Loading…
Loading…
Tender Value
₹1.5 Cr
EMD Value
₹9.3 L
Closing Date
30 Sept 2026, 12:00 pm3d left
SE BANDA CIRCLE PWD BANDA
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
CONSTRUCTION WORK OF A SMALL BRIDGE IN PLACE OF THE CULVERT LOCATED ON MADARAR DRAIN IN LAHORA LINK ROAD IN BANDA DISTRICT
2026_CEBAN_1187723_2
3798/35 C - Banda Circle/2026 Dt. 10-09-2026
Open Tender
Civil Works - Bridges
Percentage
180 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹9.3 L
Yes
OFFICE OF THE SE BANDA CIRCLE PWD BANDA
24 Sept 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60metres. | 450.7 | cum | 318 | ₹1,43,322.6 |
| - | Bridge Work
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. | 1,592.07 | cum | 114 | ₹1,81,495.98 |
| - | Sand filling in plinth including supply of necessary quantity of sand the site of work & including watering, dressing etc. Rate to include cost of all materials, labour and tools & plants etc. required for proper completion of the work. (S.I.No. 255) | 284.54 | cum | 1,403 | ₹3,99,209.62 |
| - | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 148.42 | cum | 5,065 | ₹7,51,747.3 |
| - | Furnishing and Placing Reinforced/ Prestressed cement concrete in M25 sub-structure as per drawing and Technical Specification. | 169.97 | CUM | 6,037 | ₹10,26,108.89 |
| - | Furnishing and Placing Reinforced/ Prestressed cement concrete in M25 super-structure as per drawing and Technical Specification. | 123.46 | CUM | 7,210 | ₹8,90,146.6 |
| - | Furnishing and Placing Reinforced/ Prestressed cement concrete in M25 super-structure as per drawing and Technical Specification. | 120.44 | CUM | 7,210 | ₹8,68,372.4 |
| - | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications | 17.91 | cum | 6,300 | ₹1,12,833 |
| - | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications | 33.5 | MT | 71,864 | ₹24,07,444 |
| - | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. | 94.9 | cum | 2,504 | ₹2,37,629.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Tendernotice_2.pdf
PDF • 1.21 MB
BOQ_2241003.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .