Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
26 May 2022, 2:00 pmClosed
SE/TEDC/TIN
Anna Building Maharajanagar
Execution of work towards Agriculture segregation in Thisayanvilai feeder in Kottaikarungulam Section/Valliyoor Division under RDS Scheme in Tirunelveli EDC
2022_EB_233063_1
SE/TEDC/TIN/ETW23/22-23
Open Tender
Electrical and Maintenance Works
Works
120 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
Yes
10 Jun 2022
20 May 2022
27 May 2022
20 May 2022
26 May 2022
20 May 2022
Amount
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 8 mtr PSC poles by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 36' by using JCB or manual
Erection of 8 mtr PSC poles by using JCB or manual
Erection of 9 mtr PSC poles by using JCB or manual
Erection of RSJ Rail, fabricated poles above 36'-0' by using JCB or manual
Erection of stay set complete
Fixing of 3.6" "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Fixing of 4.6" "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of pin Insulators with Pin 11 KV
Fixing of 11 KV strain disc.
Fixing of LT pin Insulator with pin
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with pin including burying looping and binding
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines without LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/3.35 mm ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/3.35 mm ACSR for both HT/LT lines without LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines without LC work.
Concreting of Poles as per Board standards (2*2*5). The material such as sand, jelly, etc., have to be supplied by contractor including Cement supplied by Contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour Charges for placing Transporting of Sand, jally, from box and water curing etc,. complete as per field Engineer's instructions.
Sleeve concreting including materials (Cement 1/2 bag +river sand and Blue metals and watering) as per field Engineer's instructions.
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Erection of Double Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Flat guarding arrangement 2wire
Flat guarding arrangement 4wire
Transport of Materials/ conductors and other materials from road side to site.
Transport of poles/Materials/ conductors and other materials from store to site ( for Hired Vehicle) upto 20KM
Transport of poles/Materials/ conductors and other materials from store to site ( for Hired Vehicle) beyond 20KM
Loading/Unloading of poles upto 8 mtr PSC poles
Loading/Unloading of poles upto 9 mtr PSC poles & RCC Square Pole
Loading/Unloading of poles above 36'-0' RSJ pole
Loading/Unloading of Metering sets of all ratios
Transporting of 8mt poles from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of 9.0mt poles & 9.0mt RCC Square Pole from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of poles above 36'-0' RSJ polefrom road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of Metering sets of all ratios from road site to pole pit including loading and unloading of poles by using JCB or manual
Loading or unloading of Transformer upto 200 KVA for each
Loading or unloading of HT Metering sets all ratios
Transporting of Distribution Transformer up to 20KM
Transporting of Distribution Transformer beyond 20KMS
Erection of New Transformer upto 200 KVA
Erection of HT Metering set all ratios
Dismantling of Distribution Transformer upto 200KVA
Dismantling of AB switch
Dismantling of 7/3.35sq.mm ACSR with LC work
Dismantling of 7/2.59sq.mm ACSR with LC work
Dismantling of 7.5 / 8 mt Poles
Dismantling of 9 mt Poles
Dismantling of Opentype
Dismantling of 3phase X arm
Dismantling of Sphase X arm
Removing the HT Disc Insulators with Metal parts
Removing the HT pin Insulators with pin
Removing the LT pin Insulators with pin
Romoving the shackle
Re-Sagging of HT/LT line for all span Various size of conductor
Erection of street light switch point arrangement
Releasing of Street light and re-fixing.
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (up to 50 HP) re-fixing.
Erection of D.P. structure with AB switch top channel, cross bracing, HG fuse set, earthing, painting, providing stay and pole concreting as per field Engineer's instructions.
Alteration of Back clamp
Alteration of Stay clamp
Fixing of DT Metering Labour charges
Releasing of DT Metering Labour charges
Fencing of DT structure at road side-fabrication and erection with std specification
Dismantling and Reerection of Stay set complete
Changing of Pin Point to Cut point in LT line
Provision of Distribution Transformer Name Board (Name of the 22/11KV #, Name of the SS, Capacity, Danger Board.)
Cutting of coconut leaves (per tree)
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of flat
Cutting of channel
Cutting of Angle
Aluminium Painting of all types of clamps, flat, angle (Paint to be supplied by the contractor)
Aluminium Painting of all types of cross arm (Paint to be supplied by contractor)
Earthwork excavating, depositing on bank with an initial lead of 10 m and lift of 2 m in medium rock and dense medium rock not requiring blasting
PCC 1:3:6 using 20 mm HBS jelly including cost of all materials, lead, lift, etc., complete without form work.
PCC 1:3:6 using 20 mm HBS jelly including cost of all materials, lead, lift, etc., complete with form work.
Plastering with CM 1:5, 12 mm thick including cost of all materials, lead, lift, curing etc., complete
Labour charges for painting the plinths Providing two coats of ready mixed Exterior Emulsion painting of approved colour & quality on outer walls over one coat of white cement primer,including cost of all materials, scaffolding charges, labours, lead, lift, etc. complete.- to be done by contractor)
Labour Charges for providing grouting pocket, placing the template for breaker foundation as per the drawing, grouting the foundation bolt as per the instruction of the site engineer including the cost of curing, T&Ps etc., complete
Labour for Erection of 33/22/11 KV breaker with own crane arrangement and connecting link rod, SF6 gas filling and other consumables including support poles cutting, jointing, providing holes and bending of pipes whereever required and as directed by the field engineer
Labour for erection of 11KV/33KV AB switches including the cost of consumables, lubricant, wiring and alignment, checking of operation and commissioning and as directed by the field engineer.
Labour for erection of LAS Distribution type single pole stack 33 KV /11KV including fabrication of base if required
Labour for erection of 33/22/11 KV Measurement Transformer using manual labour or crane own arrangement (one S Ph or 3 Ph unit ) including providing holes wherever required as directed by the field engineer.
Labour for erection of droppers and jumpers including fabrication and any modification of end clamps wherever necessary and as directed by the field engineer.
Labour for erection of Busbar including fabrication and any modification of end clamp wherever necessary and as directed by the field engineer.Using 50mm bus bar of length (without making bends)
Erection of Simplex Panel including alignment and earthing as directed by field engineer
Labour for laying of cable in duct/trench including the cost of Alu.tag for identification.Upto 8 core
Labour Charges for VCB , CT,AB SWITCH & Panel Earthing works
Labour for providing New Bay Channel extension works including Double coating Aluminium painting of Iron parts
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .