| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L | L1 | Accepted-AOC LER |
| 2 | L2₹9.4 LRejected-Finance S O ASSIAN NO 5 396 DURAISAMY PURAM PICHAMPALAYAMPUDHUR TIRUPUR 641 603 | TIRUPUR | TIRUPUR | TAMIL NADU | 641603 | ₹9.4 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | BABU L2 | GOVINDASAMY L1 |
|---|---|---|---|---|---|
| 1.00Part I : Rejuvenation of Kollakotta kulam with Desilting Construction of inlet and Bathing Ghat Lining wall in Mallavadi @ Mallavadi Panchayat. | |||||
| 1.01 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan | 48 | Cu.m | 44 ₹2,112 | 44 ₹2,112 |
| 1.02 | Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc. | 3,209.6 | Sq.m | 52.2 ₹1.7 L | 52.1 ₹1.7 L |
| 1.03Provision for Bathing Ghat | |||||
| 1.04 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 6.08 | Sq.m | 224.1 ₹1,362.53 | 224 ₹1,361.92 |
| 1.05 | C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. | 3.62 | No's | 4,967 ₹17,980.54 | 4,967 ₹17,980.54 |
| 1.06 | C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete | 6.78 | Cu.m | 5,293 ₹35,886.54 | 5,293 ₹35,886.54 |
| 1.07 | Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete | 30.9 | Cu.m | 476 ₹14,708.40 | 476.5 ₹14,723.85 |
| 1.08Provision for Baby Pond Lining wall | |||||
| 1.09 | Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B | 32.34 | Cu.m | 224 ₹7,244.16 | 224 ₹7,244.16 |
Tender Value
₹9.6 L
EMD Value
₹9,600
Closing Date
5 Aug 2023, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (V.PT) THURINJAPURAM
BLOCK DEVELOPMENT OFFICE THURINJAPURAM
Providing Infrastructure Development works to AGAMT 2023-24 Village Panchayat at Mallavadi Panchayat of 05.08.2023Thurinjapuram Block in Package No. TPRM/2023-24/05 Tiruvannamalai District.
2023_RDTN_344466_2
Roc.No. 2845/2023/A13-1 DT22.06.2023_05
Open Tender
Civil Works
180 days
THURINJAPURAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,600
4 Mar 2026
31 Jul 2023
5 Aug 2023
31 Jul 2023
5 Aug 2023
31 Jul 2023
Amount
Part I : Rejuvenation of Kollakotta kulam with Desilting Construction of inlet and Bathing Ghat Lining wall in Mallavadi @ Mallavadi Panchayat.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Baby Pond Lining wall
Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated earth SS 20 B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all material to site and all labour charges etc., complete
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Provision for In let
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supplying and erection of centering for retaining wall and bathing ghat including cost and conveyance of all material and all labour charges etc, complete
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Providing name board including lettering
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid