| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 CrAccepted-AOC NA | ₹13.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹14.6 Cr+₹1.2 Cr (8.91%)Rejected-Finance | ₹14.6 Cr+₹1.2 Cr (8.91%) | L2 | Rejected-Finance REJECTED |
| 3 | L3₹14.6 Cr+₹1.2 Cr (9.00%)Rejected-Finance | ₹14.6 Cr+₹1.2 Cr (9.00%) | L3 | Rejected-Finance REJECTED |
| 4 | L4₹14.7 Cr+₹1.2 Cr (9.31%)Rejected-Finance | ₹14.7 Cr+₹1.2 Cr (9.31%) | L4 | Rejected-Finance REJECTED |
| 5 | L5₹14.9 Cr+₹1.5 Cr (11.2%)Rejected-Finance H NO 122 AMBIKA VIHAR POONCH HOUSE TALAB TILLO JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | ₹14.9 Cr+₹1.5 Cr (11.2%) | L5 | Rejected-Finance REJECTED |
Tender Value
₹22.5 Cr
EMD Value
₹45.1 L
Closing Date
9 Sept 2025, 5:00 pmClosed
Chief Engineer PMGSY (JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1st Floor, Mechanical Engineering Department (MED) Complex University Road Jammu
Construction and Maintenance of Road from L021-(Link Road) Bari to Seote via Kamlari,Package No. JK04-4009, PMGSY-IV, Batch-I of 2025-26, Block- Marmat, District Doda. (Using Waste Plastic) Length-8.000 Kms
2025_JKRRD_143907_1
JK044009
Open Tender
Civil Works - Roads
Percentage
600 days
Marmat
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹45.1 L
Office of The Chief Engineer PMGSY (JKRRDA) Jammu
21 Jan 2026
11 Aug 2025
11 Sept 2025
11 Aug 2025
9 Sept 2025
14 Aug 2025
13 Aug 2025 - 14 Aug 2025
13 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kind of soil by manual/mechanical means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/wedging out rock (where blasting is prohibited) and their intermediate classification of soil, setting out true to the required lines, grades, width cutting and trimming of side slopes to level as shown in the drawing and as directed by engineer-in-charge at site according to the MORD technical specification section 300 and 1600 and sorting out useful materials and stacking the same in all leads, lifts in acquired width of road and transportation of un-useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material to the approved dumping sites through all modes of transportation including head load or animal transport or mechanical means along with its leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. | 1,65,100 | Cum | 302.07 | ₹4,98,71,757 |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 5,820 | Cum | 77.14 | ₹4,48,954.8 |
| 3 | Berm Filling: Construction of earthen shoulders using approved material deposited at site from roadway cutting and excavation from drains and foundations of other structures, properly graded and compacted to meet the requirements of Tables 300.1 and 300.2, as per Technical Specification Clause 301.5 including all lead, lifts, carriages of materials by MT loading and unloading complete. | 8,190 | Cum | 77.14 | ₹6,31,776.6 |
| 4 | Compacting original ground Supporting Sub Grade by Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2. | 7,923 | Cum | 71.19 | ₹5,64,038.37 |
| 5 | Construction of Granular Sub-Base by providing Well Graded Material,(Table 400.1) spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. including all leads , lifts, carriages of materials by MT, loading and Un-loading complete for Grading-I material. | 10,906.6 | Cum | 1,959.24 | ₹2,13,68,646.98 |
| 6 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. | 2,532.96 | Cum | 2,341.45 | ₹59,30,799.19 |
| 7 | Providing and applying Primer Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 Kg/Sqm using mechanical means as per technical specification clause 502 including all leads, lifts, carriages of materials by MT, loading and unloading complete. (Low Porosity) | 32,187.57 | Sqm | 82.73 | ₹26,62,877.67 |
| 8 | Providing and applying Tack Coat Bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.20 to 0.25 Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specifications clause 503 including all leads, lifts, carriages of materials by MT, loading and unloading complete. | 32,187.57 | Sqm | 18.42 | ₹5,92,895.04 |
| 9 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. including all leads, lifts, carriages of materials by MT loading and un-loading complete. | 1,623.25 | Cum | 8,243.95 | ₹1,33,81,991.84 |
| 10 | Providing and laying Bituminous concrete (30mm thickness) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(including seal coat) | 973.95 | Cum | 11,345.67 | ₹1,10,50,115.3 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 8.29 MB
BOQ_223129.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .