| Sl No | Description | Qty | Unit | MR.MANOJ PRABHAKAR, CONTRACTOR L3 | MR.M.KASIPANDAN, CONTRACTOR L2 | MR.K.MARIALOUISPANDIAN L4 | MR.A.MADASAMY, CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF 1.50 M SPAN CULVERT AT SAMATHUVAPURAM IN KURUKKALPATTI VILLAGE AND PANCHAYAT IN MELANEELITHANALLUR BLOCK | |||||||
| 2.00Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete | |||||||
| 3.00 | Foundation | 49.08 | cum | 280 ₹13,742.4 | 263 ₹12,908.04 Lowest | 300 ₹14,724 | 263 ₹12,908.04 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete - Base Concrete | 3.34 | cum | 5,500 ₹18,370 | 5,489 ₹18,333.26 Lowest | 5,500 ₹18,370 | 5,489 ₹18,333.26 Lowest |
| 5.00Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete., | |||||||
| 6.00 | Below Sill Level | 66.42 | cum | 560 ₹37,195.2 | 547 ₹36,331.74 Lowest | 580 ₹38,523.6 | 547.5 ₹36,364.95 |
| 7.00 | Above Sill Level | 100.86 | Sqm | 560 ₹56,481.6 | 547 ₹55,170.42 Lowest | 590 ₹59,507.4 | 547.5 ₹55,220.85 |
| 8.00 | Bed Block/Deck Slab | 12.13 | cum | 1,100 ₹13,343 | 1,095 ₹13,282.35 Lowest | 1,120 ₹13,585.6 | 1,095 ₹13,282.35 Lowest |
| 9.00 | Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 59.82 | Sqm | 5,800 ₹3,46,956 | 5,793 ₹3,46,537.26 Lowest | 5,800 ₹3,46,956 | 5,793 ₹3,46,537.26 Lowest |
| 10.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete | 4.07 | cum | 6,900 ₹28,083 | 6,883 ₹28,013.81 Lowest | 6,900 ₹28,083 | 6,883 ₹28,013.81 Lowest |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
13 Aug 2025, 3:00 pmClosed
Block Development Officer(BP), Melaneelithanallur
Block Development Office, Melaneelithanallur
CONSTRUCTION OF 1.50 M SPAN CULVERT AT SAMATHUVAPURAM IN KURUKKALPATTI VILLAGE AND PANCHAYAT IN MELANEELITHANALLUR BLOCK
2025_RDTN_589499_1
BDOMNR/262/2025-A3
Open Tender
Civil Works
Works
180 days
Block Development Office, Melaneelithanallur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹14,000
3 Oct 2025
6 Aug 2025
13 Aug 2025
6 Aug 2025
13 Aug 2025
6 Aug 2025
Amount
CONSTRUCTION OF 1.50 M SPAN CULVERT AT SAMATHUVAPURAM IN KURUKKALPATTI VILLAGE AND PANCHAYAT IN MELANEELITHANALLUR BLOCK
Earthwork excavation in all classes of Soils and Sub soils except hard rock requiring blasting including initial lead and lift, dressing the excavation upto bed level for Foundation as SS 20 B specification etc., complete
Foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete - Base Concrete
Supplying and erection Centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab, Lintel, Beam, Column, Sunshade including cost and coveyance of all materials to site and all other incidental charges etc complete.,
Below Sill Level
Above Sill Level
Bed Block/Deck Slab
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site, labour charges for mixing, laying, compacting and curing concrete etc., complete
Reinforced Cement Concrete 1:1.5:3 using 20mm ISS HBG metal including cost and conveyance of all maerials to site and all labour charges for mixing concrete, placing, ramming, vibrating with mechanical vibrator, consolidation and Curing etc., complete as directed by departmental officers.
Supplying and fabrication of Steel Fe 415/500 grade required for all RCC item of works involved including fabrication and labour charges for Cutting, bending, tying, placing in position, includes overlaping length wherever required etc., complete.,
Provision for Expansion joint uisng Bituminous Tar pad between Deck slab and Abutment/Back wall structure (To prevent Expansion and Contraction of concrete structures at joints) including all labour and other incidental charges etc., complete
Supply and filling Gravel from approved quarry for Base layer in layers not more than 15mm thick, including cost of material, labour charges for filling, levelling, sectioning and compacting etc., complete as directed by officers.
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
MR.M.KASIPANDAN, CONTRACTOR (BID ID -1427701)
MR.MANOJ PRABHAKAR, CONTRACTOR (BID ID -1428058)
MR.K.MARIALOUISPANDIAN (BID ID -1427927)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .