Loading…
Loading…
Tender Value
₹6.2 L
EMD Value
₹12,300
Closing Date
1 Sept 2026, 6:00 pm6d left
Executive Engineer (Project) PHED Div Sardarshahar
Executive Engineer (Project) PHED Div Sardarshahar
Annual rate contract for operation and Running maintenance of pump house at Malsar Under OM sub division Sardarshahar
2026_PHCJA_590653_1
26/2026-27
Open Tender
Public Health Estate Works
Percentage
90 days
Sardarshahar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
e-GRAS 4836-X.EN Project Div SARDARSHAHR
₹12,300
Yes
19 Aug 2026
19 Aug 2026
2 Sept 2026
19 Aug 2026
1 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of pipe line irrespective of size & material, which includes repairing of bursts and leakages, pollution control, survey and removal of chocking, disconnection of illegal connections, collection and recording minimum 10 nos. of residual chlorine samples during daily supply timings, inteconnection and all works related to pipe line networks in existing distribution/rising main pipe lines of all sizes by digging out suitable size of pit in loose soil/hard soil, including cutting of black top, WBM and CC top of road of any size at work site. This will also includes cutting of pipe ends, fixing of pipe piece with jointing material to make repait leak proof and refilling of pit by excavated sand by ramming it at sides of pipe and upto ground level. For entire job, contractor will use their own T&P. Contractor with his own resources shall arrange dewatering, JCB (excavator) and tractor compressor, if required any, and restore any amenety at his own cost, damaged, while performing the work in this item. This works includes daily pattrolling and repair of leakages within stipulated time and complete maintenance of pipe line network of distribution and rising main pipe line network within the scope of work for per KM pipe line per month. Jointing material shall be provided by the department | - | Per KM Per Month | - | - |
| 2 | Daily/periodical operation of valves at supply times for specified by Department per sluice valve per months (Valve rod and Cap to be arranged by the contractor) | - | - | - | - |
| 3 | 80-300mm | - | Each | - | - |
| 4 | Labour charges of repairing of starter at site including opening and reassembling of starter with labour charges for replacing of defective parts with new one at site(parts will be supplied by department) | - | - | - | - |
| 5 | 5 TO 100 HP | - | Each | - | - |
| 6 | Repair Rewinding of Submersible motor includes full servicing and rewinding (wherever required) as per manufacturer's specification and to the satisfaction of Engineer Incharge. It includes the replacement of minor parts such as bushes (oil seal bush) Nut Bolts, washers, cable seal, gland ring, vent plug, water drain plug, etc. complete jobetc.) | - | - | - | - |
| 7 | Above 17.5 HP but upto 20 HP | - | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.00 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TD26.pdf
Tender Documents • 2.46 MB
BOQ_1048945.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].