| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-Finance | L1 | Accepted-Finance found correct | |
| 2 | L2₹2.6 L+₹10,364.59 (4.10%)Accepted-Finance | L2 | Accepted-Finance found correct | |
| 3 | L3₹2.9 L+₹33,443.46 (13.2%)Accepted-Finance GOVT CONTRACTOR VPO DHASOLI TEHSIL JAWALI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | L3 | Accepted-Finance found correct | |
| 4 | L4₹3.1 L+₹59,018.07 (23.3%)Accepted-Finance | L4 | Accepted-Finance found correct | |
| 5 | L5₹3.1 L+₹61,243.87 (24.2%)Accepted-Finance | L5 | Accepted-Finance found correct |
Tender Value
₹3.7 L
EMD Value
₹7,400
Closing Date
29 Nov 2022, 6:00 pmClosed
DFO Ramban
Forest Complex Ramban near BVM School
BOQ
2022_FD_196714_1
enit 80 of 2022-23
Open Tender
Agricultural or Forestry
Item Wise
30 days
In Gool Co.33/AR, Co.34/Ar, Co. 57/AR, and Co.58/AR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
DFO Ramban
₹7,400
6 Dec 2022
19 Nov 2022
30 Nov 2022
19 Nov 2022
29 Nov 2022
19 Nov 2022
Amount
Construction of Pond at Co.33/AR Gool from S.No 1 to 3 Clearind jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removel of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechnical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc. not exceeding 10 Sqm in width) and for shafts, wells, cesspits and the like not exceedinng 10 Sqm on plan, including dressing of sides and ramming of bathrooms lift upto 1.5m, including getting out excavated earth and dispoosal of surplus excavated earth as directed, within a lead of 50 meters:All kinds of Soil Including all charges
Extra for Compactaton of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density).
Construction of Pond at Co.34/AR Tungali from S.No 4 to 6 Clearind jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removel of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechnical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc. not exceeding 10 Sqm in width) and for shafts, wells, cesspits and the like not exceedinng 10 Sqm on plan, including dressing of sides and ramming of bathrooms lift upto 1.5m, including getting out excavated earth and dispoosal of surplus excavated earth as directed, within a lead of 50 meters:All kinds of Soil Including all charges
Extra Compactaton of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density).
Construction of Pond at Co.57/AR Dagantop from S.No 7 to 9 Clearind jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removel of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechnical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc. not exceeding 10 Sqm in width) and for shafts, wells, cesspits and the like not exceedinng 10 Sqm on plan, including dressing of sides and ramming of bathrooms lift upto 1.5m, including getting out excavated earth and dispoosal of surplus excavated earth as directed, within a lead of 50 meters:All kinds of Soil Including all charges
Extra Compactaton of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density).
Construction of Pond at Co.58/AR Dagantop from S.No 10 to 12 Clearind jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1 m above ground level and removel of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechnical means (hydraulic excavator) in trenches for foundations, drains, pipes,cables etc. not exceeding 10 Sqm in width) and for shafts, wells, cesspits and the like not exceedinng 10 Sqm on plan, including dressing of sides and ramming of bathrooms lift upto 1.5m, including getting out excavated earth and dispoosal of surplus excavated earth as directed, within a lead of 50 meters:All kinds of Soil Including all charges
Extra Compactaton of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density).
BASHIR AHMED
sushil kumar
GULZAR AHMED TRAGWAL
bhumeshwar gouria
Kishori Lal
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .