Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 CrAccepted-AOC 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹10.3 Cr Quoted ₹11.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹11.8 CrRejected-Finance HAJI CHAURAHA SHAMA VIHAR COLONY CHILLAWAN KANPUR ROAD SAROJINI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | ₹11.8 Cr | L2 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 3 | L3₹12.5 CrRejected-Finance | ₹12.5 Cr | L3 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 4 | L4₹12.6 CrRejected-Finance VILL SIDHIYAWA JAGDISHPUR AMETHI UP 227817 | JAGDISHPUR | AMETHI | UTTAR PRADESH | 227817 | ₹12.6 Cr | L4 | Rejected-Finance REJECTED BEING HIGHER RATE |
| 5 | L5₹13.6 CrRejected-Finance | ₹13.6 Cr | L5 | Rejected-Finance REJECTED BEING HIGHER RATE |
Tender Value
₹16 Cr
EMD Value
₹30 L
Closing Date
18 Jan 2024, 12:00 pmClosed
SE Lucknow Circle PWD. Lucknow
SE Lucknow Circle PWD. Lucknow
Widening and Strengthening of Gadhi hardaspur sarawan Gangaganj Ajmatullaganj Achaleshwar Road. Length 10.400 Km
2024_CEUCZ_878265_1
8891/401C-LKOCIR/2023-24 DATED 27.12.2024
Open Tender
Civil Works
360 days
Raebareli
Widening and Strengthening of Gadhi hardaspur sarawan Gangaganj Ajmatullaganj Achaleshwar Road. Length 10.400 Km
2 documents required · 2 mandatory
₹2,360
₹30 L
Yes
SE Lucknow Circle PWD. Lucknow
14 Mar 2024
6 Jan 2024
18 Jan 2024
6 Jan 2024
18 Jan 2024
6 Jan 2024
8 Jan 2024
Amount
Construction of Subgrade with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to achive the dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects. (Including all labour & T&P with all taxes complete but excluding GST)
Construction of Subgrade with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to the desired dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects. ( Compaction Only)(Including all labour & T&P with all taxes complete but excluding GST)
Excavation for road work in soil with hydraulic excavator including cutting trimming bottom and side slopes, in accordance with requirement of lines, grades and sections.(Including all labour & T&P with all taxes complete but excluding GST)
Construction of granular sub-base by grade-1 for providing well graded material from approved quarry , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per Technical Specification Clause 401.(Including all material, labour & T&P with all taxes complete but excluding GST)
Stabilized WMM:-Providing, laying and spreading of graded stone aggregate (WMM) after mixing with 3.5% Emulsion & 1% OPC cement with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying in uniform single layer with paver as cemented base on sub base/sub grade ( modified soil) and compacting with the road roller to achieve the desire compaction as per MORT & H Specification Clause 406 complete in all respects Including all Material, labour, T&P with all taxes etc. complete but excluding cost of GST.
Construction of earthen shoulders with material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to the desired dry density not less then 97% as per table 300-2. work should be done as per MORTH & H Specification Clause 305 complete in all respects.
Providing and applying tack coat with bitumen VG-10 using Bitumen Boiler with sprayer at the rate of 0.20 kg per sqm on the prepared surface cleaned with hydraulic broom as per MoRT & H Specifications Clause 503 complete in all respects.(Including all material, labour & T&P with all taxes complete but excluding GST)
Providing and laying dense graded bituminous macadam Grading 2 with Batch type hot mix plant producing 120 TPH using crushed aggregates from approved quarry of specified grading, premixed with bituminous binder VG_30 @ 4.5 % , transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled and tandem roller to achive the desired compaction as per MORTH & H Specification Clause 505 complete in all respects.(Including all material, labour & T&P with all taxes complete but excluding GST)
Providing and laying bituminious concrete Grading 2 with Batch type hot mix plant producing 120 TPH using crushed aggregates from approved quarry of specified grading, premixed with bituminous binder VG_30 @ 5.4%, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, tandem roller and Pneumatic Tyre roller to achive the desired compaction as per MORTH & H Specification Clause 507 complete in all respects.(Including all material, labour & T&P with all taxes complete but excluding GST)
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.(Including all labour & T&P with all taxes complete but excluding GST)
Plain cement concrement 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compected by vibration including curing for 14 days.(Including all material, labour & T&P with all taxes complete but excluding GST)
Brick work in 1:3 cement and coarse sand mortar including supply of all material, labour T .P. etc. required for proper completion of work.(Including all material, labour & T&P with all taxes complete but excluding GST)
Furnishing and Placing Reinforced cement concrete M-20 in super-structure as per drawing and Technical Specification.(Including all material, labour & T&P with all taxes complete but excluding GST)
Furnishing and Placing Reinforced cement concrete M-25 in super-structure as per drawing and Technical Specification.(Including all material, labour & T&P with all taxes complete but excluding GST)
Supplying, fitting and placing HYSD bar / SAIL TMT bar reinforcement in super-structure complete as per drawing and technical specifications.(Including all material, labour & T&P with all taxes complete but excluding GST)
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.(Including all material, labour & T&P with all taxes complete but excluding GST)
Drainage Spouts complete as per drawing and Technical specification.(Including all material, labour & T&P with all taxes complete but excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications.(Including all material, labour & T&P with all taxes complete but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.(Including all material, labour & T&P with all taxes complete but excluding GST)
Laying reinforced cement concrement pipe 1000 mm dia for culverts on first class bedding of granular material in single row including fixing coller with cement motar 1:2 but excluding excavation protection work back filling concrete and masonary works in head walls as per MORT & H specification 2900 laying in diversion and hume pipe culvert.(Including all material, labour & T&P with all taxes complete but excluding GST)
Laying reinforced cement concrement pipe 600 mm dia for culverts on first class bedding of granular material in single row including fixing coller with cement motar 1:2 but excluding excavation protection work back filling concrete and masonary works in head walls as per MORT & H specification 2900 laying in diversion and hume pipe culvert.(Including all material, labour & T&P with all taxes complete but excluding GST)
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (Including all material, labour & T&P with all taxes complete but excluding GST)
Furnishing and Placing PCC Grade M20 in sub-structure as per drawing and Technical Specification.(Including all material, labour & T&P with all taxes complete but excluding GST)
Providing and laying of interlocking concrete block pavament M-30Mpa compressive strength having thickness 80 mm as per drawing and technical specification clause 1504 (Rate Excluding G.S.B.) Including all Material, labour, T&P with all taxes etc. complete but excluding cost of GST.
A B ASSOCIATES
M/s Ram Singh Agarwal
M/S DEEPAK KUMAR AGARWAL
Awadh Construction
M/S Ram Sewak Har Govind Sahai
M/s Raj Laxmi Enterprises
M/S MAA ADI SHAKTI CONSTRUCTION
M/S RAJ CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid