| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC | L1 | Accepted-AOC Lowest Tenderer | |
| 2 | L2₹12.9 L+₹2.6 L (24.6%)Rejected-Finance 73 5 NANAK NAGAR JAMMU 180004 J K | JAMMU | JAMMU | J K | 180004 | L2 | Rejected-Finance Other than Lowest Tenderer | |
| 3 | L3₹13.5 L+₹3.1 L (29.9%)Rejected-Finance | L3 | Rejected-Finance Other than Lowest Tenderer | |
| 4 | L4₹14.9 L+₹4.5 L (43.5%)Rejected-Finance | L4 | Rejected-Finance Other than Lowest Tenderer | |
| 5 | L5₹15.3 L+₹5.0 L (47.8%)Rejected-Finance | L5 | Rejected-Finance Other than Lowest Tenderer |
Tender Value
Refer Docs
EMD Value
₹50,700
Closing Date
27 May 2021, 6:00 pmClosed
GE NAGROTA
GE NAGROTA C/O 56 APO
MANNING AND OPERATION OF DG SET INSTALLATION UNDER GE NAGROTA.
2021_MES_438480_1
GEN-03/2021-22
Open Tender
Miscellaneous Works
Item Rate
334 days
NAGROTA
Class D and above and category d (v)
8 documents required · 8 mandatory
₹500
GE NAGROTA
₹50,700
Yes
25 Jun 2021
26 Apr 2021
29 May 2021
26 Apr 2021
27 May 2021
12 May 2021
Amount
Manning and Operation for 01 FGM per shift of DG set installation at 4 ASD for operating DG set required as per site and DG set each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs (iii) IIIrd shift 2200 hrs to 0600 Hrs
Manning and Operation for 01 FGM per shift of DG set installation at Ops room for operating DG set required as per site and DG set each shift of 8 hours including sundays and holidays by employing the manpower as mentiond for entire system comprising of the following and cleaning of entire installtion and surrounding area as directed by Engr-In-charge. Note:- Shift timings are as under:- (i) Ist shift 0600 hrs to 1400 Hrs (ii) IInd shift 1400 hrs to 2200 Hrs (iii) IIIrd shift 2200 hrs to 0600 Hrs
Manning and Operation for 01 FGM per shift of DG set installation signal centre for operation DG sets required as per site and DG set each shift of 08 hrs including sundays and holidays complete all as specified and as directed by Engr-In-Charge. Note:- Shift timings are as under:- (i) Ist shift: 0600 hrs to 1400 Hrs (ii) 2nd shift: 1400 hrs to 2200 Hrs (iii) IIIrd shift: 2200 hrs to 0600 Hrs
Note:- Applicable for items No 01 to 3 (a) The quoted rate shall be demed to inclusive the followings operation. (i). Preventive and breakdown maintenance of all the equipments by regular oiling, changing of gland packing, replacement of nuts and bolts etc during the period of work order. (ii). To take care of house keeping and environment cleanliness, area upto 5 m all around the installation shall be kept absoultely neat and clean. (iii). Provisioning stationary, safety equipments, tools testing equipments, maintaining all records, log sheets deemend to be included in the rate quoted. (iv). The contractor has to supply uniform to their employee for wearing during the working hours. The unit rate is deemed to be included Uniform shall be blue colour pant and shirt with " GE Nagrota" written on back of shirt and on pocket. The pattern of the uniform shall be as decided by Engr-In Charge.
(v). The rate qouted is deemed to be inclusive of providing moblie communication system to the operator detailed so that feed back can be obtained. (vi). The satety precuations for the operator will be the responsibility of the contractor & unit rate is deemed to included for the safety equipments. (vii). The rate quoted is deemed to be inclusive of the cost of T&P for maint work. (viii). To Maintain all the isntallation provided under this contract as per IE rule/Standard engineering practice. (ix). Minor repairs to gaskets, rewireable fuses and operation maint of any other parts required for proper functioning of installation. (x). The sludge generated by the DG set will be disposed by the operator as per insturcitons of the Engr-IN-Charge/JE. (XI). Testing of effluent quality parameters shall be carried out by the contactor and cost of these testing chagres shall borne by the contractor. (b). The quoted rate shall not be deemed to inclusive the following operation (i). Mixing/ dosing /adding of oil grease required for operation of the DG set. However Engine oil,grease and fuel will be measured & paid separately under respetive items here-in-after item of this schedule.
Allied Technologies
Nitika electricals and engineers works
J S ENGINEERS
Skyline Encon
M/S J N TRADERS
Sarbat Construction Co
Kalsi Engineers and contractors
M/S MANJIT SINGH AND SONS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .