Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Approved By S.E. Civil Tender Committee Noida |
| 2 | Accepted-Technical | Accepted-Technical Approved By S.E. Civil Tender Committee Noida |
| 3 | Accepted-Technical | Accepted-Technical Approved By S.E. Civil Tender Committee Noida |
| 4 | Accepted-Technical KH 161 2ND FLOOR H BLOCK KAVI NAGAR GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | Accepted-Technical Approved By S.E. Civil Tender Committee Noida |
| 5 | Accepted-Technical | Accepted-Technical Approved By S.E. Civil Tender Committee Noida |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
3 Jul 2026, 2:00 pmClosed
Superintending Engineer
Electricity Civil Transmission Circle 220 KV Sub Station Sector 20 Noida
Construction of 01 No 33 KV Rajendra Nagar 1st Bay at 132KV S/S Mohan Nagar Ghaziabad
2026_UPCTL_1161502_1
Short Term E-Tender Notice 08/2026-27 Sl No-13/2026-27
Open Tender
Civil Works
Percentage
30 days
GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹296
E.E. E.C.T.D
₹2,000
28 Jul 2026
17 Jun 2026
4 Jul 2026
17 Jun 2026
3 Jul 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) , including dressing if sides and ramming of bottoms, for all lift, includingf getting out the excavated soil and disposal of surplus excavated soil as dirtected, within a lead of 50 m. All kinds of soil. | 9.65 | CUM | 198.47 | ₹1,915.24 |
| 2 | Providing and laying in position cement concrete of specified grade 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)excluding the cost of centering and shuttering - All work up to plinth level : | 1.15 | CUM | 4,970.28 | ₹5,715.82 |
| 3 | Providing and laying in position cement concrete of specified grade1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) excluding the cost of centering and shuttering - All work up to plinth level : | 1.45 | CUM | 6,359.7 | ₹9,221.56 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources), excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | 2.55 | CUM | 6,897.17 | ₹17,587.78 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | - | SQM | 299.01 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. | 7.55 | SQM | 732.97 | ₹5,533.92 |
| 7 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.78 | Cum | 8,071.5 | ₹6,295.77 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | KG | 82.23 | - |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand). | 1.2 | CUM | 5,619.95 | ₹6,743.94 |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 189.86 | KG | 101.94 | ₹19,354.33 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.19 MB
BOQ_2177181.xls
BOQ • 0.39 MB
PQR13.pdf
Tender Documents • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .