Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.6 LAccepted-Finance 6 3 EAST PHOOL BAGAN KOLKATA KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | ₹22.6 L | L1 | Accepted-Finance 1ST |
| 2 | L2₹23.3 L+₹75,850 (3.36%)Accepted-Finance | ₹23.3 L+₹75,850 (3.36%) | L2 | Accepted-Finance 2ND |
| 3 | L3₹24.4 L+₹1.8 L (8.10%)Rejected-Finance | ₹24.4 L+₹1.8 L (8.10%) | L3 | Rejected-Finance 3RD |
Tender Value
₹22.6 L
EMD Value
₹46,000
Closing Date
13 Jun 2026, 11:00 amClosed
DG CIVIL
OFFICE OF DG CIVIL THE KOLKATA MUNICIPAL CORPORATION 5 S.N. BANBERJEE ROAD KOLKATA 700013
RESTORATION OF ROAD DUE TO COLLAPSE OF SEWER LINE WORK AT BELIAGHATA ROAD IN WARD NO-36,BR-V
2026_KMC_1025302_1
KMC/DG(C)/Br-V/ 036/31/2025-2026
Open Tender
CIVIL WORKS
Percentage
60 days
WARD NO-36, BR-V
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹46,000
23 Jun 2026
23 May 2026
15 Jun 2026
23 May 2026
13 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( 3rd Corrigenda & addenda dated 04.06.2018) | 1,401.13 | SQM | 361 | ₹5,05,807.93 |
| 2 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 1,401.13 | SQM | 14.4 | ₹20,176.27 |
| 3 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.(b) For each additional Depth of 150mm and part thereof. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 3.16 Page No.240) | 4,203.39 | SQM | 19 | ₹79,864.41 |
| 4 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019) | 420.34 | %M3 | 1,317.14 | ₹5,53,645.31 |
| 5 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 2,802.26 | SQM | 188.23 | ₹5,27,469.4 |
| 6 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 1,401.13 | SQM | 11.07 | ₹15,510.51 |
| 7 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time | 700.56 | SQM | 41 | ₹28,722.96 |
| 8 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time | 700.57 | SQM | 45 | ₹31,525.43 |
| 9 | Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. | 791.64 | M3 | 166 | ₹1,31,411.98 |
| 131 | Estimated amount | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
TENDER.pdf
Tender Documents • 0.55 MB
BOQ_2519503.xls
BOQ • 0.30 MB
ROAD.pdf
Additional Documents • 5.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .