Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | ₹8.5 L | L1 | Accepted-Finance 1ST |
| 2 | L2₹9.2 L+₹66,564.91 (7.84%)Rejected-Finance 295 BARRACKPORE I G W T P GATE NO 2 J N SINGH ROAD VILLAGE TOWN MONIRAMORE CITY BARRACKPORE NORTH 24 PARGANAS WEST BENGAL 700120 INDIA | 24 PARAGANAS NORTH | WEST BENGAL | 700120 | ₹9.2 L+₹66,564.91 (7.84%) | L2 | Rejected-Finance 2ND |
| 3 | L3₹9.3 L+₹84,055.17 (9.90%)Rejected-Finance | ₹9.3 L+₹84,055.17 (9.90%) | L3 | Rejected-Finance 3RD |
Tender Value
₹8.5 L
EMD Value
₹18,000
Closing Date
31 Jan 2026, 11:00 amClosed
DG CIVIL
OFFICE DG CIVIL THE KOLKATA MUNICIPAL CORPORATION 5 S.N. BANERJEE ROAD KOLKATA 700013
EPAIRING OF ROAD FROM 43/20 C.N ROY RD TO 138 P.G RD and 43 E C.N ROY RD TO 44/4A/3 C.N ROY RD IN WARD-66
2026_KMC_992139_1
KMC/VII/066/39/2025-2026/R
Open Tender
CIVIL WORKS
Percentage
75 days
WARD-66
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹18,000
11 Jul 2026
24 Jan 2026
2 Feb 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)
Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time
Lowering cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm depth with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils.
(23)Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.) ii) 25 mT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover : 680 mm. X 90 mm. Frame : 800 mm. X 165 mm. Opening : 500 mm. Weight : 196 Kg. (approx.)
(23)Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.)x) 5 mT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 470 mm. X 420 mm. X 80 mm. Frame : 590 mm. X 550 mm. X 170 mm. Opening : 380 mm. X 305 mm. Weight : 100 Kg. (approx.)
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone.
Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone.
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb
Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion. ( 3rd Corrigenda & addenda dated 04.06.2018)
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil
CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.29Hire charges for engaging Air Compressor machine with minimum pressure capacity of 5.0 Kg/sq.cm arrangement including all necessary equipments and operating staff, carriage, fuel, Tools and plants all complete for cutting Road / hard crust cutting with pneumatic hammer at desired point in water supply works as per direction of EIC . a) With Pneumatic hammers For minimum engagement of 8 hrs. In a day
Sub Total
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.28 MB
BOQ_2425937.xls
BOQ • 0.32 MB
T.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .