Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹2.2 Cr Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | ₹2.2 Cr | L1 |
| 2 | L2₹2.5 Cr+₹28.1 L (12.9%) Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | ₹2.5 Cr+₹28.1 L (12.9%) | L2 |
| 3 | L3₹2.5 Cr+₹29.2 L (13.4%) Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | ₹2.5 Cr+₹29.2 L (13.4%) | L3 |
| 4 | L4₹2.6 Cr+₹38.2 L (17.5%) Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya. | ₹2.6 Cr+₹38.2 L (17.5%) | L4 |
| 5 | - | - | - |
| Sl No | Description | Qty | Unit | M/s Arati Enterprises L1 | M/S BHARAT ENGINEERING WORKS L2 | NALANDA ENGICON PRIVATE LIMITED L4 | VASUDEV ELECTRICAL SYSTEMS PVT. LTD. L3 |
|---|---|---|---|---|---|---|---|
| 1 | Electrical works | - | - | -40.01 ₹2,18,41,442.95 Lowest | -32.3 ₹2,46,48,536.22 | -29.51 ₹2,56,64,332.62 | -32 ₹2,47,57,761.64 |
Tender Value
₹3.6 Cr
EMD Value
₹7.3 L
Closing Date
4 Jan 2025, 11:00 amClosed
EE&SM(E ) -1
Abhinav Gaurav
IIM Bodhgaya, Magadh University Campus,
Integration of power supply from ESS-I up to SMDB of 2 Nos. of new hostels, SITC of Heat Pump & hot water storage tank including its accessories in the 04 New Hostels, Augmentation of existing 225 KLD STP near reservoir to 350KLD and SITC of 17 Nos. of Air Conditioner and 26 nos. of Timer for control of Air Conditioner at IIM Campus Bodhgaya.
98004
01/SE&PD/BGPC/2024-2025
OPEN
Electrical Works
NCB
3 months
Gaya, Bihar
16 documents required · 16 mandatory
₹7.3 L
Not Applicable
4 Jan 2025
27 Dec 2024
4 Jan 2025
4 Jan 2025
30 Dec 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+01pdf.pdf
document • 3.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .