Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.6 L+₹4,166.60 (0.75%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹5.8 L+₹21,818.45 (3.92%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S.R Construction L3 | Ganesan S L2 | Suriyakala S L1 |
|---|---|---|---|---|---|---|
| 1.00Part.1Construction of Mini Community Sanitary Complex at Thirumanur Primary Health Centre in Thirumanur Panchayat | ||||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete. | 14.8 | Cu.m | 255 ₹3,774 | 250 ₹3,700 | 230 ₹3,404 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers | 3.73 | Cu.m | 2,125 ₹7,926.25 | 2,100 ₹7,833 | 260 ₹969.8 Lowest |
| 4.00 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 4.25 | Cu.m | 5,750 ₹24,437.5 | 5,700 ₹24,225 | 5,200 ₹22,100 Lowest |
| 5.00Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | ||||||
| 5.10 | Above | 4.82 | Cu.m | 6,150 ₹29,643 | 6,100 ₹29,402 | 1,800 ₹8,676 Lowest |
| 5.20 | Below | 11.91 | Cu.m | 6,150 ₹73,246.5 | 6,100 ₹72,651 | 1,500 ₹17,865 Lowest |
| 6.00Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | ||||||
| 6.10 | Above Basement | 29.66 | Sq.m | 535 ₹15,868.1 | 530 ₹15,719.8 | 450 ₹13,347 Lowest |
| 6.20 | Below Basement | 20.31 | Sq.m | 535 ₹10,865.85 | 530 ₹10,764.3 | 450 ₹9,139.5 Lowest |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
23 Sept 2026, 3:00 pmClosed
Block Development Officer (V.Pt)
Block Development office, Thirumanur
Construction of Mini Community Sanitary Complex at Thirumanur Primary Health Centre in Thirumanur Panchayat in Ariyalur District
2026_RDTN_703344_1
R.C.No. B4/1487/2026
Open Tender
Civil Works - Buildings
Works
Panchayat Union, Thirumanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,920
Yes
24 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
23 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part.1Construction of Mini Community Sanitary Complex at Thirumanur Primary Health Centre in Thirumanur Panchayat | |||||
| 2 | Earth work excavation and depositing on bank with in initial lead lift in hard gravelly soil for foundation etc. complete. | 14.8 | Cu.m | - | - |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers | 3.73 | Cu.m | - | - |
| 4 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance of all materials to site and all labour charges etc complete. | 4.25 | Cu.m | - | - |
| 5Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | |||||
| 5.1 | Above | 4.82 | Cu.m | - | - |
| 5.2 | Below | 11.91 | Cu.m | - | - |
| 6Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center | |||||
| 6.1 | Above Basement | 29.66 | Sq.m | - | - |
| 6.2 | Below Basement | 20.31 | Sq.m | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
TB.pdf
Tender Documents • 0.88 MB
PB.pdf
Tender Documents • 0.56 MB
BOQ_845430.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .