Tender Value
₹80.7 L
EMD Value
₹1.6 L
Closing Date
22 May 2026, 9:30 amClosed
DSCO Gurdaspur
room no 402 third floor Block B District Administration Complex Gurdaspur
Rain Water Harvesting cum Silt Detention Works with labour cum material
2026_DOA_168143_1
DSWC/GUR/2026-2027/01
Open Tender
Civil Works
90 days
Pathankot
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
Yes
₹1.6 L
Yes
22 May 2026
11 May 2026
22 May 2026
11 May 2026
22 May 2026
11 May 2026
CSR 29.70 CSR29.71
Pipe Dia Excavation Lowering TC Jointing Cutting Cutting AVP Fixing AAV Fixing AVP
435 0.4 1.2 mat lab
with 850 bajri & 850 sand
Cement sand bajri lab Total
198.13 Cement sand bajri lab Total
calculation for 800 mm cement 245,sand 1200,bajri 1400
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village DASKA (C/o 11180/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1344 /m3 53 71232
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 700 /Mtrs 54.46 38122
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 280 /Joints 221.52702886247877 62027.56808149406
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 47.25 283.5
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 2 /Cut hole 13.049999999999999 26.099999999999998
Fixing of Risers & Alfa valves with C.C 1:2:4 6 /Riser & Valve 733.9434069043576 4403.660441426146
Fixing of Air vent Pipes with C.C 1:2:4 2 /Air pipe 226.3786078098472 452.7572156196944
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 2 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 59800
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 283 Per joint 24 Rupees Twenty Four Only 6792
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 26424 Rupees Twenty Six Thousand Four Hundred Twenty Four Only 26424
Grand Total 269563.5857385399
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village KALBANJARA (C/o 69500/L) District Sangrur
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1840 /m3 53 97520
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 920 /Mtrs 54.46 50103.200000000004
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 368 /Joints 221.52702886247877 81521.94662139218
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 8 /Cut hole 47.25 378
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 4 /Cut hole 13.049999999999999 52.199999999999996
Fixing of Risers & Alfa valves with C.C 1:2:4 8 /Riser & Valve 733.9434069043576 5871.547255234861
Fixing of Air vent Pipes with C.C 1:2:4 4 /Air pipe 226.3786078098472 905.5144312393888
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 66.28 Rupees Sixty Six and Twenty Eight Paise Only 530.24
B.B.C 1:8:16 0.6 cum 2771.21 Rupees Two Thousand Seven Hundred Seventy One and Twenty One Paise Only 1662.7259999999999
Plain Cement Concrete 1:2:4 0.14 cum 3829.07314285714 Rupees Three Thousand Eight Hundred Twenty Nine and Seven Paise Only 536.0702399999997
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 3589.2781202526326 Rupees Three Thousand Five Hundred Eighty Nine and Twenty Seven Paise Only 17049.071071200004
12.5 mm thick cement plaster work 1:4 15.32 cum 94.11296240208875 Rupees Ninety Four and Eleven Paise Only 1441.8105839999998
RCC Slab 1:2:4 0.21 cum 7434.5 Rupees Seven Thousand Four Hundred Thirty Four and Fifty Paise Only 1561.245
Foot rest (Item No. 29.37) 8 No 116.1 Rupees One Hundred Sixteen and Ten Paise Only 928.8
Total Cost for ONE Haudi 23710
Total Cost for ZERO Haudi 0
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Shutter Gate 0 each 7500 Rupees Seven Thousand Five Hundred Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Providing and Fixing of Gate Valve 5 each 29900 Rupees Twenty Nine Thousand Nine Hundred Only 149500
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 368 Per joint 24 Rupees Twenty Four Only 8832
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 Overall 34733 Rupees Thirty Four Thousand Seven Hundred Thirty Three Only 34733
Grand Total 429417.4083078664
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GUR/2026-27/01
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
Rain Water Harvesting cum Silt Detention Works, Village Thara Jhikla Tika Biya Chubara, Village Awan, Village Ghar Bagroli, Village Patralwan, Village Naloh, Village Dunera (Malki Choe), Village Barsudal (Sambya Choe), Village Thala Lahri (Lakh Choe), Village Kui (Khab Choe), Village Niari (Haler Choe), Village Phagli (Dani Choe), Village Balewan (Balewan Choe), Village Phagli and Sarti (Bahri Choe), Distt. Pathankot.
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs 8070622
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%) 0
WORK-1 :- Rain Water Harvesting cum Silt Detention Works, Village Village Thara Jhikla Tika Biya Chubara Distt. Pathankot.
Est. No. 7283/D.B, dated 24.03.2026, Amount 492300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Recharging-cum- Silt detention Structure 169994 302116 -
2 Crate wire Structure 12550 7737 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 213 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 32.78 cum 1006.23 per cum
3 Cost of Stone Aggregate 7.49 cum 555.2 per cum
4 Cost of Bajri 7.1 Cum 683.09 per cum
5 Cost of Boulder 89.75 cum 714.25 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 48.27 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 7.49 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 7.89 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 32.29 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 49.31 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 62.9 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 8 cum 881.61 per cum
2 Cost of G.I crate wire (including GST) 77 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 8 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 35 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 35 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 8 cum 338.17
WORK-2 :- Rain Water Harvesting cum Silt Detention Works, Village Awan Distt. Pathankot.
Est. No. 7215/D.B, Dated 19.03.2026, Amount 504000/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 173667 310149 -
5 Crate wire Structure 12492 7737 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 221 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.9 cum 968.68 per cum
3 Cost of Stone Aggregate 8.06 cum 557.96 per cum
4 Cost of Bajri 7.5 Cum 652.7 per cum
5 Cost of Boulder 91.6 cum 711.12 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 51.11 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 8.06 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 8.33 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 34.14 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 49.13 cum 3486.03
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 72.9 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 8 cum 874.41 per cum
2 Cost of G.I crate wire (including GST) 77 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 8 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 35 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 35 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 8 cum 338.17
WORK-3 :- Rain Water Harvesting cum Silt Detention Works, Village Ghar Bagroli, Distt. Pathankot.
Est. no. 7207/D.B, dated 19.03.2026, Amount 701300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 252875 432583 -
2 Crate wire Structure 10003 5903 -
Cost Of Material (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 293 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 45.87 cum 1054.82 per cum
3 Cost of Stone Aggregate 9.72 cum 644.1 per cum
4 Cost of Bajri 8.88 Cum 738.84 per cum
5 Cost of Boulder 130.16 cum 797.27 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 67.22 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 9.72 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 9.87 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 42.28 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 76.05 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 67.09 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 960.55 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-4 :- Rain Water Harvesting cum Silt Detention Works, Village Patralwan, Distt. Pathankot.
Est. no. 6988/D.B, dated 13.03.2026, Amount 503800/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 184536 303135 -
2 Crate wire Structure 10322 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 206 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 32.11 cum 1107.85 per cum
3 Cost of Stone Aggregate 6.7 cum 697.13 per cum
4 Cost of Bajri 6.26 Cum 791.87 per cum
5 Cost of Boulder 91.19 cum 850.29 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 51.13 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 6.7 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.95 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 29.8 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 53.1 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 47.69 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 1013.58 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-5 :- Rain Water Harvesting cum Silt Detention Works, Village Naloh, Distt. Pathankot.
Est. no. 6992/D.B, Dated 13.03.2026, Amount 653600/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 206043 432583 -
2 Crate wire Structure 5903 8493 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 293 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 45.87 cum 851.84 per cum
3 Cost of Stone Aggregate 9.72 cum 404.5 per cum
4 Cost of Bajri 8.88 Cum 466.89 per cum
5 Cost of Boulder 130.16 cum 545.44 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 67.22 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 9.72 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 9.87 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 42.28 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 76.05 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 67.09 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 708.72 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-6 :- Rain Water Harvesting cum Silt Detention Works, Village Dunera (Malki Choe) Distt. Pathankot.
Est. no. 6865/D.B dated 12.03.2026 Amount 658000/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 234000 408086 -
2 Crate wire Structure 5903 10096 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 259 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 42.24 cum 1070.64 per cum
3 Cost of Stone Aggregate 9.04 cum 657.97 per cum
4 Cost of Bajri 5.64 Cum 753.16 per cum
5 Cost of Boulder 124.26 cum 811.87 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 63.06 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 9.04 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.27 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 40.24 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 72.727 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 62.984 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 975.92 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-7 :- Rain Water Harvesting cum Silt Detention Works, Village Barsudal (Sambya Choe) Distt. Pathankot.
Est. no. 6869/D.B dated 12.03.2026, Amount 522000/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 187623 318522 -
2 Crate wire Structure 10043 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 217 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.89 cum 1061.83 per cum
3 Cost of Stone Aggregate 7.27 cum 649.16 per cum
4 Cost of Bajri 6.61 Cum 744.35 per cum
5 Cost of Boulder 95.76 cum 803.06 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 51.12 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 7.27 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 7.34 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 32.13 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 54.927 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 52.024 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 967.11 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-8 :- Rain Water Harvesting cum Silt Detention Works, Village Thala Lahri (Lakh Choe) Distt. Pathankot.
Est. no. 6881/D.B dated 12.3.2026, Amount 675500/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 240385 419173 -
2 Crate wire Structure 10096 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 266 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 43.37 cum 1070.64 per cum
3 Cost of Stone Aggregate 9.25 cum 657.97 per cum
4 Cost of Bajri 5.81 Cum 753.16 per cum
5 Cost of Boulder 127.72 cum 811.87 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 65.83 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 9.25 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.46 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 41.32 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 74.787 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 62.984 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 975.92 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-9 :- Rain Water Harvesting cum Silt Detention Works, Village Kui (Khab Choe) Distt. Pathankot.
Est. no. 6873/D.B dated 12.03.2026 Amount.536300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 191709 328730 -
2 Crate wire Structure 9963 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 224 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 34.96 cum 1048.61 per cum
3 Cost of Stone Aggregate 7.45 cum 635.94 per cum
4 Cost of Bajri 6.86 Cum 731.13 per cum
5 Cost of Boulder 98.88 cum 789.83 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 52.29 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 7.45 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 7.62 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 33.04 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 56.852 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 52.524 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 953.89 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-10 :- Rain Water Harvesting cum Silt Detention Works, Village Niari (Haler Choe) Distt. Pathankot.
Est. no. 7380/D.B dated 30.03.2026 Amount 489700/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 173236 300752 -
2 Crate wire Structure 9884 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 204.28 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 31.9 cum 1035.41 per cum
3 Cost of Stone Aggregate 6.68 cum 622.74 per cum
4 Cost of Bajri 6.24 Cum 717.93 per cum
5 Cost of Boulder 90.5 cum 776.63 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 45.83 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 6.68 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.93 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 29.61 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 52.659 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 47.607 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 940.69 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-11 :- Rain Water Harvesting cum Silt Detention Works, Village Phagli (Dani Choe) Distt. Pathankot.
Est. no. 7376/D.B dated 30.03.2026 Amount 482100/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 168409 298120 -
2 Crate wire Structure 9726 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 202.88 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 31.68 cum 1008.98 per cum
3 Cost of Stone Aggregate 6.7 cum 596.31 per cum
4 Cost of Bajri 6.22 Cum 691.5 per cum
5 Cost of Boulder 89.69 cum 750.21 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 47.99 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 6.7 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.91 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 29.8 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 51.735 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 47.196 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 914.26 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-12 :- Rain Water Harvesting cum Silt Detention Works, Village Balewa (Balewan Choe) Distt. Pathankot.
Est. no. 6679/D.B dated 02.03.2026 Amount 748500/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 246301 487083 -
2 Crate wire Structure 9237 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 319 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 50.53 cum 827.52 per cum
3 Cost of Stone Aggregate 9.8 cum 514.45 per cum
4 Cost of Bajri 8.65 Cum 610.04 per cum
5 Cost of Boulder 147.25 cum 668.74 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 72.93 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 9.8 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 9.61 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 43.09 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 90.77 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 72.03 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 832.8 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-13 :- Rain Water Harvesting cum Silt Detention Works, Village Phagali Distt. Pathankot.
Est. no. 157/D.B dated 24.04.2026 Amount 747300/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 259870 472101 -
2 Crate wire Structure 9487 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 322 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 50.5 cum 968.68 per cum
3 Cost of Stone Aggregate 11 cum 557.96 per cum
4 Cost of Bajri 10 Cum 652.7 per cum
5 Cost of Boulder 143 cum 711.12 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 77.34 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 11.44 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 11.07 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 49.71 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 80.4 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 51.98 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 874.41 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-14 :- Rain Water Harvesting cum Silt Detention Works, Village Sarti (Bahri Choe) Distt. Pathankot.
Est. no. 161/D.B dated 24.04.2026 Amount 356800/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 124736 215920 -
2 Crate wire Structure 10307 5903 -
COST OF MATERIAL (RWRS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 130 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 22.32 cum 1105.87 per cum
3 Cost of Stone Aggregate 5.8 cum 693.21 per cum
4 Cost of Bajri 1.61 Cum 788.39 per cum
5 Cost of Boulder 65.83 cum 847.1 per cum
COST OF LABOUR (RWRS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 36.21 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 5.8 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 1.79 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 23.09 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 36.75 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm 41.11 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 1011.15 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
FINANCIAL BID E-Tender No. – DSWC/GSP/2025-26/03
All Construction Material as Per PWD Specifications & All Material as Per ISI Standred With The Pre Approval of Departmental Officials
• Rain Water Harvesting cum Silt Detention Works, Village Niari (Bansa Wali Choe), Village Baar Sudal (Bral, Sudal, Brah and Baar Sudal Choe), Village Jalahar, Village Sukret (Sukret Choe), Village Jalahar (Mandir Wali Choe), Village Lehroon (Lehroon Choe). Distt. Pathankot. • Soil Erosion Land Protection Structure (Retaining Wall), Village Thara Jhikla Tikka Doong, Distt. Pathankot. • Soil Erosion Land Protection Structure (Crate Wire & Retaining Wall Structure), Village Ghar Bhangroli. Distt. Pathankot. • Rain Water Harvesting Structure, Village Dhar Khurd (Khurd Choe) Distt. Pathankot. • Soil Erosion Land Protection Structure (Retaining Wall), Village Dunera Tika Nangal, Distt. Pathankot
Name and Address of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs
Quoted by Contractor (As % less of Estimated Amount) Less (-/+%)
WORK-1 :- Rain Water Harvesting cum Silt Detention Works, Village Niari (Bansa Wali Choe) Distt. Pathankot.
Estimate Sanction No. 3847/D.B. Dated 09.09.2025, Amount 724700/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 250791 456779 -
2 Crate wire Structure 9752 5903 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 293 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 46.79 cum 1013.39 per cum
3 Cost of Stone Aggregate 8.43 cum 600.72 per cum
4 Cost of Bajri 7.48 Cum 695.91 per cum
5 Cost of Boulder 139.42 cum 754.61 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 72.25 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 8.43 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 8.33 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 39.77 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 86.98 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 50.619 Sqm 159.08
Crate Wire Structure,
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 918.67 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-2 :- Rain Water Harvesting cum Silt Detention Works, Village Baar Sudal (Bral, Sudal, Brah and Baar Sudal Choe) Distt. Pathankot.
Estimate Sanction No. 14554/D.B. dated 01.09.2025 Amount 2425200/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure-1 241165 406417 -
2 Rain Water Harvesting Structure-2 192530 318550 -
3 Rain Water Harvesting Structure-3 244627 432730 -
4 Rain Water Harvesting Structure-4 244627 432730 -
5 Crate wire Structure 9852 5903 -
COST OF MATERIAL (RWHS)-1
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 257 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 42.05 cum 1114.67 per cum
3 Cost of Stone Aggregate 9.04 cum 702 per cum
4 Cost of Bajri 5.64 Cum 797.19 per cum
5 Cost of Boulder 124.26 cum 855.9 per cum
COST OF LABOUR (RWHS)-1
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 69.23 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 9.04 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 6.27 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 40.24 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 72.727 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 50.984 Sqm 159.08
COST OF MATERIAL (RWHS)-2
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 209 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.58 cum 1114.67 per cum
3 Cost of Stone Aggregate 7.64 cum 702 per cum
4 Cost of Bajri 5.35 Cum 797.19 per cum
5 Cost of Boulder 96.71 cum 855.9 per cum
COST OF LABOUR (RWHS)-2
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 58.09 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 7.64 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 5.94 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 33.36 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 54.562 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 44.343 Sqm 159.08
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 258409 454526 -
2 Crate wire Structure 9859 5903 -
Crate Wire Structure, Village Niari (Choli Choe) Distt. Pathankot.
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 936.28 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-4 :- Rain Water Harvesting Structure, Village Jalahar Distt. Pathankot.
Estimate Sanction No. 932 dated 19.05.2025, Amount 749500/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Wall Painting Total
1 Rain Water Harvesting Structure 262003 472100 -
2 Crate wire Structure 9546 5903 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 322 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 50.5 cum 978.62 per cum
3 Cost of Stone Aggregate 11 cum 567.9 per cum
4 Cost of Bajri 10 Cum 662.64 per cum
5 Cost of Boulder 143 cum 721.07 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 77.34 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 11.44 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 11.07 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 49.71 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 80.4 cum 3486.03
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 51.98 Sqm 159.08
Crate Wire Structure, Village Jalahar Distt. Pathankot.
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 884.35 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-5 :- Rain Water Harvesting Structure, Village Sukret (Sukret Choe) Distt. Pathankot.
Eatimate Sanction No. 2240/D.B. dated 27.06.2025, Amount 748500/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 255059 476295 -
2 Crate wire Structure 9382 5903 -
3 Wall Paiting - - 2000
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 321.16 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 50.17 cum 951.73 per cum
3 Cost of Stone Aggregate 10.14 cum 539.06 per cum
4 Cost of Bajri 9.71 Cum 634.25 per cum
5 Cost of Boulder 143.36 cum 692.95 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 75.5 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 10.14 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 10.79 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 44.42 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 85.91 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 71.68 Sqm 159.08
Crate Wire Structure, Village Sukret (Sukret Choe) Distt. Pathankot.
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 857.01 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-6 :- Rain Water Harvesting Structure, Village Jalahar(Mandir Wali Choe) Distt. Pathankot.
Eastimate Sanction No. 1996/D.B, dated 23.06.2025 Amount 740900/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 259855 463454 -
2 Crate wire Structure 9726 5903 -
3 Wall Painting - - 2000
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 312 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 48.81 cum 1008.98 per cum
3 Cost of Stone Aggregate 9.93 cum 596.31 per cum
4 Cost of Bajri 9.38 Cum 691.5 per cum
5 Cost of Boulder 139.43 cum 750.21 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 74.14 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 9.93 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 10.44 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 43.36 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 83.4 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 71.18 Sqm 159.08
Crate Wire Structure Village Jalahar (Mandir Wali Choe) Distt. Pathankot.
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 914.26 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-7 :- Rain Water Harvesting Structure, Village Lehroon (Lehroon Choe) Distt. Pathankot.
Estimate Saction no. 2000/D.B. dated 23.06.2025 Amount 738700/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 263696 457212 -
2 Crate wire Structure 9937 5903 -
3 Wall Painting - - 2000
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 308 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 48.2 cum 1044.22 per cum
3 Cost of Stone Aggregate 9.92 cum 631.55 per cum
4 Cost of Bajri 9.15 Cum 726.73 per cum
5 Cost of Boulder 137.57 cum 785.44 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 74.07 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 9.92 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 10.17 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 43.38 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 81.68 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 71.73 Sqm 159.08
Crate Wire Structure Village Lehroon (Lehroon Choe) Distt. Pathankot.
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 949.5 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-8 :- Soil Erosion Land Protection Structure -1(Retaining Wall), Village Thara Jhikla Tikka Doong, Distt. Pathankot
Estimate Saction no. 1767/D.B. dated 10.06.2025 Amount 591699/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall Structure1 151013 287344 -
2 Retaining Wall Structure2 53334 100008 -
COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 165 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 28.85 cum 1015.07 per cum
3 Cost of Stone Aggregate 7.13 cum 582.81 per cum
4 Cost of Bajri 0.81 Cum 699.08 per cum
5 Cost of Boulder 91 cum 741.85 per cum
COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 36 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 7.2 cum 1396.94
3 DPC on Top of wall in 1:2;4 0.9 cum 1396.94
4 Square rubble stone masonary 1:5 28.8 cum 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 54 cum 3486.03
Soil Erosion Land Protection Structure -2(Retaining Wall), Village Thara Jhikla Tikka Doong, Distt. Pathankot
COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 59 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 10.32 cum 1015.07 per cum
3 Cost of Stone Aggregate 3.17 cum 582.81 per cum
4 Cost of Bajri 0.45 Cum 699.08 per cum
5 Cost of Boulder 31 cum 741.85 per cum
COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 12 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 3.2 cum 1396.94
3 DPC on Top of wall in 1:2;4 0.5 cum 1396.94
4 Square rubble stone masonary 1:5 8.8 cum 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 19.5 cum 3486.03
Work-9 • Soil Erosion Land Protection Structure (Crate Wire), Village Ghar Bhangroli. Distt. Pathankot.
Estimate Saction no. 1212/D.B. dated 25.05.2025 Amount 439900/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Crate Wire Structure 199609 105236 -
2 Retaining Wall Structure 49342 83775 -
3 Wall Paiting - - 2000
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 135 cum 984.73 per cum
2 Cost of G.I crate wire (including GST) 933.9 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 60 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 424.5 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 424.5 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 135 cum 338.17
Soil Erosion Land Protection Structure (Retaining Wall), Village Ghar Bhangroli. Distt. Pathankot.
COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 52 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 9.02 cum 1079.45 per cum
3 Cost of Stone Aggregate 3.33 cum 666.78 per cum
4 Cost of Bajri 0.48 Cum 761.97 per cum
5 Cost of Boulder 26.1 cum 820.67 per cum
COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 13.44 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 3.36 cum 1396.94
3 Square rubble stone masonary 1:5 below ground Level 10.08 cum 2999.31
4 Square rubble stone masonary 1:5 above Ground Level 13.65 cum 2999.31
5 Square rubble stone masonary 1:5 Above Ground level & Super Structure 0.53 cum 1396.94
WORK-10 :- Rain Water Harvesting Structure, Village Dhar Khurd (Khurd Choe) Distt. Pathankot.
Estimatd Sanctiion No. 2831 Dated 17.07.2025 Amount 512573 /-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Rain Water Harvesting Structure 178349 318542 -
2 Crate wire Structure 9779 5903 -
COST OF MATERIAL (RWHS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 208 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 33.58 cum 1017.79 per cum
3 Cost of Stone Aggregate 7.64 cum 605.12 per cum
4 Cost of Bajri 5.35 Cum 700.31 per cum
5 Cost of Boulder 96.71 cum 759.02 per cum
COST OF LABOUR (RWHS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation of structure 58.06 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:8:16 (CSR No. 10.6a (i)) 7.64 cum 1396.94
3 Cement Concrete on Top of wall in 1:2;4 5.94 cum 1396.94
4 Stone Masonary in 1:5 cs mortar below ground Level 33.36 cum 2999.31
5 Square rubble stone masonary 1:5 cs mortar Above Ground level 54.56 cum 2999.31
6 Plaster Work on side walls of structure in 1:4 thickness mortar 12.5 mm (CSR No. 15.9) 44.34 Sqm 159.08
Crate Wire Structure Village Dhar Khurd (Khurd Choe) Distt. Pathankot.
COST OF MATERIAL (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of stone including royality & carriage upto pucca place (dump site) (size 18-40 kg) 6 cum 923.07 per cum
2 Cost of G.I crate wire (including GST) 59.4 Kg 71.39 per cum
COST OF LABOUR (Crate Wire Structure)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation for bed of wire crate 6 cum 38.98
2 Weaving of wire crate in mesh size 15cmX15cm 27 Sqm 61.1
3 Spreading of wire crate over stone pitching & connecting all sides 27 Sqm 73.75
4 Filling of stones in wire crate by hand packing manual labour 6 cum 338.17
WORK-11 :- Soil Erosion Land Protection Structure (Retaining Wall), Village Dunera Tika Nangal, Distt. Pathankot
Estimatd Sanctiion No. 2825 Dated 17.07.2025 Amount 521274/-
Abstract of Cost
Sr. No. Particulars Cost of Material Cost of Labour Other Expediture Total
1 Retaining Wall Structure1 188012 333262 -
COST OF MATERIAL (RWS)
Sr. No. Particulars Qty Unit Rate Rate unit Amount
1 Cost of Cement including carriage 197 Bags 299.99 per bag with gst
2 Cost of Crushed Sand 34.2 cum 1066.23 per cum
3 Cost of Stone Aggregate 9.5 cum 653.56 per cum
4 Cost of Bajri 1.3 Cum 748.74 per cum
5 Cost of Boulder 105.6 cum 807.45 per cum
COST OF LABOUR (RWS)
Sr. No. Particulars Qty Unit Rate (With GST)) Amount
1 Earthwork in excavation of foundation in masonary land protection structure 48 cum 38.98
2 Laying of stone aggregate in foundation beds in 1:6:12 9.6 cum 1396.94
3 Square rubble stone masonary 1:5 cs mortar Below Ground level 38.4 cum 2999.31
4 Square rubble stone masonary 1:5 cs mortar Above Ground level 57.6 cum 2999.31
5 Cement Concrete on Top of Wall in 1:2:3 1.44 cum 1396.94
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
AppFB.xls
Tender Documents • 0.21 MB
Download all tender documents and submit your bid