Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.4 LAdmitted-Finance FLAT NO 1004 BUILDING NO L 11 KEDAR HOUSING SOCIETY 10TH FLOOR SECTOR NO 21 TALOJA PHASE 2 PANVEL RAIGAD NAVI MUMBAI 410208 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410208 | ₹23.4 L | L1 | Admitted-Finance |
| 2 | L2₹26.7 L+₹3.3 L (14.1%)Admitted-Finance 601 6TH FLOOR MANGOOR VALLEY NEAR GURUDWARA MANGOOR HILLL VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | ₹26.7 L+₹3.3 L (14.1%) | L2 | Admitted-Finance |
| 3 | L3₹29.3 L+₹5.9 L (25.1%)Admitted-Finance T 3 HILL CREST APARTMENT BEHIND AMBABAI TEMPLE VASCO DA GAMA GOA 403 802 | VASCO DA GAMA | SOUTH GOA | GOA | 403802 | ₹29.3 L+₹5.9 L (25.1%) | L3 | Admitted-Finance |
| 4 | L4₹29.3 L+₹5.9 L (25.2%)Admitted-Finance | ₹29.3 L+₹5.9 L (25.2%) | L4 | Admitted-Finance |
| 5 | L5₹31.0 L+₹7.5 L (32.2%)Admitted-Finance | ₹31.0 L+₹7.5 L (32.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Leo Elevator Company L5 | PREMIER ENGINEERING SYSTEMS L6 | M/S MANOJKUMAR M NAGARKATTE L4 | U k Enterprises L3 | M/s ASPIRE ENGINEERING ENTERPRISES L1 | SHIVANI ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of OTIS make Per Month total 03 Nos lifts of Raksha-I, Raksha-II & Pratiraksha bldg at DCRA colony (13 passengers 884kg for G+5 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge. | 12 | Per Month | 31,500 ₹3,78,000 Lowest | 47,000 ₹5,64,000 | 40,000 ₹4,80,000 | 45,000 ₹5,40,000 | 52,000 ₹6,24,000 | 42,000 ₹5,04,000 |
| 1.10(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores. (3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items. (4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed. | |||||||||
| 2.00 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of OTIS make Per Month total 01 No lift at Acharya colony (13 passengers 884kg for G+8 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed. | 12 | Per Month | 12,500 ₹1,50,000 Lowest | 34,000 ₹4,08,000 | 36,000 ₹4,32,000 | 26,000 ₹3,12,000 | 19,000 ₹2,28,000 | 21,000 ₹2,52,000 |
| 3.00 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of OTIS make Per Month total 01 No lift at Acharya colony (08 passengers 544kg for G+8 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed. | 12 | Per Month | 11,500 ₹1,38,000 Lowest | 15,000 ₹1,80,000 | 28,000 ₹3,36,000 | 26,000 ₹3,12,000 | 17,000 ₹2,04,000 | 13,000 ₹1,56,000 |
| 4.00 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of KONE make Per Month total 01 No lift at Suraksha bldg (13 passengers 844kg for G+9 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed.
NOTE: Item No. 04 shall started from December 2026 | 7 | Per Month | 12,500 ₹87,500 Lowest | 30,000 ₹2,10,000 | 24,000 ₹1,68,000 | 26,000 ₹1,82,000 | 30,000 ₹2,10,000 | 23,000 ₹1,61,000 |
| 5.00 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of KONE make Per Month total 02 No lift at Suraksha bldg (08 passengers 544kg for G+9 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed.
NOTE: Item No. 05 shall started from December 2026 | 7 | Per Month | 23,000 ₹1,61,000 | 17,500 ₹1,22,500 | 15,000 ₹1,05,000 | 14,500 ₹1,01,500 Lowest | 16,500 ₹1,15,500 | 15,000 ₹1,05,000 |
| 6.00 | Inspection of lift by lift inspector authorised by the Goa State Govt and submission of lift test certificate complete all as specified and directed. | 16 | Each Job | 12,000 ₹1,92,000 | 10,000 ₹1,60,000 | 6,600 ₹1,05,600 | 6,000 ₹96,000 | 5,000 ₹80,000 | 4,600 ₹73,600 Lowest |
| 7.00 | Supply, installation, testing and commissioning of Lift Control Panel complete with microprocessor based controller, power and control contactors, relays, MCB/MCCB, terminal blocks, VVVF drive interface, transformer, wiring harness, fault diagnostic system, metal enclosure with powder coated finish, ventilation arrangement and all necessary accessories suitable for smooth and safe operation of lift system, complete all as specified and directed. | 1 | Each | 1,95,000 ₹1,95,000 Lowest | 4,60,000 ₹4,60,000 | 4,30,000 ₹4,30,000 | 4,50,000 ₹4,50,000 | 2,90,000 ₹2,90,000 | 5,15,000 ₹5,15,000 |
| 8.00 | Supply and replacement of defective / damaged LOP Panel of existing lift complete with dismantling of old unit, fixing new panel, wiring connection, testing and commissioning complete all as specified and directed. | 3 | Each | 8,500 ₹25,500 Lowest | 16,000 ₹48,000 | 13,800 ₹41,400 | 15,000 ₹45,000 | 12,500 ₹37,500 | 14,000 ₹42,000 |
| 9.00 | Supply, installation, testing & commissioning of RBI (Rescue Battery Inverter) unit complete for lift system, consisting of battery charger, inverter, maintenance free batteries, control panel and necessary accessories for automatic rescue operation during mains failure, complete all as specified and directed. | 2 | Each | 1,25,000 ₹2,50,000 | 45,000 ₹90,000 | 32,000 ₹64,000 | 34,000 ₹68,000 | 24,500 ₹49,000 Lowest | 34,000 ₹68,000 |
Tender Value
₹31.7 L
EMD Value
₹63,400
Closing Date
6 Aug 2026, 6:00 pmClosed
COL SAIKAT DE CWE NAVY VASCO
CWE NAVY VASCO VASCO DA GAMA GOA 403802
COMPREHENSIVE MAINTENANCE OF LIFTS INSTALLED AT DCRA COLONY AND ACHARAYA ENCLAVE UNDER GE (NW) VASCO
2026_MES_777348_1
86108
Open Tender
Civil Works
Item Rate
Vasco
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
GE (NW) Vasco
₹63,400
Yes
18 Aug 2026
9 Jul 2026
8 Aug 2026
9 Jul 2026
6 Aug 2026
23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of OTIS make Per Month total 03 Nos lifts of Raksha-I, Raksha-II & Pratiraksha bldg at DCRA colony (13 passengers 884kg for G+5 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge. | 12 | Per Month | 53 | ₹636 |
| 1.1 | (2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed. | - | - | - | - |
| 2 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of OTIS make Per Month total 01 No lift at Acharya colony (13 passengers 884kg for G+8 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed. | 12 | Per Month | 10 | ₹120 |
| 3 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of OTIS make Per Month total 01 No lift at Acharya colony (08 passengers 544kg for G+8 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed. | 12 | Per Month | 11 | ₹132 |
| 4 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of KONE make Per Month total 01 No lift at Suraksha bldg (13 passengers 844kg for G+9 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed.
NOTE: Item No. 04 shall started from December 2026 | 7 | Per Month | - | - |
| 5 | Comprehensive maintenance, Repair & Routine maintenance of electrically operated passengers lifts of KONE make Per Month total 02 No lift at Suraksha bldg (08 passengers 544kg for G+9 floors) including carrying out daily check and periodical services and attending lift breakdown incase of emergency for a period of 12 months, oiling and cleaning of controller, Motor, Machine, oiling and greasing of guide rails amd bearings, replacement of oil and spares as required as specified and directed by Engr-in-Charge.
(1) Monthly servicing, maintenance will be carried out once in a month by trained lift technician and servicing report will be submitted to Engr-in-Charge.
(2) For any breakdown of any lift will be attended within 06 to 24 Hours (depend on type of fault) and made serviceable subject to availability of stores.
(3) Spare parts/material required for smooth operation of lift are including in quoted rate except schedule Items.
(4) Contractor has to undertake repair/servicing required periodically to UPS & Battery of ARD system including calibration of UPS as per company recommendation for its smooth functioning complete all as specified and as directed.
NOTE: Item No. 05 shall started from December 2026 | 7 | Per Month | 10 | ₹70 |
| 6 | Inspection of lift by lift inspector authorised by the Goa State Govt and submission of lift test certificate complete all as specified and directed. | 16 | Each Job | 10 | ₹160 |
| 7 | Supply, installation, testing and commissioning of Lift Control Panel complete with microprocessor based controller, power and control contactors, relays, MCB/MCCB, terminal blocks, VVVF drive interface, transformer, wiring harness, fault diagnostic system, metal enclosure with powder coated finish, ventilation arrangement and all necessary accessories suitable for smooth and safe operation of lift system, complete all as specified and directed. | 1 | Each | - | - |
| 8 | Supply and replacement of defective / damaged LOP Panel of existing lift complete with dismantling of old unit, fixing new panel, wiring connection, testing and commissioning complete all as specified and directed. | 3 | Each | 1 | ₹3 |
| 9 | Supply, installation, testing & commissioning of RBI (Rescue Battery Inverter) unit complete for lift system, consisting of battery charger, inverter, maintenance free batteries, control panel and necessary accessories for automatic rescue operation during mains failure, complete all as specified and directed. | 2 | Each | 1.25 | ₹2.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_870597.xls
BOQ • 0.36 MB
86108Tender.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .