| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 CrAdmitted-Finance PLOT NO 08 3RD FLOOR MAHANADI VIHAR NUA BAZAR CUTTACK ODISHA 753003 | CUTTACK | ODISHA | 753003 | ₹9.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹9.5 CrAdmitted-Finance | ₹9.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹10.0 CrAdmitted-Finance | ₹10.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹10.9 CrAdmitted-Finance | ₹10.9 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| Sl No | Description | Qty | Unit | M.K.Groups L3 | M/s S.K Mohapatra L1 | SHIVASAKTI ENGINEERING AND CONSTRUCTION L2 | CHENNAI RADHA ENGINEERING WORKS PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|
| 1.00(A) CIVIL WORK: | |||||||
| 2.00 | Earth work in excavation in all kinds of soil & disposing the excavated materials at a point specified by the Engineer-In-charge within initial lead and lift with supply of all labour, T&P, all taxes, hire & running charges of all equipment / machineries, etc. complete as per the direction of Engineer-In-Charge. | 6,889 | CUM | 200 ₹13.8 L | 450 ₹31.0 L | 100 ₹6.9 L | 352 ₹24.2 L |
| 3.00 | Filling sweet sand up to 900 mm height including collecting, conveying by private trucks/dumpers within a lead of 40 km (avg.) and all lifts with covering at the top to prevent spillage of sand during transportation, loading at one end & unloading at other end, spreading and laying in layer in cable trench after laying of cable with supply of all labour, materials, T&P, all taxes, royalties, running and hire charges of truck/dumpers including gate entry fees etc. complete as per Scope of Work. | 2,533.84 | CUM | 900 ₹22.8 L | 1,200 ₹30.4 L | 418 ₹10.6 L | 1,375 ₹34.8 L |
| 4.00 | Cement concrete (1:4:8 (1 cement : 4 coarse sand: 8 coarse aggregate) using 40mm & down grade hard granite metal (Crusher Broken) of approved quality including mixing in mixer machine, hoisting, laying, consolidating, curing, centering & shuttering, transportation, etc. complete with supply of all materials, labour, T&P, taxes, tollage, royalties, gate entry fees, hire & running charges of all equipment, cost of cement, etc. all complete as directed by the Engineer-in-charge. | 560.72 | CUM | 4,950 ₹27.8 L | 7,500 ₹42.1 L | 5,060 ₹28.4 L | 6,380 ₹35.8 L |
| 5.00 | Cement concrete (1:1½:3) in foundation trenches & culverts, etc. (1 cement : 1½ coarse sand : 3 coarse aggregate) using 20 mm and down graded black granite chips (Crusher Broken) of approved quality including mixing in mixer machine, hoisting, laying, consolidating with vibrator and curing, maintaining proper level & slope, finished smooth to be exposed surface etc. complete with supply of all materials, labour, T&P, taxes, tollage, royalties, gate entry fees all testing, barricading the work site etc. including cost of all materials complete as directed by the Engineer-in-charge. (But excluding cost of binding wire, cost of steel & labour charges for bending & binding of steel & cost of form work). | 2,164.28 | CUM | 6,900 ₹1.5 Cr | 8,500 ₹1.8 Cr | 6,050 ₹1.3 Cr | 8,580 ₹1.9 Cr |
| 6.00 | Supply of FE-500 steel confirming to IS-1786 specifications including cutting, straightening, bending, binding & placing the grills in position for RCC culvert & cable trench works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, testing, all taxes, tollage, etc. all complete as directed by the Engineer-in-charge. N.B Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid. | 2,164.28 | Qtl | 7,600 ₹1.6 Cr | 9,500 ₹2.1 Cr | 7,480 ₹1.6 Cr | 9,790 ₹2.1 Cr |
| 7.00Providing rigid, smooth, leak proof, centering & shuttering with form works made of ply / steel shutters for R.C.C rafts/culvert roof slab/cable trench wall / pre-cast slab etc. applying coaltar before concreting, dismantling the same after stripping off period including supply of all materials, labour, T&P, tollage, royalties, taxes, transportation, etc. all complete as directed by the Engineer-in-charge. | |||||||
| 7.10 | Footing & Foundation | 3,803.28 | Sq. Mtr. | 200 ₹7.6 L | 220 ₹8.4 L | 308 ₹11.7 L | 605 ₹23.0 L |
| 7.20 | RCC Wall | 14,838.4 | Sq. Mtr. | 550 ₹81.6 L | 320 ₹47.5 L | 341 ₹50.6 L | 715 ₹1.1 Cr |
| 8.00 | Earth work in filling of all kinds of soil with excavated material by two side of newly constructed culvert and cable trench, leveling, dressing, watering, compacting with cost of all labour, taxes, T&P, hire & running charges of all equipment/machineries etc. complete as directed by Engineer-in-charge. | 4,592.67 | CUM | 160 ₹7.3 L | 100 ₹4.6 L | 88 ₹4.0 L | 242 ₹11.1 L |
Tender Value
₹8.9 Cr
EMD Value
₹17.7 L
Closing Date
15 Jul 2025, 6:00 pmClosed
S K BHOI, EE, PED-II, PPA
S K BHOI, EE, PED-II, PPA
Construction of RCC cable trench, supply and laying of HT cable for Crude Oil Import Terminal of M/s Numaligarh Refinery Limited.
2025_MoS_864592_1
EM/PED- 19/2025
Open Tender
Miscellaneous Works
210 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,600
Yes
As per Tender Document and e-TCN
₹17.7 L
Yes
In the conference hall
30 Jan 2026
13 Jun 2025
16 Jul 2025
13 Jun 2025
15 Jul 2025
13 Jun 2025
13 Jun 2025 - 23 Jun 2025
24 Jun 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid