Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,800
Closing Date
12 May 2022, 2:00 pmClosed
SE/ Operation / NCTPS-I
SE/ Operation / NCTPS-I, North Chennai Thermal Power Station -I, Chennai- 600 120.
NCTPS I Operation Circle O and E Dn Fire Fighting Overhauling of 1No 150 KW motor and Rewinding of 1 No 150KW motor for fire protection system
2022_EB_230594_1
SE/OPN/ NCTPS-I/08/2022-23
Open Tender
Power/Energy Projects/Products
Works
45 days
NCTPS I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,800
Yes
27 May 2022
28 Apr 2022
13 May 2022
28 Apr 2022
12 May 2022
28 Apr 2022
Amount
Charges for complete overhauling of 150 KW motor which involves shifting of 150 KW motor from RWPH to repair bay, dismantling, cleaning of the stator coils, checking the tightness of the stator wedges, fabrication of new bearing sleeve suitable to size to fix on the machined NDE & DE cover, metal filling the NDE & DE cover, machining to required dimension, fixing of new sleeve on the NDE & DE cover and positioning, aligning to accommodate NDE & DE bearing, replacement of both DE and NDE bearings and fabrication of terminal cover, copper terminal flat, Hylem sheet for support insulation including assembling and cost of bearings, Hire charges for T&P and cost of consumables.
Charges for rewinding of 150 KW motor which involves shifting of 150 KW motor from RWPH to Repair bay, rewinding of motor including dismantling, cleaning, winding of the stator coils, applying one coat of insulating varnish, including silicon take of leads, fabrication of new bearing sleeve suitable to size to fix on the machined NDE & DE cover, metal filling the NDE & DE cover, machining to required dimension, fixing of new sleeve on the NDE & DE cover and positioning. Aligning to accommodate NDE & DE bearing, replacement of both DE and NDE bearings and fabrication of Terminal cover, copper terminal flat, Hylem sheet for support insulation including assembling and cost of bearings, Hire charges for T&P, cost of consumables and transportation charges with less cost of copper wire. (Retrieved copper will be retained by the contractor).
SRI RAVI BALAJI ERECTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .