| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹41.0 LAdmitted-Finance | -6.80% | ₹41.0 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified |
| 3 | Rejected-Technical 2ND FLOOR 13 203 SHIV AANGAN BAWADIA KALAN SALAIA BHOPAL MADHYA PRADESH 462039 | BHOPAL | MADHYA PRADESH | 462039 | - | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Not Qualified |
Tender Value
₹44.0 L
EMD Value
₹50,000
Closing Date
10 Jun 2026, 3:00 pmClosed
Chief Engineer
Office of Chief Engineer, Engineering (Civil) Dept., Mormugao Port Authority, SAARASI, Headland Sada, Mormugao, Goa 403804
Annual Maintenance rate contract for General Repairs and maintenance works as and when required for A, B, C and D-Type buildings, Schools, Port Hospital and other Port buildings at Headland for a period of one Year 2026-2027
2026_mptgo_909652_1
CE/32/2026
Open Tender
Civil Works
Percentage
365 days
Headland
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,360
Yes
Mormugao Port Authority, FA and CAO
₹50,000
Yes
29 Jun 2026
21 May 2026
11 Jun 2026
21 May 2026
10 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in dense or hard soil/murrum, soft rock with earth pocket and boulders, Hard rock including removal of obstructions such as small trees, vegetation etc. and removal of excavated material up to a lead of 50m and a lift of 1.5m including refilling foundation trenches. All labour and material etc. complete. | 5 | Cubic metre | 1,188 | ₹5,940 |
| 2 | Earthwork excavation in hard rock, laterite boulders interspersed with murrum etc. including removal of obstruction such as small trees, vegetation etc., refilling the trenches with suitable excavated material or earth removed from nearby areas and removal of unsuitable excavated material up to a lead of 50m and a lift of 1.5 m. All labour and material etc. complete. | 2 | Cubic metre | 3,959 | ₹7,918 |
| 3 | Earth filling in plinth and under flooring with suitable available excavated earth including depositing in layers not exceeding 20 cm., consolidating watering and ramming complete. All labour and material etc. complete. | 2 | Cubic metre | 277 | ₹554 |
| 4 | Dismantling and clearing of cement concrete of waterproofing ..etc. in trap stone metal without causing any damage to the structure, clearing the dismantled materials and stacking within a lead of 100 m including all lift , cleaning surface, etc. as directed. All labour and material, tools & plant etc. complete. | 2 | Cubic metre | 3,864 | ₹7,728 |
| 5 | Demolishing RCC work in trap stone metal including stacking of serviceable material and disposal of unserviceable material within a lead 0f 100m including all tools & plant , labour, material ,providing props ,scaffoldings etc. complete. | 2 | Cubic metre | 3,489 | ₹6,978 |
| 6 | Extra over item of above for cutting of steel in RCC work (sectional area of the RCC work to be measured including all labour, material tools and plant, scaffoldings etc. complete. | 5 | Square metre | 847 | ₹4,235 |
| 7 | Dismantling flooring with stone slab/IPS ..etc. including stacking of serviceable materials and disposal of unserviceable materials at places pointed out within a lead of 100 mts and all lift including all labour and materials , tools and plants etc. complete. | 20 | Square metre | 234 | ₹4,680 |
| 8 | Dismantling flooring tiles laid in cement mortar including stacking of serviceable items & disposal of unserviceable materials within a lead of 100m including all labour & material, tools & plant etc. complete. | 20 | Square metre | 74 | ₹1,480 |
| 9 | Removing existing plaster carefully by Stripping clearing away the same at places pointed out within a lead of 100m, cleaning the surfaces etc. As directed. All labour & material, tools & plant etc. complete. | 50 | Square metre | 72 | ₹3,600 |
| 10 | Exposing existing old & worn out RCC column, beams and slabs etc. up to the main reinforcement carefully by means of chisel and hammer including necessary scaffolding, stacking the same on ground in the compound etc. complete as directed (surface area exposed after final chipping, chiselling etc. will only be measured and paid for). | 20 | Square metre | 226 | ₹4,520 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tender_document.pdf
Tender Documents • 5.54 MB
BOQ_956075.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .