Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹11.4 L
EMD Value
₹11,400
Closing Date
3 May 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
WORK TENDER
2023_UPTCL_798029_1
ETC MU T 06 2023 24
Open Tender
Electrical Works
Item Rate
60 days
SHAMLI SHYAMLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD MUZAFFARNAGAR
₹11,400
14 Jun 2023
19 Apr 2023
4 May 2023
19 Apr 2023
3 May 2023
19 Apr 2023
Amount
Shifting/ Dragging of oil filled 40 MVA T/F (OLD) of GEC MAKE AT 132KV S/S Jasala from existing place to near loading place distance up to 20 mtr at 132 KV Sub-Station Jasala.
SHIFT UPTO 20M,40MVA,132/33KV TRANSFORMER
Addition shifting 01 job for every 5 mtr.
ADDITIONAL SHIFTING OF 5M A PART THEROF20M,40MVA,132/33KV TRANSFORMER
Packing of HV bushing of 40 MVA T/F (OLD) of GEC MAKE AT 132KV S/S Jasala
PACKING OF T/F BUSHING 145KV
Packing of LV/NUETRAL bushing of 40 MVA T/F (OLD) of GEC MAKE AT 132KV S/S Jasala
PACKING OF T/F BUSHING 33KV
Loading of 40 MVA T/F (OLD) of GEC MAKE Main tank along with accessories, making the wooden sleeper plate from jacking the T/F tank up to trailer height placing the rail under T/F tank and shifted up on trailer, removed the rail under T/F tank and proper tightening the main tank with trailer with the help of steel rope and turn buckle.
LOADING FROM WAGON 40MVA 132/33KV TRANSFORMER
Carriage of 40 MVA T/F (OLD) of GEC MAKE tank from 132KV Sub-Station Jasala To 132 KV Shamli Shyamla along with all accessories by Pvt. Truck / Trailer. Distance upto 50 Km.
CARRY 40MVA 132/33KV TRANSFORMER<200KMS
Unloading of main tank of 40 MVA T/F (OLD) of GEC MAKE loaded on Trailer , jacking the tank for placing the rail under the T/F tank and shifting it to plinth, Removing the rail under the T/F tank on wooden sleeper, lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 40 MVA T/F like oil filled drums, bushings, conservator tank, cooling fans,radiator etc. from Truck/ Trailer at 132 KV substation Shamli Shyamla.
UNLOADING,TRANSFORMER
Drain out of T/F oil of conservator in empty oil drums and then dismantling of 20MVA T/F-I. Works includes Opening of jumpers of HV/LV side, removal of earthing strips from neutral bushings and transformer body, dismantling of 20 MVA T/F-I & its accessories including radiator HV/LV, turret HV/LV, neutral bushing, buchholz relay, oil pipe lines to conservator tank to main tank, oil pipe lines to OLTC and oil surge relay, conservator tank.
DISMANTLING OF 20MVA,132/33KV TRANSFORMER
Packing of HV bushing of dismantled 20 MVA 132/33 KV T/F-II in empty carets of old 40 MVA T/F.
PACKING OF T/F BUSHING 145KV
Packing of LV/NUETRAL bushing of dismantled 20 MVA 132/33 KV T/F-I in empty carets of old 40 MVA T/F.
PACKING OF T/F BUSHING 33KV
Shifting/Dragging of TAL make 20 MVA T/F-I from its plinth to near open space (Distance about 20 Mtr.) including turning of main tank up to required angle.
SHIFT UPTO 20M,20MVA,132/33KV TRANSFORMER
(a) additional shifting 01 job for every 5 Mtr.
ADDITIONAL SHIFTING OF 5M A PART THEROF20M,20MVA,132/33KV TRANSFORMER
Shifting/Dragging of oil filled 40 MVA T/F (OLD) of GEC MAKE from unloading place to T/F plinth (Distance up to 20 Mtr.)
SHIFT UPTO 20M,40MVA,132/33KV TRANSFORMER
(a) additional shifting 01 job for every 5 Mtr
ADDITIONAL SHIFTING OF 5M A PART THEROF20M,40MVA,132/33KV TRANSFORMER
Complete erection of 40 MVA T/F (OLD) of GEC MAKE by erection of radiator, conservator tank, bushing with its turrets, connecting all oil pipe lines, erection of cooling fans, etc. for completing conservator tank and all other associated works for completion of job.
ERECTION OF 40 MVA,132/33KV TRANSFORMER
Centrifusing of Complete T/F oil (approx., 20 KL) in T/F tank through private centrifusing machine.Work includes connection of centrifusing pipes to T/F inlet and outlet valve and then circulating the T/F oil through whole body, radiators, OLTC tank and through conservator by maintaining proper heating temperature to achieve required value of BDV & ppm and also recording of values periodically.
CENTRIFUGING 40 MVA,132/33KV TRANSFORMER
Earthing of Main Tank at two designated points & neutral bushing of HV & LV side of 40 MVA T/F by using MS Flat 50x6/75x10 mm size its jointing with already laid earth mat/Deltas neutral bushing support for its earthing work.
EARTHING OF T/F BODY,NEUTRAL BUSHING ,RADIATOR BANK STRUCTURE,COOLING FAN ,MARSHALLING BOX, DRIVING MECHANISM BOX OLTC AND RTCC PANEL AT TWO POINTS USING 75X10, 50X6MM MS FLAT AND 40 MM MS ROD INCLUDING THE COST MS FLAT AND ROD
Electrical Connection of 40MVA T/F with laying of cable and termination in between WTI,OTI Buchholtz relay, cooling fans with marshalling box etc. with proper ferruling as per cable schedule.
CABLE CONNECTION OF MOM/MARSHALLING BOX.
Jumpering of T/F from HV side with single moose/zebra/panther.
JUMPERING,BAY,T/F,132KV,INCL DISM/IF,REQ
Jumpering of T/F from LV side with double zebra/moose/panther complete up to 33 KV main bus.
JUMPERING,BAY,T/F,33KV,INCL DISM/IF,REQ
Opening of cable connection of RTCC Panel & MB of 20MVA T/F-I , including dismantling of RTCC Panel & Marshalling Box.
OPENING OF CABLE TERMINATION FROM RTCC, MARSHALLING BOX CONTROL PANEL
Cabling and interconnection of RTCC Panel of New 40MVA T/F in the control room with Marshalling Box in the switchyard.
LAYING, DRESSING AND BINDING OF CABLE INCLUDING FIXING OF CABLE TRAY, SUPPORT STRUCTURE AND TERMINATION OF CABLE MARKING AND ITS FERRULING AS PER CABLE SCHEDULE AND INTER- CONNECTION INCLUDING SHIFTING OF OLD CABLE AS PER REQUIREMENT OF RTCC PANEL,MARSHALLING BOX, DRIVING MECHANISM,OTI,WTI BUCHOLZ RELAY,PRV, COOLING FANS, PUMPS,OLTC MARSHALLING BOX ETC.
Replacement of all three phase 33KV CT of 20MVA T/F-I as per instruction manual of various equipments and technical specifications including shifting of material/equipment from store to site including all other associated work to complete the job satisfactorily including cabling work.
REPAIR/REPLACEMENT WORK OF 36 KV CURRENT TRANSFORMER
Replacement of 36KV Bus Isolator of 20MVA T/F-I and erection of new 36KV 2000A Bus Isolator including shifting of material/equipment from store to site including all other associated work to complete the job satisfactorily.
LINE ISOLATOR/BUS ISOLATOR/TENDOM ISOLATOR :DISMANTLING OF BUS ISOLATORS HBB/TMG/HLM MAKE POST INSULATOR AFTER OPENING OF NUT-BOLT, OPENING OF JUMPERS, DISCONNECTIONOF CONTROL CABLE AND SHIFTING OF DISMANTLLED ISOLATOR TO STORE AS PER INSTRUCTION OF SUPERVISING ENGINEER.ERECTION OF BUS ISOLATORS OF DIFFERENT MAKE AS PER INSTRUCTION MANUAL AND TECHNICAL SPECIFICATION WITH POST INSULATOR, OPERATING MECHANISM BOX, TIE ROD, ARMS AND PROPER ALIGNMENT FOR SMOOTH OPERATION. THIS WORK ALSO INCLUDED SHIFTING OF NEW ISOLATOR FROM STORE TO SITE, TERMINATION OF CONTROL CABLE, JUMPER CONNECTION, EARTHING(PAINTED WITH GREEN COLOR) AND ALL ASSOCIATED WORK FOR COMPLETE THE JOB AS PER INSTRUCTION OF SUPERVISING ENGINEER.
Opening of jumper , cutting of earthing strip and dismantling of 132KV LA complete with structure after shifting of 20MVA T/F-I and then re-erection of 132KV LA after the erection of 40MVA T/F.
DISMANTLING OF LA BY OPENING OF JUMPERS, DISCONNECTING EARTHING FLATS, SURGE COUNTER, OPENING OF BASE NUT-BOLT ETC FOR COMPLETION OF WORK. SHIFTING OF OLD LA WITH THE HELP OF HYDRA TO STORE AS PER DIRECTION OF SUPERVISING ENGINEER ERECTION OF NEW LA AS PER INSTRUCTION MANUAL OF VARIOUS EQUIPMENTS AND TECHNICAL SPECIFICATION INCLDING SHIFTING OF NEW LA FROM STORE TO SITE, FIXING OF SURGE COUNTER, JUMPER CONNECTION, EARTHING(PAINTED WITH GREEN COLOR) AND ASSOCIATED WORK TO COMPLETE THE WORK
Replacement including providing & fixing of all gaskets including the Top cover of 40MVA Transformer by new gaskets as per existing size made of rubberized cork sheet Kotika/Turboze/Nu cork brand grade 07. (All labour and T & P, Crane shall be arranged by the contractor at his own cost).
GASKET REPLACEMENT FOR MAIN TANK TOP COVER INVOLVING THE WORK OF OPENING THE NUT &BOLTS OF TOP COVER PLATE ,LIFTING THE TOP COVER , CLEANING THE OLD & DAMAGED GASKET AND ITS REMOVAL FOR SURFACE BY SCRATCHING & CLEANING THE TOP SURFACE ,16MM THICK MADE FROMCORK SHEET ,JOINTING & PUNCHING THE HOLE FITTING OF TOP SURFACE , FITTING THE TOP PLATE COVERS & TIGHTENING THE NUTS & BOLTS FOR PROPER COMPLETION OF WORK
Overhauling of diverter switch after removing of oil and dirty Transformer oil from its chamber & filling the fresh centrifuged Transformer oil & its centrifuging/circulation as per Norms of Transformer.
O/H DIVERTER S/W,TRANSFORMER,132/33KV
Repairing of 06 Nos radiator of 40 MVA Transformer by the help of welding machine by puncture wings and mainting of air pressure inside the radiator for checking of any leakage at 132 KV Sub-Station Shamli Shyamla
REPL,GASKET,CAP,AIR RELEASE,RADIATOR
Maintenance & overhauling of Marshalling box of 40 MVA T/F , work includes replacing damaged Overload relays, Fan Control Contactor for auto-function, Time delay relay for Fan failure indication, replacing not working switches etc. and then rewiring of all interconnection with proper ferrules and lugs of suitable size including the cost of all material to complete the job satisfactorily at 132 KV Sub-Station Shamli Shyamla.
MAINTENANCE OF BAY MARSHALLING BOX.
Attending oil leakage of OLTC of 40 MVA T/F by providing new gasket as per existing size made of rubberized cork sheet Kotika/Turboze/Nu cork brand grade 07 to complete the job satisfactorily at 132 KV Sub-Station Shamli Shyamla.
REPL,GASKET,MECHANISM,OLTC
Attending oil leakage in PRV relay of 40 MVA T/F by providing new gasket as per existing size (including the cost of all material ) at 132 KV Sub-Station Shamli Shyamla
GASKET REPLACEMENT WITH SUPPLY-PRV
Attending oil leakage in BUCHHOLTZ relay of 40 MVA T/F by providing new gasket as per existing size (including the cost of all material ) at 132 KV Sub-Station Shamli Shyamla
GASKET REPLACEMENT WITH SUPPLY-BUCCHOLZ RELAY
Attending loil leakage in OSR relay of 40 MVA T/F by providing new gasket as per existing size (including the cost of all material ) at 132 KV Sub-Station Shamli Shyamla
GASKET REPLACEMENT WITH SUPPLY-OIL SURGE RELAY
Gupta Elect and Engg Works
Meena Elect & Engg. Works
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .