Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance KAMLA VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 Cr+₹8.0 L (6.25%)Admitted-Finance 7C GOVIND NAGAR MATHURA | MATHURA | MATHURA | L2 | Admitted-Finance |
Tender Value
₹1.6 Cr
EMD Value
₹9.9 L
Closing Date
5 Oct 2026, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
New Construction work of Pisawa to Raheda road
2026_CEAGR_1190473_8
4758/14M-AC/2026-27 dated 25-08-2026
Open Tender
Civil Works
Percentage
210 days
Mathura
New Construction
2 documents required · 2 mandatory
₹2,360
₹9.9 L
Yes
Agra
9 Oct 2026
28 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Group-A
Construction of Embankment with Material Obtained from Borrow Pits / Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (3.4/3.4/301.5) | 2,840 | Cum | 110 | ₹3,12,400 |
| - | Construction of Embankment with Material Obtained from Roadway Cutting / Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5.(3.3/3.3/301.5) | 5,290 | Cum | 58 | ₹3,06,820 |
| - | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. / Excavation for roadwork in soil with hydraulic excavator of cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3.(3.5/302/(iii)) | 5,290 | Cum | 37.5 | ₹1,98,375 |
| - | Construction of Subgrade and Earthen Shoulders - Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (3.14/3.14/303.1) | 1,980 | Cum | 100 | ₹1,98,000 |
| - | Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete as per MORD clause 401.1 & as directed by Engineer Incharge including all machinery charges & including all labour, T&P etc required for proper completion of the work. | 780 | Cum | 2,640 | ₹20,59,200 |
| - | Providing, laying, spreading and compacting machine crushed stone ballast of approved quarry of 53~22.4mm size to water bound macadam of G-3 specification including spreading in uniform thickness, hand packing rolling with power roller 8 to 10 tonnes in stages to proper grade and camber applying and brooming with crushable screening material i.e. stone dust to fill-up the interstices of coarse aggregate, watering & rolling making necessary earthen bund to protect edges, lighting, guarding, barricadding etc. including the cost of all materials, labour, T & P etc. required for proper completion of work as per MORD specifications no 405. | 560 | Cum | 3,230 | ₹18,08,800 |
| - | Construction of un-reinforced, plain cement concrete avement thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion, construction and constructionl joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, curing compund (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501. (For Mathura) | 1,125 | Cum | 8,350 | ₹93,93,750 |
| - | Excavation for Structures / Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. / Rate as per item No.11.1 of Chapter 11 / Rate as applicable for the type of soil/rock are to be taken | 240 | Cum. | 400 | ₹96,000 |
| - | PCC 1:3:6 in Foundation
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109 / Rate as per item No.11.4 of Chapter 11 | 29 | Cum. | 7,300 | ₹2,11,700 |
| - | Brick Masonry Work in cement mortar in foundation of Head walls complete exculding pointing and plastering as per drawing and technical specification Clause 1109 / (A) Brick Masonry in 1:4 cement mortar / Rate as per item No.11.5 (ii) Chapter 11 | 19 | Cum. | 6,350 | ₹1,20,650 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
T2_08_PisawatoRaheda.pdf
Tender Documents • 3.90 MB
BOQ_2244782.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .