Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹27.1 L
EMD Value
₹27,100
Closing Date
21 May 2026, 5:00 pmClosed
Superintending Engineer
O/o SE, U.I. LCD -I, Kusumkhunti, Dist-Kalahandi Pin-766019
Cement Concrete Slope lining and wall lining from RD 300m to 1000m of Jharkundamal Minor.
2026_CEUIP_128900_1
SE, UILCD-I, 02 (30-31)/ 2026-27
Open Tender
Civil Works - Canal
Percentage
240 days
KUSUMKHUNTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹27,100
Yes
20 Aug 2026
7 May 2026
22 May 2026
7 May 2026
21 May 2026
7 May 2026
7 May 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50m outside the periphery of the area, etc. complete as per the direction of the Engineer-in-charge. | 24,000 | Sqm | 2.8 | ₹67,200 |
| - | Earth work excavation of foundation in ordinary soil within 50m initial lead and 1.5m initial lift including dressing and levelling the bed with shoring, shuttering and dewatering if required etc. complete and as per the direction of the Engineer-in-charge. | 851.11 | Cum | 206.1 | ₹1,75,413.77 |
| 3 | Filling in foundation and plinth with sand well watered and rammed below bed including cost, conveyance, royalty, taxes and labour charges etc. complete and as per the direction of the Engineer-in-charge. | 252.75 | Cum | 737.3 | ₹1,86,352.57 |
| 4 | Cement concrete M15 grade with 20mm and down graded hard granite crusher broken chips of approved quality free from skin materials mixing by concrete mixture including hoisting, lowering and laying the concrete in position to proper slope, level and compacting by vibrators in layers not exceeding 0.15m depth and finishing the exposed surface smooth including watering with cost, conveyance, hire and running charges of all machineries, royalty and other taxes of all T &P materials, labour etc. complete and as per the direction of the Engineer-in-charge. | 52.62 | Cum | 5,860.3 | ₹3,08,368.99 |
| 5 | Rigid and smooth centering and shuttering for concrete work and dismantling after casting with cost, conveyance, taxes of all materials and laboor charges etc. complete and as per the direction of the Engineer-in-charge. | 460 | Sqm | 254.5 | ₹1,17,070 |
| 6 | Collecting, conveying, stacking and spreading moorum and consolidation with HRR including watering with cost, conveyance of moorum etc. complete as per the direction of the Engineer-in-charge. | 155.58 | Cum | 1,101.2 | ₹1,71,324.7 |
| 7 | Providing and laying cement concrete M15 grade with 20mm and down graded hard granite coarse aggregate for concrete laying to the bed and slope of canal with sleeper beams, keys etc. in panels including supply of materials, labour and machineries compacting with space vibrator or manually and finishing the concrete surface including trimming and dressing of canal bed and slopes including cutting trenches for sleeper beam, keys and drainage etc. including watering and compaction of slopes and bed with hand rammers to proper profile and supplying and laying polythene film of 100 micron complete and as per the direction of the Engineer-in-charge. | 131.15 | Cum | 6,014 | ₹7,88,736.1 |
| 8 | Filling the foundation & Plinth with excavated materials including watering and ramming etc. complete as directed by the Engineer-in-Charge. | 283.7 | Cum | 114.5 | ₹32,483.65 |
| 9 | Earthwork in ordinary soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-Charge. | 1,443 | Cum | 242 | ₹3,49,206 |
| 10 | Form work for concrete with F1 finishing using steel shutter plates of approved specification for surfaces not prominently or permanently exposed to public view including supply of all materials, T & P, labour and transportation of all materials etc. complete as directed by the Engineer-in-charge. | 451.44 | Sqm | 803.66 | ₹3,62,804.27 |
stage.html
html • 0.04 MB
finance_589977.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.24 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
DTCN30.pdf
Tender Documents • 1.79 MB
BOQ_589977.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .