Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAccepted-AOC VILL GANGA SAGAR P O GANGA SAGAR P S SAGAR DIST SOUTH 24 PARGANAS 743373 | GANGA SAGAR | SOUTH 24 PARGANAS | WEST BENGAL | 743373 | ₹5.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.6 LRejected-Finance GANGASAGAR PO SAGAR | ₹5.6 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹5.7 LRejected-Finance GANGASAGAR SAGAR COSTAL SOUTH 24 PARGANAS WEST BENGAL 743373 | GANGASAGAR | SOUTH 24 PARGANAS | WEST BENGAL | 743373 | ₹5.7 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | MS BABUSONA ENTERPRISE H2 | M/S MA BHABANI CONSTRUCTION H1 | B.P. CONSTRUCTION H3 |
|---|---|---|---|---|---|---|
| 1.00N.B:- Quoted Rates are inclusive of GST @ 18% + CESS @ 1% (Only for Hiring ) | ||||||
| 2.00Main Mela Ground Point | ||||||
| 3.00 | Road Transport arrangement (4 Wheeler) charges including driver but excluding the fuel charges for 24 hours under South 24 Pgs. Mechanical Division P.H. Engineering Dte. With effect from 01.12..2025 to 31.01.2026 at Main Mela Ground in Connection with Ganga Sagar Mela, 2026 [ Hiring purpose only ] | 62 | Days | 585 ₹36,270 | 590 ₹36,580 | 578 ₹35,836 |
| 4.00 | Diesel consumption @1 ltr. / 12 km . (considering 62 days running-200 Km /day = 62 days x 200 km = 12400 km= 1033.33 ltr | 1,033.33 | Ltr | 95.2 ₹98,373.02 | 96.1 ₹99,303.01 | 93.5 ₹96,616.36 |
| 5.00 | Mobil consumption @1 ltr. / 500 km . (considering 62 days / running 200 Km per day = 62 days x 200 Km = 12400 Km = 24.8 ltr | 24.8 | Ltr | 325 ₹8,060 | 327 ₹8,109.60 | 318 ₹7,886.40 |
| 6.00Kachuberia Point | ||||||
| 7.00 | Road Transport arrangement (4 Wheeler) charges including driver but excluding the fuel charges for 24 hours under South 24 Pgs. Mechanical Division P.H. Engineering Dte. With effect from 01.12..2025 to 20.01.2026 at Main Mela Ground in Connection with Ganga Sagar Mela, 2026 [ Hiring purpose only ] | 51 | Days | 587 ₹29,937 | 590 ₹30,090 | 578 ₹29,478 |
| 8.00 | Diesel consumption @1 ltr. / 12 km . (considering 62 days running-200 Km /day = 51 days x 200 km = 10200km= 850 ltr | 850 | Ltr | 95.2 ₹80,920 | 97 ₹82,450 | 93.5 ₹79,475 |
| 9.00 | Mobil consumption @1 ltr. / 500 km . (considering 51 days / running 200 Km per day = 51 days x 200 Km = 10200 Km = 20.4 ltr | 20.4 | Ltr | 320 ₹6,528 | 330 ₹6,732 | 318 ₹6,487.20 |
| 10.00Benuban Point | ||||||
Tender Value
Refer Docs
EMD Value
₹11,000
Closing Date
15 Nov 2025, 5:00 pmClosed
Executive Engineer ,SMD , PHED
Chetla , Kolkata-700027
As per NIeT Documents in connection with ganga Sagar Mela 2026
2025_PHED_926245_10
WBPHE/EE/SMD/NIeT-38 of 2025-26
Open Tender
Miscellaneous Works
60 days
Sagar Island, South 24 Pgs
Please refer Tender documents.
7 documents required · 7 mandatory
₹11,000
7 Apr 2026
28 Oct 2025
17 Nov 2025
28 Oct 2025
15 Nov 2025
28 Oct 2025
Amount
Main Mela Ground Point
Road Transport arrangement (4 Wheeler) charges including driver but excluding the fuel charges for 24 hours under South 24 Pgs. Mechanical Division P.H. Engineering Dte. With effect from 01.12..2025 to 31.01.2026 at Main Mela Ground in Connection with Ganga Sagar Mela, 2026 [ Hiring purpose only ]
Diesel consumption @1 ltr. / 12 km . (considering 62 days running-200 Km /day = 62 days x 200 km = 12400 km= 1033.33 ltr
Mobil consumption @1 ltr. / 500 km . (considering 62 days / running 200 Km per day = 62 days x 200 Km = 12400 Km = 24.8 ltr
Kachuberia Point
Road Transport arrangement (4 Wheeler) charges including driver but excluding the fuel charges for 24 hours under South 24 Pgs. Mechanical Division P.H. Engineering Dte. With effect from 01.12..2025 to 20.01.2026 at Main Mela Ground in Connection with Ganga Sagar Mela, 2026 [ Hiring purpose only ]
Diesel consumption @1 ltr. / 12 km . (considering 62 days running-200 Km /day = 51 days x 200 km = 10200km= 850 ltr
Mobil consumption @1 ltr. / 500 km . (considering 51 days / running 200 Km per day = 51 days x 200 Km = 10200 Km = 20.4 ltr
Benuban Point
Road Transport arrangement (4 Wheeler) charges including driver but excluding the fuel charges for 24 hours under South 24 Pgs. Mechanical Division P.H. Engineering Dte. With effect from 01.12..2025 to 20.01.2026 at Main Mela Ground in Connection with Ganga Sagar Mela, 2026 [ Hiring purpose only ]
Diesel consumption @1 ltr. / 12 km . (considering 62 days running-200 Km /day = 51 days x 150 km = 7650km= 637.50 ltr
Mobil consumption @1 ltr. / 500 km . (considering 51 days / running 200 Km per day = 51 days x 150 Km = 7650 Km = 15.3 ltr
Chemaguri Point
Road Transport arrangement (4 Wheeler) charges including driver but excluding the fuel charges for 24 hours under South 24 Pgs. Mechanical Division P.H. Engineering Dte. With effect from 01.12..2025 to 20.01.2026 at Main Mela Ground in Connection with Ganga Sagar Mela, 2026 [ Hiring purpose only ]
Diesel consumption @1 ltr. / 10 km . (considering 62 days running-200 Km /day = 51 days x 150 km = 7650km= 637.50 ltr
Mobil consumption @1 ltr. / 500 km . (considering 51 days / running 200 Km per day = 51 days x 150 Km = 7650 Km = 15.3 ltr
Providing of temporary 100MBPS Internet Connection with quality brand wifi routers of 10nos max including all computer/latops, OFC, CAT_6 etc & smooth running expertized monitoring of connectivity & brand with of the whole system with adequate skilled man power needed in at most visited & important situation for 5 days(w.e.f 12-10-2024 to 16-10-2024) at different building of Ganga Sagar PHE Complex. (1. New Building 2. Urmimala 3. Urmimukhar 4. Taranga 5. Sagar Building 6. Generator Building 7. PSO Building ) works in connection with Ganga Sagar Mela – 2026
Providing Man Power for different work of different purposes such as for GS Mela 2026 and cleaning wahing replacement, etc as and whenever necessary
MS BABUSONA ENTERPRISE (BID ID -7309767)
B.P. CONSTRUCTION (BID ID -7309728)
stage.html
html • 0.05 MB
technical_2189830.pdf
techsummary_2189830.pdf
finance_2189830.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 0.90 MB
BOQ_2189830.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid