Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.2 CrAdmitted-Finance | -1.26% | ₹37.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹41.1 Cr+₹3.9 Cr (10.4%)Admitted-Finance | +8.97% | ₹41.1 Cr+₹3.9 Cr (10.4%) | L2 | Admitted-Finance |
Tender Value
₹37.7 Cr
EMD Value
₹75.4 L
Closing Date
8 Aug 2023, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Widening and Strengthening of Sagwara Goreshwar Diwada Silohi Gada Jasrajpur Badgi Galiyakot Road
2023_RSRDC_350339_1
RSRDC NIT NO.259/2023-24 DATED 11.07.2023
Open Tender
Civil Works - Roads
Percentage
300 days
Sagwara Goreshwar Diwada Silohi Gada Jasrajpur Bad
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹11,800
PD RSRDC UNIT UDAIPUR THROUGH NEFT/RTGS/IMPS/BG
₹75.4 L
PD RSRDC UNIT UDAIPUR
11 Aug 2023
13 Jul 2023
10 Aug 2023
13 Jul 2023
8 Aug 2023
25 Jul 2023
24 Jul 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART -" A" - EARTH WORK
Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Light Jungle | 10.91 | P.Hect. | 17,206 | ₹1,87,717.46 |
| 2 | Dismantling of flexible pavements and disposal of dismantled Materials upto a lead of 1000 mtrs. Stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) BY MECHANICAL MEANS Bituminous Courses | 2,804.5 | P.cum | 165 | ₹4,62,742.5 |
| 3 | Earthwork in excavation for roadway in soil, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 69,982.5 | P.Cum | 26 | ₹18,19,545 |
| 4 | Earthwork in excavation in ordinary rock, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). By Hydraulic Excavator CK-90 of 0.9 cum bucket capacity and tipper with disposal upto 1000 mtrs. | 18,662 | P.Cum | 34 | ₹6,34,508 |
| 5 | Earthwork in excavation for roadway in hard rock, including stacking / disposal of surplus Material exclusive of compensation of earth (MoRTH specification : clause 301 to 305). Blasting prohibited By Mechanical Means | 67,919.13 | P.Cum | 309 | ₹2,09,87,011.17 |
| 6 | Carriage of sand bajri, ballast, stone, boulders, kankar and gravelly Material including loading and unloading stacking etc. complete. [MoRTH specification : 514.5 Table 500.28] For each subsequent km lead beyond 1 km upto 10 km | 8,000 | P.Cum | 2.65 | ₹21,200 |
| 7 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 1,21,290.34 | P.Cum | 52 | ₹63,07,097.68 |
| 8 | Construction of embankment with approved Materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted by vibratory roller 8-10 tonne to meet requirement of Tale 300-2 as per MoRTH specification : Clause No. 305 | 93,310 | P.Cum | 19 | ₹17,72,890 |
| 9 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | 21,290.64 | P.Cum | 54 | ₹11,49,694.56 |
| 10 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock pilling at designated locations and disposal of dismantled Materials upto a lead of 1000 mtrs. stacking serviceable and unserviceable Materials separately. (MoRTH specification : Clause 202) | 581.25 | P.Cum | 789 | ₹4,58,606.25 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.29 MB
circular061021.pdf
Tender Documents • 0.50 MB
NotificationofGST.pdf
Tender Documents • 0.91 MB
OfficeorderPWDdated14122021.pdf
Tender Documents • 0.09 MB
circular07032022.pdf
Tender Documents • 0.18 MB
circularofJV06062023.pdf
Tender Documents • 0.23 MB
DLPOfficeorder05012021.pdf
Tender Documents • 0.10 MB
Engineerscost_12072023.pdf
Tender Documents • 0.02 MB
Rs1000StampFeeforaffidavit.pdf
Tender Documents • 0.21 MB
SBD.pdf
Tender Documents • 0.95 MB
SpecialConditionSagwaraRoad.pdf
Tender Documents • 0.13 MB
Stampdutycircular.pdf
Tender Documents • 0.05 MB
AnnexureABCD_RTPPAct2012_AnnexureC.pdf
Tender Documents • 0.10 MB
UnbalancedBidNotification22102021.pdf
Tender Documents • 0.12 MB
BankdetailsIDBIBankSagwaraRoad.pdf
Tender Documents • 0.06 MB
BOQ_623015.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .