Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
18 Sept 2026, 5:00 pmClosed
Chief Construction Engineer, R.W.Circle, Bolangir
RURAL WORKS CIRCLE , BOLANGIR
Construction of Bolangir Rural Works Division Building in the district of Bolangir for the year 2025-26
2026_CERWI_139786_1
BLGR-Online-19/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Balangir
3 documents required · 3 mandatory
₹10,000
₹1.4 L
Yes
19 Sept 2026
31 Aug 2026
19 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
31 Aug 2026 - 17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diluting and injecting chemical emulsion (to be supplied free of cost at site of work) for PRE CONSTRUCTIONAL Anti-termite treatment and creating a continuous chemical barrier under and all-round the column pits, wall trenches, basement excavation, top perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surroundings of pipes and conduits etc. complete as per specifications (plinth area of the building at ground floor only shall be measured for payment) including cost of all materials, labour, T&P etc complete in all respect and as per direction of the Engineer-in-charge. / Ground Floor | 243 | sqm | 104.5 | ₹25,393.5 |
| 2 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. / Ground Floor | 352.45 | cum | 282.9 | ₹99,708.11 |
| 3 | Drain | 42.19 | cum | 282.9 | ₹11,934.84 |
| 4 | Internal Road | 117.8 | cum | 282.9 | ₹33,325.62 |
| 5 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge / Ground Floor | 549.31 | cum | 662 | ₹3,63,643.22 |
| 6 | Drain | 5.63 | cum | 662 | ₹3,723.75 |
| 7 | Internal Road | 58.9 | cum | 662 | ₹38,991.8 |
| 8 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete and as directed by E.I.C. / Ground Floor | 27.72 | cum | 5,936.4 | ₹1,64,557.01 |
| 9 | Plain cement concrete (1:2:4) using 12mm size black hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete in layers, watering, curing etc. complete including cost, conveyance, royalties and taxes of all materials with labour,labour cess and T&P etc. required for the work complete as per the direction of the Engineer-in-charge. / Ground Floor | 28.59 | cum | 7,526.5 | ₹2,15,182.64 |
| 10 | Providing and lying plain cement concrete of proportion (1:4:8) in foundation and floors using Portland slag cement (PSC) with 40 mm. Size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm thick in each layer including cost, conveyance, loading, unloading, royalties and taxes all materials and cost all labours, sundries, T & P required for the work including shoring, shuttering and dewatering if required including hire & running charges of water pump complete as per the instruction of the Engineer-in-Charge. | 8.44 | cum | 5,576.3 | ₹47,050.03 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 7.19 MB
Tendernotice_1.pdf
PDF • 3.63 MB
BOQ_607668.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .