| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.8 CrAccepted-AOC AG TOWER PLOT NO 303 N 3 CIDCO AURANGABAD 431003 | AURANGABAD | AURANGABAD | MAHARASHTRA | 431003 | L1 | Accepted-AOC workorder issued | |
| 2 | Rejected-Technical AT PAHUR POST JAMGAON TEL ROHA DIST RAIGAD | - | Rejected-Technical Rejected |
Tender Value
₹50.3 Cr
EMD Value
₹25.1 L
Closing Date
26 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer PMGSY Konkan Region Thane
1st floor in PWD Compound, Near Talav Pali, Thane W 400601
RD-RAI-A189-Dist-Raigad Tal-Karjat -Khalapur-Total 13 works(2nd Call)
2024_MMGSY_1072720_1
MMGSY/Raigad/TWT/17/24-25
Open Tender
Civil Works - Roads
Percentage
730 days
khalapur
Please refer Tender documents.
7 documents required · 7 mandatory
₹59,000
₹25.1 L
23 Jan 2025
20 Aug 2024
28 Aug 2024
20 Aug 2024
26 Aug 2024
20 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A) SH 88to shirvali talashi dhebewadi road (LR 72, VR 112,113) Tal-Khalapur | |||||
| 1.01 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | - | - | - | - |
| 1.02 | A)In area of non-thorny jungle | 0.56 | One Hector | 29,157.61 | ₹16,328.26 |
| 1.03 | B)In area of thorny jungle | 0.38 | One Hector | 36,243.92 | ₹13,772.69 |
| 1.04 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 961.88 | One Cubic Meter | 36.15 | ₹34,771.96 |
| 1.05 | Dismantling Stone Masonry as per Technical Specification Clause 202. (B) Rubble Stone Masonry in Cement Mortar Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | 47.23 | One Cubic Meter | 253.36 | ₹11,966.19 |
| 1.06 | Dismantling of Structures
(I) By Manual Means (B) Cement Concrete Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. | 1.2 | One Cubic Meter | 1,030.09 | ₹1,236.11 |
| 1.07 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 2,604.61 | One Cubic Meter | 81.29 | ₹2,11,728.75 |
| 1.08 | Excavation in Ordinary Rock Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per Technical Specification Clause 302.3.5 | 824.1 | One Cubic Meter | 119.44 | ₹98,430.5 |
| 1.09 | Excavation in Hard Rock (requiring blasting) with disposal upto 1000 m
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 | 329.64 | One Cubic Meter | 100.05 | ₹32,980.48 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1871866.xls
BOQ • 0.89 MB
150667704.pdf
Tender Documents • 0.75 MB
150667706.html
Tender Documents • 0.03 MB
189C.pdf
Tender Documents • 37.53 MB
A189ScheduleC.pdf
Tender Documents • 1.26 MB
RDRAIA189SBD.pdf
Tender Documents • 2.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .