| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-Finance HIMACHAL PRADESH HP | ₹16.3 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹18.9 L+₹2.6 L (16.2%)Rejected-Finance | ₹18.9 L+₹2.6 L (16.2%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹19.0 L+₹2.7 L (16.6%)Rejected-Finance | ₹19.0 L+₹2.7 L (16.6%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹19.3 L+₹3.0 L (18.1%)Rejected-Finance | ₹19.3 L+₹3.0 L (18.1%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹19.6 L+₹3.3 L (20.3%)Rejected-Finance | ₹19.6 L+₹3.3 L (20.3%) | L5 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Ajay Sharma L2 | Ashok Kumar Thakur L3 | M/S Birwan Constructions L4 | Bhanu Prakash L5 | Ajay Kumar L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches in all type of soil such as pickwork jumper work blasting work Kankar moorum, shingles including decomposed soft and hard rock etc.upto all heights stacking the excavated earth not more than 3mtrs clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth in all leads and lifts & as per directed of the Engineer in-charge. | 70.02 | P/cum | 400 ₹28,008 | 360 ₹25,207.2 Lowest | 360 ₹25,207.2 Lowest | 375 ₹26,257.5 | 550 ₹38,511 |
| 2.00 | Providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in Foundation & plinth complete in all respect upto all leads and lifts & as per directed of the Engineer in-charge. | 8.46 | P/Cum | 8,500 ₹71,910 | 9,750 ₹82,485 | 9,900 ₹83,754 | 9,000 ₹76,140 | 7,000 ₹59,220 Lowest |
| 3.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in:- | ||||||||
| 3.01 | in foundation footing etc. complete in all respect. | 7.81 | P/cum | 10,500 ₹82,005 | 11,000 ₹85,910 | 10,800 ₹84,348 | 9,900 ₹77,319 | 9,800 ₹76,538 Lowest |
| 3.02 | in wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level complete in all respect. | 20.76 | P/cum | 10,500 ₹2,17,980 | 11,500 ₹2,38,740 | 10,800 ₹2,24,208 | 9,900 ₹2,05,524 | 9,800 ₹2,03,448 Lowest |
| 4.00Prov. form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm. so as to give a rough finish i/c centring, shuttering, strutting & propping etc. height of propping & centering below supporting floor to ceiling not exceeding 4mtr. & removal of same for insitu rainforceed concrete and palin concrete work in:- | ||||||||
| 4.01 | Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters, buttress, plinth and string courses and the like complete in all respect. | 208.8 | P/Sqm | 350 ₹73,080 | 350 ₹73,080 | 360 ₹75,168 | 400 ₹83,520 | 330 ₹68,904 Lowest |
| 4.02 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like. Floors etc. up to 200mm in thickness complete in all respect. | 1.33 | P/Sqm | 345 ₹458.85 Lowest | 750 ₹997.5 | 450 ₹598.5 | 450 ₹598.5 | 430 ₹571.9 |
| 5.00 | Providing in RCC work smooth finishing of the exposed surface with cement mortor 1:3 (1cement : 3 sand) complete in all respect. | 210.13 | P/Sqm. | 150 ₹31,519.5 Lowest | 250 ₹52,532.5 | 180 ₹37,823.4 | 180 ₹37,823.4 | 170 ₹35,722.1 |
| 6.00 | Providing and laying cement concrete 1:2:4 (1cement:2sand : 4graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in Suspended floor, roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilevers up to floor two level. | 0.28 | P/cum | 10,250 ₹2,870 | 10,500 ₹2,940 | 9,000 ₹2,520 Lowest | 10,800 ₹3,024 | 9,000 ₹2,520 Lowest |
Tender Value
₹23.0 L
EMD Value
₹46,000
Closing Date
17 Aug 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Solan
SH Construction of filter bed.
2026_HPIPH_140044_1
7069-7168 dated 25.07.2026
Open Tender
Civil Works
Item Rate
30 days
Solan
Please refer tender notice
7 documents required · 7 mandatory
₹500
₹46,000
17 Sept 2026
27 Jul 2026
17 Aug 2026
27 Jul 2026
17 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches in all type of soil such as pickwork jumper work blasting work Kankar moorum, shingles including decomposed soft and hard rock etc.upto all heights stacking the excavated earth not more than 3mtrs clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundations etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth in all leads and lifts & as per directed of the Engineer in-charge. | 70.02 | P/cum | 1.25 | ₹87.52 |
| 2 | Providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring & shuttering in Foundation & plinth complete in all respect upto all leads and lifts & as per directed of the Engineer in-charge. | 8.46 | P/Cum | 1.25 | ₹10.58 |
| 3Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in:- | |||||
| 3.01 | in foundation footing etc. complete in all respect. | 7.81 | P/cum | 1.25 | ₹9.76 |
| 3.02 | in wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level complete in all respect. | 20.76 | P/cum | 1.25 | ₹25.95 |
| 4Prov. form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm. so as to give a rough finish i/c centring, shuttering, strutting & propping etc. height of propping & centering below supporting floor to ceiling not exceeding 4mtr. & removal of same for insitu rainforceed concrete and palin concrete work in:- | |||||
| 4.01 | Vertical surfaces such as walls (any thickness), partitions and the like including attached pillasters, buttress, plinth and string courses and the like complete in all respect. | 208.8 | P/Sqm | 1.25 | ₹261 |
| 4.02 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like. Floors etc. up to 200mm in thickness complete in all respect. | 1.33 | P/Sqm | 1.25 | ₹1.66 |
| 5 | Providing in RCC work smooth finishing of the exposed surface with cement mortor 1:3 (1cement : 3 sand) complete in all respect. | 210.13 | P/Sqm. | 1.25 | ₹262.66 |
| 6 | Providing and laying cement concrete 1:2:4 (1cement:2sand : 4graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in Suspended floor, roofs, landing and shelves and their support balconies, beams, girders, bressumers and cantilevers up to floor two level. | 0.28 | P/cum | 1.25 | ₹0.35 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Form_6.pdf
Tender Documents • 0.83 MB
Form_8.pdf
Tender Documents • 1.34 MB
Terms_and_conditions.pdf
Tender Documents • 0.35 MB
BOQ_207623.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .