
21 Aug 2026
11 Jul 2026
23 Jul 2026
11 Jul 2026
22 Jul 2026
11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in all kinds of soil with initial lead and lift and to required depth including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the Engineer-in-charge | - | cum | 282.89 | - |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc.complete as per direction of the Engineer-in-charge. | - | cum | 712.4 | - |
| 3 | C.C.(1:3:6) with 40mm CBHG metal including cost,Conveyance & Royalty of Materials (Unit-1 cum) | - | cum | 6,432.2 | - |
| 4 | RCC work of M-20 grade with 20mm and down graded CBHG chips incl. hoisting and laying incl cost, Conveyance & Royalty of Materials (Unit-1 cum) | - | cum | 6,580.1 | - |
| 5 | Supplying ,fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification.( Unit-1 Qtl) | 1 | qntl | 9,507.9 | ₹9,498.39 |
| 6 | Rigid and smooth centring,shuttering for CC works including false work and dismantling them after casting including cost of materials complete. | - | sqm | 249.7 | - |
| 7 | Iron works arought and put up at trusess, purlin and all cost M.S. Pipe 4", 3" Square bar etc. all complete | 1 | kg | 100.68 | ₹100.58 |
| 8 | Fabrication for Iron works (Labour Only) Qnty. Same as Item no.-07 | - | qntl | 355.25 | - |
| 9 | PVC plastic Pipes Schedule -40,80 & 120 as per ASTM -D-1785/2004.(50mm Dia) | - | Rm | 264.52 | - |
| 10 | Supplying , fitting & fixing G.C.I. Sheet in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. excluding cost of fitting (Unit-1 sqm) etc. all complete. | 1 | sqm | 555.1 | ₹554.54 |
stage.html
html • 0.09 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_600983.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.24 MB
BOQ_600983.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .