Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
27 Aug 2024, 12:00 pmClosed
SE EDC2 MZN
Office of The Superintending Engineer Electricity Distribution Circle-II ParikarmaMarg, Minakshipuram, Muzaffarnagar.U.P.
Work for Prepare New 11 KV Line, EDD Budhana
2024_PVVNL_924317_1
176/2023-24/EDCIIMZN
Open Tender
Electrical Works
Lump-sum
BUDHANA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SEEDC2 MZN
₹4,800
Yes
30 Aug 2024
8 May 2024
27 Aug 2024
8 May 2024
27 Aug 2024
8 May 2024
Amount
Safe cartage of PCC/STP pole With related Instalation centralised Material from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Safly Carage of Rabit/Weasel Conducter from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Safly Carage of Line Item of related work from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Safly Carage of O/G VCB from central store to JE Store/ Work Site (Including Loading, Unloading in all Respect)
Instalation of O/G VCB in Control Rome of S/S (Decentralized Item As Nut Bolt, etc will be provide by Contractor)
Fill O/D & I/D Cable Box in XLPE cable for new Installed VCB.
Digging a pit and instaled PCC/STP Pole in it with Instalation all Line Items and Grouting of Pole Properly. (Decentralized Item As Nut Bolt, Clamp, Stone pad and Material for grouting will be provide by Contractor)
Digging a pit and instaled PCC/STP Pole in it and prepare DP with Instalation all Line Items and Grouting of Pole Properly. (Decentralized Item As Nut Bolt, Dp Clamp, Stone pad and Material for grouting will be provide by Contractor)
Work of Spread Rabit Wire, mounting and tying the wire on the pole with installation of all necessary line Item properly.
Work of Spread Weasel Wire, mounting and tying the wire on the pole with installation of all necessary line Item properly.
Work for Instalation Earthing of Pole as Respo Norms
Work for Instalation of Stay as Respo Norms
Work for Energized New Constructed 11 KV Line with Exited Line.
Placed Dangered Bord on PCC/STP Pole(Decentralized Item As Danger Bord nut bolt wire will be provide by Contractor)
Placed Birbered Wire on PCC/STP Pole(Decentralized Item Birberd wire will be provide by Contractor)
Work of installing 11 KV fuse set on newly constructed double pole as per RESPO norms
Work for Concreting of Stay
Receved Back Weasel Conductor for Site to MZN Store(Including Loading, Unloading in all Respect)
M/s Shanvi Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .