Construction of drains and C.C. on both sides of the street in the Ram Complex building no. 23, Ward 70, Ram Nagar.
2026_DOLBU_1191134_11
132/Nirman/2026-27 Dated 18-09-2026 (601-700)
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹29,136
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentiling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer in charge with in a distance of 60 metre (200 feet ) | 3.3 | M3 | 1,340 | ₹4,422 |
| 2 | Dismentiling of old damage brick work and stone work i/c stacking of dismentiling materials as directed by E/I with in a distance of 60.00 M | 6.4 | M3 | 600 | ₹3,840.54 |
| 3 | First class brick work in 1:4 one cement &four coarse sand of 2.20 F.M.mortar. | 32.95 | M3 | 5,170 | ₹1,70,351.5 |
| 4 | concrete with 4 cm gauge brick ballast fine sand of 1.25 FM and cement in proportion of 1:6:12 in foundation under floors including supply of all material labour tools & plants etc . | 9.57 | M3 | 4,000 | ₹38,280 |
| 5 | PCC (1:2:4) same as above item no-279 but with 2cm Gauge stone grit instead of 4cm gauge stone ballast | 5.17 | M3 | 7,050 | ₹36,476.7 |
| 6 | 12mm thick cement plaster in 1:4 one cement four coarse sand mix mortar | 130.08 | M2 | 200 | ₹26,016 |
| 7 | Supply and laying 0f 22.4 to 53 mm gauge stone ballast with stacking for measurmentetc all complete as pre direction of engineer in charge | 38.44 | M3 | 2,151.2 | ₹82,688.69 |
| 8 | Supply of screening material with stacking for measurement etc all complete as per direction of engineer in - charge | 6.92 | M3 | 2,050.2 | ₹14,185.15 |
| 9 | consolidation for above stone ballast and GSB including sorting into three size compacting by 8 tonn road roller including hire fuel charge including required compaction etc all complete as per direction of engineer in charge | 38.44 | M3 | 690 | ₹26,522.5 |
| 10 | construction of un reinforced plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 grade coaresand fine aggregate conforming to PWD SOR 2022 | 50.69 | M3 | 7,675 | ₹3,89,030.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.10 MB
BOQ_2245979.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .