| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹18.5 L+₹2,151.50 (0.12%)Rejected-Finance BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.0 L+₹1.6 L (8.62%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹24.2 L
EMD Value
₹48,000
Closing Date
17 Feb 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.E. M.G.C.C.D-5, Bijnor
E.E. M.G.C.C.D-5, Bijnor
Restoration of protection works of V.R.B. at km. 21.304 of M.G.C. Stage-Ist.(Lot-12)
2023_UPIDC_764774_34
05/EE/2022-23
Open Tender
Civil Works - Bridges
Item Wise
90 days
Bairaj Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹48,000
27 Mar 2023
7 Feb 2023
17 Feb 2023
7 Feb 2023
17 Feb 2023
7 Feb 2023
Amount
Earthwork in excavation in Main canal in ordinary soil including lift upto 1.5 M & lead upto 30M , ramming, dressing the surface to the required level, slopes. Excavated earth to be used in filling in dipression/cunnet within 30 M distance as directed by Engineer-in-Charge.
First Class Brick Work in 1:5 Cement Mortar including all cost of material, labour , T&P etc. for completion of work .
Laying C.C. 1:3:6 using size 4-20 mm graded Crushed Aggregate including all cost of material, labour , T&P etc. for completion of work .
Supplying and packing of boulder (20 to 40 kg wt.) in scour portion of canal bed (under V.R.B) including cost of all material, labour and T&P etc. all complete.
Laying flat brick pitching in 1:4 cement sand mortar including all cost of all material, labour and T&P etc. all complete.
Cement pointing in 1:3 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
Laying brick on edge soling laid dry filling joints including preparation of base to proper slope and its ramming including all cost of material, labour and T&P etc. required for proper completion of work.
12 mm Thick Cement Plaster 1:4 C.M. on Brick Masonary including cost of all material, labour and T&P etc. all complete.
Applying two coat synthetic enamel paint of approved quality on steel old surface i/c all cost of materials, labour and T&P etc complete.
Applying two coat of snowcem /water proof cement paint on old surface i/c Scraping,all cost of materials labour and T&P etc. complete.
0.30 M wide Gauges Painting in two coats with cost of all material, labour and T&P etc. all complete.
Writing Letter up to height 10 cm with cost of all material, labour and T&P etc. all complete.
MANOJ CHAUDHARY
gopi construction
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .