| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC | ₹6.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.6 Cr+₹2.2 L (0.33%)Rejected-AOC | ₹6.6 Cr+₹2.2 L (0.33%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.9 Cr+₹31.5 L (4.81%)Rejected-AOC N A | ₹6.9 Cr+₹31.5 L (4.81%) | L3 | Rejected-AOC L3 |
| 4 | L4₹7.1 Cr+₹55.3 L (8.44%)Rejected-AOC NA | ₹7.1 Cr+₹55.3 L (8.44%) | L4 | Rejected-AOC L4 |
| 5 | L5₹7.4 Cr+₹85.6 L (13.1%)Rejected-AOC A 1 C C COLONY OPP RANA PARTAP BAGH DELHI 2021R4024 | NEW DELHI | DELHI | 110001 | ₹7.4 Cr+₹85.6 L (13.1%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Satya Parkash and Bros Pvt Ltd L5 | P C Gupta and Co L3 | pankaj kumar goyal L2 | M/S B.K.Contractor L6 | SHIVA BUILD TECH PRIVATE LIMITED L1 | M/s Dev Prayag Buildtech Pvt. Ltd. L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Granular material @ 759/- per cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. | 6,736.91 | cum | 759 ₹-51,13,314.69 Lowest | 759 ₹-51,13,314.69 Lowest | 759 ₹-51,13,314.69 Lowest | 759 ₹-51,13,314.69 Lowest | 759 ₹-51,13,314.69 Lowest | 759 ₹-51,13,314.69 Lowest |
| 2.00 | Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous material @ 2030/- Per Cum | 1,817.9 | cum | 2,030 ₹-36,90,337 Lowest | 2,030 ₹-36,90,337 Lowest | 2,030 ₹-36,90,337 Lowest | 2,030 ₹-36,90,337 Lowest | 2,030 ₹-36,90,337 Lowest | 2,030 ₹-36,90,337 Lowest |
Tender Value
₹7.9 Cr
EMD Value
₹15.8 L
Closing Date
17 Jun 2025, 5:00 pmClosed
PARDEEP SINDHU
PD - II, Gurgaon
Providing Stg. of Gurugram-Farrukhnagar-Jhajjar road (SH-15A) in Gurugram District. (Road ID 8755). (Work programme for the year 2025-2026) State Highway
2025_HRY_449729_1
2025AAC8C971 3192 4E72 AE1B 049C99DCD496622BAR
Open Tender
Civil Works
Works
135 days
Dhankot Farukh Nagar
2 documents required · 2 mandatory
₹15,000
₹15.8 L
Yes
29 Sept 2025
29 May 2025
17 Jun 2025
29 May 2025
17 Jun 2025
29 May 2025
Amount
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Granular material @ 759/- per cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- Bituminous material @ 2030/- Per Cum
Bidder Name
Amount
Satya Parkash and Bros Pvt Ltd (GSTN-06AAHCS1210Q1ZA) BID ID -1278421
P C Gupta and Co (GSTN-06AAEPG5955G1ZR) BID ID -1279907
pankaj kumar goyal (GSTN-06AAKPG4726F1ZB) BID ID -1280134
M/S B.K.Contractor (GSTN-NA) BID ID -1280136
SHIVA BUILD TECH PRIVATE LIMITED (GSTN-06AAFCS2631B1ZW) BID ID -1279940
M/s Dev Prayag Buildtech Pvt. Ltd. (GSTN-NA) BID ID -1280038
P C Gupta and Co (BID ID -1279907)
SHIVA BUILD TECH PRIVATE LIMITED (BID ID -1279940)
M/s Dev Prayag Buildtech Pvt. Ltd. (BID ID -1280038)
pankaj kumar goyal (BID ID -1280134)
M/S B.K.Contractor (BID ID -1280136)
pankaj kumar goyal (BID ID -1280134)
P C Gupta and Co (BID ID -1279907)
M/s Dev Prayag Buildtech Pvt. Ltd. (BID ID -1280038)
Satya Parkash and Bros Pvt Ltd (BID ID -1278421)
M/S B.K.Contractor (BID ID -1280136)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 1.27 MB
BOQ.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .