Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC | ₹9.0 L | 1 | Accepted-AOC 1 |
| 2 | 2₹9.1 LRejected-AOC | ₹9.1 L | 2 | Rejected-AOC 2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-not willing |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-not willing |
| Sl No | Description | Qty | Unit | K PERIYANNAN L1 | CHINNARAJ L2 |
|---|---|---|---|---|---|
| 1.00Providing Threshing floor @ Modhur H/o Boomandahalli (15X15) | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 59.07 | Cum | 250 ₹14,767.50 | 250 ₹14,767.50 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 36.95 | Cum | 5,000 ₹1.8 L | 5,000 ₹1.8 L |
| 4.00 | Supply and erecting Centering shuttering including supports for plane and side surfaces including cost and conveyance and all labour charges etc. Complete | 172.13 | Sqm | 516 ₹88,819.08 | 516 ₹88,819.08 |
| 5.00 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 43.24 | Cum | 6,000 ₹2.6 L | 6,000 ₹2.6 L |
| 6.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 25.82 | Cum | 6,200 ₹1.6 L | 6,300 ₹1.6 L |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete | 1.43 | Cum | 7,800 ₹11,154 | 8,000 ₹11,440 |
| 8.00 | Plastering in CM 1:5 12mm Thick using quality sand including conveyance of all materials to side and all labour charges for mixing, laying and curing etc complete | 15.31 | Sqm | 285 ₹4,363.35 | 285 ₹4,363.35 |
| 9.00 | Supply and Fixing of GI Pipes For Resting Shed (50mm GI Pipes) | 29.24 | Cum | 500 ₹14,620 | 500 ₹14,620 |
| 10.00 | Roofing with galvanised iron corrugated sheet of thickness 0.8mm including cost of " J " bolts and bitumen washer etc.complete | 19.89 | Cum | 1,000 ₹19,890 | 1,000 ₹19,890 |
Tender Value
₹9.2 L
EMD Value
₹10,000
Closing Date
21 May 2025, 3:00 pmClosed
The Block Development Officer (vP), Karimangalam
The Block Development Officer (vP), Karimangalam
Can be seen in the tender documents
2025_RDTN_559471_1
Roc.No.3391-2024-E1 dt16.04.2025 krm14
Open Tender
Civil Works
120 days
The Block Development Office Karimangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
30 Dec 2025
19 May 2025
21 May 2025
19 May 2025
21 May 2025
19 May 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid